My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2520 MADISON ST SPRINT ANTENNA 2019-11-06
>
Address Records
>
MADISON ST
>
2520
>
SPRINT ANTENNA
>
2520 MADISON ST SPRINT ANTENNA 2019-11-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2019 11:30:51 AM
Creation date
11/6/2019 11:27:23 AM
Metadata
Fields
Template:
Address Document
Street Name
MADISON ST
Street Number
2520
Tenant Name
SPRINT ANTENNA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLANS PREPARED FOR: <br /> NOTES: <br /> 1. R SHALL BE THE CONTRACTOR'S RESPONSIBILI1Y TO COORDINATE WITH THE PROPERTY OWNER & Sprint <br /> NECESSARY UTILRY COMPANIES FOR THE LOCATION OF ALL EXISTING BELOW GRADE UTILITIES <br /> PRIOR TO BEGINNING CONSTRUCTION. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE <br /> COSTS ASSOCIATED WITH EXISTING BELOW GRADE UTILITIES <br /> 2. CONTRACTOR TO NOTE POTENTIAL INTERFERENCES WITH EXISTING UTILITIES AND HAND DIG INSIDE SITE: PANEL NAME: PPC <br /> FENCED COMPOUND AND IN VICINITY OF ALL UTILITY CROSSINGS120/340 Vac PANEL STATUS: NEW PROJECT MANAGER: <br /> VOLTAGE: Total kVA 15.76 <br /> 3. CONTRACTOR SHALL FURNISH. INSTALL AND UPGRADE ALL ELECTRICAL MATERIALS REQUIRED FOR PHASE: 1 ENQ.OSURE TYPE: NEMA 3R <br /> INSTALLATION <br /> WIRE: 3W MOUNT: SURFACE Total AMPS 65.65 <br /> 4. PROPOSED UTILITY ROUTING SHALL BE APPROVED BY UTILITY COMPANIES PRIOR TO START OF BUSS RATING: 100 AIC: 22kA <br /> CONSTRUCTION AND IS SUBJECT TO CHANGE. COORDINATION WITH UTILITIES BY OTHERS MAIN BREAKER: 100 PANEL POSITWNS: 24 10590 WEST OCEAN AIR DRIVE <br /> SUITE BREAKER BREAKER BREAKER SERVICE USAGE Ph .A Ph .B USAGE SERVICE BREAKERBREAKER BREAKER SAN DIEGO, CAG 92130 <br /> CKT LOAD DESCRIPTION (IIA) (VA) LOAD DESCRIPTION CKT <br /> AMPS POLES STATUS LOAD FACTOR WPM 71.75A FACTOR LOAD STATUS POLES AMPS PLANS PREPARED BY: <br /> 1 EQUIPMENT CABINET(ECM) 100 2 ON 6000 1 6000 1500 1 1500 ON 1 20 BATTERY CABIET(OCAIN 2 FULLEIZTON <br /> 3 6000 1 625 6000 1.25 S00 ON 1 20 SERVICEUGHT 4 ENGINEERINGOESIGN <br /> S 0 0 6 <br /> 7 0 0 B 1100 E.WOODFIELD ROAD.SUITE S00 <br /> SCHAUMBURG,ILLINOIS 60173 <br /> 9 0 o 10 TEL:847-908.8400 <br /> CIA#31ST <br /> TO POWER SOURCE 11 0 0 12 www.Wlkrcon*3151neering.cam <br /> 13 0 0 14 <br /> ENGINEERING UCENSE&SEALtl 15 0 0 16 I HEREBY CERTIFY THAT THESE DRAWINGS WERE <br /> PREPARED BY ME OR UNDER MY DIRECT <br /> NEW 1/2"C W/(2) #12 AND Ti 17 0 1080 1 1080 ON 1 20 GFCI 16 SUPERVISION AND CONTROL. AND TO THE BEST <br /> (1) #12 GND FROM PPC TO BCAB OF MY KNOWLEDGE AND BELIEF COMPLY WITH <br /> I <br /> 1S 500 0 1 800 ON 1 15 TELCO FAN 20 THE REQUIREMENTS OF ALL APPLICABLE CODES. <br /> NEW 3/4" C W/ 4 PR 24 GA 21 0 2s 1 25 ON 2 60 SURGEARRE9TOR 22 <br /> CAT-5E <br /> FROMR PPC SURGE <br /> ARRESTOR <br /> OR I 23 25 0 1 25 24 . BELL4 <br /> ¢4 OF WASyj4� , <br /> I a a 4/ er C,?' to <br /> 9 <br /> la <br /> NEW 2" C W(3) #2 AND 'IMO - <br /> (1) #8 GND FROM PPC TO ECRB y / <br /> um` POWER b ��" <br /> / — \ 9 �3 III TELCO ., -1.: 1611,.4✓/ <br /> // AC PANEL SCHEDULE SCALE: N.T.S. 2 L�s`("ONAL G <br /> ,,/ /— — — <br /> NOTE: DRAWING NOTICE: <br /> \ \ \ — . - // CONTRACTOR TO COORDINATE METER PPC PANEL THESE DOCUMENTS ARE CONFIDENTIAL AND ARE <br /> Q // / <br /> ( RELOCATION WITH UTILITY COMPANY THE SOLEUED,PROPERTY SPRIDT AND MAY NOT REPRODUCED,DISSEMINATED OR REDISTRIBUTED <br /> //// TO REMOTE TO POWER <br /> \V • • • • _ / r GENERATOR / SOURCE WITHOUT THE EXPRESSI WRITTEN CONSENT OF <br /> POWER CONNECTIONS <br /> NEW SPRINT CABINET IXISTING CONDUIT \SOURCE/ MOGUL SOCKET MOUNTING -REVISIONS: <br /> ' AND CONDUCTORS \ / 500 WATT LITHOHIA DESCRIPTION DATE BY REV <br /> v PIPE CAP <br /> ECRB SCAB I TO BE EXTENDED QUARTZ FLOOD LIGHT <br /> / — FROM EXISTETER GTO LOAD CENTER - () �1 \ <br /> n • • • • 1 NEW METER LOCATION (INTERNAL TO PPC) 100A t00A REV 1 7/18/19 ST 1 <br /> ' MECHANICAL REV 0 6/10/18 MH 0 <br /> // // / .. �� SUDE BAR REV B 5/11/18 MH B <br /> (� � NBA (E) INTERLOCK MANUFACTURERS CABLE OR OTHER CABLE REV A 5/11/18 PD A <br /> 3R METfR SPRINT SUITABLE FOR EXTENDED SUNLIGHT EXPOSURE <br /> // / \ — IJ METER 100A/2P o o--o 0 20A/1P <br /> 4.!---, <br /> 6rtECAscADEro <br /> (ty RELacATEo METER, <br /> ..__07.__ <br /> � 20A/1P METALLIC CABLE TERMINATION FRYING <br /> // W < LABELED 3 STEEL x(3.5" OD) HOT DIP GALVANIZED 152XC2O5 <br /> 1 -- — 0 0—O O _a <br /> - g 1/2-C, #6 AWG o 0 WEATHER PROOF 60 MIN. ROTARY SITE NAME: <br /> SERVICE GROUND (MIN.) �1 ) TIMER LIGHT SWITCH B <br /> ir —�' `�— 3/4" FIGS CONDUIT FOR - <br /> `D PORT GARDNER <br /> Q O = -- - 3#12 ELECTRICAL RUN SITE ADDRESS: <br /> S °1- <br /> 9 n— EXOTHERMIC WELD 2599 MADISON ST. <br /> NEW WORK LIGHT n 2oA/1P• t <br /> EVERETT,WA 98203 <br /> 1-i/4"C W/ <br /> (3) #2 AWG (MIN.) v —ten /1 13A/1 P* #2 AWG BARE SOUR TINNED COPPER PROJECT: <br /> NEW 3/4" C W/(2) #12 AND .AND (1) #8 GND (MIN.) o Ca---o o (BSTCW) TO GROUND RING <br /> DO MACRO AND <br /> WORKtu HT FROM PPC To --o 2P` To NEW POWER PROTECTION CABINET _� ' MIMO UPGRADE <br /> NEW POWER PROTECTION <br /> CABINET (PPC) WITH % SHEET DESCRIPTOR <br /> INTERNAL 24 POSITION NOTES: ELECTRICAL DET <br /> LOAD CENTER AND 1. (1 FACTORY INSTALLED. ALL OTHER C/B TO BE <br /> INTEGRATED CONNECTIONS FURNISHED AND INSTALLED BY CONTRACTOR. j <br /> FOR REMOTE GENERATOR 2. CONTRACTOR SHALL REMOVE THE FACTORY <br /> INSTALLED NEUTRAL-GROUND BOND IN THE PPC. DWG INFORMATION SHEET <br /> DRAWN BY: MH �� <br /> TYPICAL CABINET UTILITY PLAN SCALE: N.T.S. 1 SINGLE LINE DIAGRAM SCALE: N.T.S. 3 WORK LIGHT DETAIL SCALE: N.T.S. 4 CHECKED BY: ST <br /> PROJECT# 2019.0228.0007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.