PLANS PREPARED FOR <br /> THESE OUTLINE SPECIFICATIONS IN CONJUNCTION WITH THE SPRINT STANDARD CONSTRUCTION SPECIFICATIONS, INCLUDING CONTRACT DOCUMENTS AND THE <br /> CONSTRUCTION DRAWINGS DESCRIBE THE WORK TO BE PERFORMED BY THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR MEETING THE <br /> REQUIREMENTS OF SPRINT'S "STANDARD CONSTRUCTION SPECIFICATIONS FOR WIRELESS SITES" IN REGARDS TO ALL WORK COMPLETED. Sprint <br /> SECTION 01 100 - SCOPE OF WORK ALTERNATES:SECTION 01 400 - SUBMITTALS Sc TESTS REMOTE ELECTRICAL TILT (RET) CABLES: <br /> PROJECT MANAGER: <br /> THE WORK; AT THE COMPANY'S REQUEST, ANY ALTERNATIVES TO THE MATERIALS OR METHODS MISCELLANEOUS; <br /> SHALL COMPLY WITH APPLICABLE NATIONAL CODES AND STANDARDS, LATEST EDITION, SPECIFIED SHALL BE SUBMITTED TO SPRINTS CONSTRUCTION MANAGER FOR INSTALL SPUTTERS, COMBINERS, FILTERS PER RF DATA SHEET, FURNISHED BY <br /> AND PORTIONS THEREOF. APPROVAL SPRINT WILL REVIEW AND APPROVE ONLY THOSE REQUESTS MADE IN •SPRINT. <br /> WRITING. NO VERBAL APPROVALS WILL BE CONSIDERED, ANTENNA INSTALLATION: <br /> PRECEDENCE: THE CONTRACTOR SHALL ASSEMBLE ALL ANTENNAS ONSITE IN ACCORDANCE WITH <br /> SHOULD CONFLICTS OCCUR BETWEEN THE STANDARD CONSTRUCTION SPECIFICATIONSTHE INSTRUCTIONS SUPPLIED BY THE MANUFACTURER. ANTENNA HEIGHT, AZIMUTH, 10590 WEST OCEAN AIR DRIVE <br /> FOR WIRELESS SITES INCLUDING THE STANDARD CONSTRUCTION DETAILS FOR TESTS AND INSPECTIONS: AND FEED ORIENTATION INFORMATION SHALL BE A DESIGNATED ON THE SUITE 300 <br /> WIRELESS SITES AND THE CONSTRUCTION DRAWINGS, INFORMATION ON THE CONSTRUCTION DRAWINGS. SAN DIEGO, CA 92130 <br /> CONSTRUCTION DRAWINGS SHALL TAKE PRECEDENCE. PLANS PREPARED BY: <br /> A. THE CONTRACTOR SHALL. BE RESPONSIBLE FOR ALL CONSTRUCTION TESTS, THE CONTRACTOR SHALL POSITION THE ANTENNA ON TOWER PIPE MOUNTS SO <br /> SITE FAMILIARITY; INSPECTIONS AND PROJECT DOCUMENTATION. A. THAT THE BOTTOM STRUT IS LEVEL THE PIPE MOUNTS SHALL BE PLUMB TO FULLERTON <br /> CONTRACTOR SHALL BE RESPONSIBLE FOR FAMILIARIZING HIMSELF WITH ALL <br /> CONTRACT DOCUMENTS, FIELD CONDITIONS AND DIMENSIONS PRIOR TO PROCEEDING B. CONTRACTOR SHALL ACCOMPLISH TESTING INCLUDING BUT NOT UNITED TO THE j IN NREE ENGINEERING DESIGN <br /> WITH CONSTRUCTION. FOLLOWING: <br /> B. ANTENNA MOUNTING REQUIREMENTS: PROVIDE ANTENNA MOUNTING HARDWARE 1100 E.WOODFIELD ROAD,SUITE 500 <br /> ON-SITE SUPERVISION: 1. COAX SWEEPS AND FIBER TESTS PER THE CURRENT VERSION OF SPRINT SCHAUMBURG,ILLINOIS 60173 <br /> THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK AND SHALL BE TS-0200 ANTENNA LINEAS INDICATED ON THE DRAWINGS. <br /> ACCEPTANCE STANDARDS. TEL 847-90841400 <br /> RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND HYBRID CABLE INSTALLATION COA#3151 <br /> PROCEDURES IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. 2. ACL, AZIMUTH AND DOWNTILT PROVIDE AN AUTOMATED REPORT UPLOADED TO www.FulletonEngineering.corn <br /> SITERRA USING A COMMERCIAL MADE-FOR THE PURPOSE ELECTRONIC A. THE CONTRACTOR SHALL ROUTE, TEST, AND INSTALL ALL CABLES AS INDICATED <br /> DRAWINGS. SPECIFICATIONS AND DETAILS REQUIRED AT JOON THE CONSTRUCTION DRAWINGS AND IN ACCORDANCE WITH THE <br /> THE CONSTRUCTION CONTRACTOR SHALL MAINTAIN A FULL SET THE ANTENNA <br /> MUST ALIGNMENTFORM WITH RF CONFIGURATION AZIMUTH. CENTERUNE AND µ UFACTURER'S RECOMMENDATIONS. EHEREBRINGLICENSET THE <br /> I HEREBY CERTIFY THAT THESE DRAWINGS WERE <br /> CONSTRUCTION DRAWINGS AT THE JOBSITE FROM MOBILIZATION THROUGH PREPARED BY ME OR UNDER MY DIRECT <br /> CONSTRUCTION COMPLETION. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL CORRECTIONS TO B. THE INSTALLED RADIUS OF THE CABLES SHALL NOT BE LESS THAN THE SUPERVISION AND CONTROL, AND TO THE BEST <br /> UEF COMPLY WITH <br /> ANY WORK IDENTIFIED AS UNACCEPTABLE IN SITE. INSPECTION ACTMTIES <br /> MANUFACTURER'S SPECIFICATIONS FOR BENDING RADII. THE MY <br /> EMENTS OF ALLLEDGE AND EAPPLICABLE CODES. <br /> A. DETAILS ARE INTENDED TO SHOW DESIGN INTENT. PROVIDE AU. MATERIALS AND AND/OR AS A RESULT OF TESTING. C. EXTREME CARE SHALL BE TAKEN TO AVOID DAMAGE TO THE CABLES DURING <br /> LABOR AS REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING SYSTEM. BEL <br /> MODIFICATIONS MAY BE REQUIRED TO SUIT JOB DIMENSIONS OR CONDMONS, AND 4. ALL TESTING REQUIRED BY APPLICABLE INSTALLATION MOPS. HANDLING AND INSTALLATION. L� WA SUCH MODIFICATIONS SHALL BE INCLUDED AS PART OF THE WORK. 4 of Ht <br /> 14 <br /> C. REQUIRED CLOSEOUT DOCUMENTATION INCLUDES. BUT IS NOT LIMITED TO THE 1. FASTENING MAIN HYBRID CABLES: AU. CABLES SHALL BE INSTALLED INSIDE MONOPOLE WITH CABLE �� �ti ICJ <br /> B. CONTRACTOR SHALL NOTIFY SPRINT CONSTRUCTION MANAGER OF ANY VARIATIONS FOLLOWING; SUPPORT GRIPS AS REQUIRED BY THE MANUFACTURER. ,' ti 0 7 <br /> PRIOR TO PROCEEDING WITH THE WORK.DIMENSIONS SHOWN ARE TO FINISH <br /> SURFACES UNLESS NOTED OTHERWISE. MODIFICATIONS MAY BE REQUIRED TO SUIT 1. AZIMUTH, DOWNTILT, AGL FROM SUNS1GHT INSTRUMENTS - ANTENNAUGN 2. FASTENING INDMDUAL FIBER AND DC CABLES ABOVE BREAKOUT ENCLOSURE (MEDUSA), WITHIN <br /> JOB DIMENSIONS OR CONDITIONS, AND SUCH MODIFICATIONS SHALL BE INCLUDED ALIGNMENT TOOL (AAT) THE MMBS CABINET AND ANY INTERMEDIATE DISTRIBUTION BOXES: 9. `i�, <br /> AS PART OF THE WORK. -1,".: albl I �� <br /> 2. SWEEP AND FIBER TESTS a. FIBER: SUPPORT FIBER BUNDLES USING W VELCRO STRAPS OF THE REQUIRED LENGTH 0 18" O.- • 161, "'S <br /> C. MARK THE FIELD SET OF DRAWINGS IN RED, DOCUMENTING ANY CHANGES FROM OC. STRAPS SHALL BE UV, OIL AND WATER RESISTANT AND SUITABLE FOR INDUSTRIALS G <br /> THE CONSTRUCTION DOCUMENTS. 3. SCALABLE BARCODE PHOTOGRAPHS OF TOWER TOP AND INACCESSIBLE INSTALLATIONS AS MANUFACTURED BY TEXTOL OR APPROVED EQUAL `TONAL <br /> SERIALIZED EQUIPMENT <br /> P TIES TO BE UV <br /> METHODS OF PROCEDURE (MOPS) FOR CONSTRUCTION: 4. ALL AVAILABLE JURISDICTIONAL PERMIT AND OCCUPANCY INFORMATION b. STTABIILIZED. BLPORT ACK�NYYLON. WITH TS WITH ENSILE STRENGTH TIES OF THE AAT12.000 PTE SI TMAS ZIMANUFACTURED BY <br /> DRAWING NOTICE <br /> CONTRACTOR SHALL PERFORM WORK AS DESCRIBED IN NELCO PRODUCTS OR EQUAL. THESE DOCUMENTS ARE CONFIDENTIAL AND ARE <br /> 5. PDF SCAN OF REDUNES PRODUCED IN FIELD THE SOLE PROPERTY OF SPRINT AND MAY NOT BE <br /> A. COAX COLOR CODING SWEEPS AND FIBER TESTING TS-0200 AND EL-0568 3. FASTENING JUMPERS: SECURE JUMPERS TO THE SIDE ARMS OR HEAD FRAMES USING STAINLESS REPRODUCED,DISSEMINATED OR REDISTRIBUTED <br /> 6. A PDF SCAN OF REDUNE MARK-UPS SUITABLE FOR USE IN ELECTRONIC STEEL TIE WRAPS OR STAINLESS STttL BUTTERFLY CUPS. WITHOUT THE EXPRESS WRITTEN CONSENT OF <br /> B. CABLE LABEUNG EN-2012-00 AS-BUILT DRAWING PRODUCTION SPRINT. <br /> 4. CABLE INSTALLATION: -REVISIONS: <br /> C. APPUCABLE INSTALLATION MOPS IDENTIFIED ELSEWHERE IN THE CONTRACT 7. UEN WAIVERS a. INSPECT CABLE PRIOR TO USE FOR SHIPPING DAMAGE, NOTIFY THE CONSTRUCTION MANAGER. DESCRIPTION DATE BY REV <br /> DOCUMENTS <br /> 8. FINAL PAYMENT APPLICATION <br /> D. SPRINT GROUNDING SPECIFICATION NE-312-201 b. CABLE ROUTING: CABLE INSTALLATION SHALL BE PLANNED TO ENSURE THAT THE UNES WILL REV 1 7/18 19 ST 1 <br /> 9. REQUIRED ANAL CONSTRUCTION PHOTOS BE PROPERLY ROUTED IN THE CABLE ENVELOP AS INDICATED ON THE DRAWINGS. AVOID <br /> E. SPRINT INTEGRATED CONSTRUCTION STANDARDS VERSION 4.0 TWISTING AND CROSSOVERS. REV 0 7/10 18 MH 0 <br /> 10.CONSTRUCTION AND COMMISSIONING CHECKLIST COMPLETE WITH NO DEFICIENT REV B Sf28 18 MH B <br /> SECTION 01 200 - COMPANY FURNISHED MATERIAL AND ITEMS c. HOIST CABLE USING PROPER HOISTING GRIPS. DO NOT EXCEED MANUFACTURES RECOMMENDED REV A s5?11/18 PD A <br /> MAXIMUM BEND RADIUS. <br /> EQUIPMENT 11. APPLICABLE POST NTP TASKS INCLUDING DOCUMENT UPLOADS COMPLETED IN SITE CASCADE ID: <br /> SITERRA (SPRINTS DOCUMENT REPOSITORY OF RECORD). 5. GROUNDING OF TRANSMISSION UNES: AU. TRANSMISSION LINES SHALL BE GROUNDED AS INDICATED <br /> COMPANY FURNISHED MATERIAL AND EQUIPMENT IS IDENTIFIED ON THE RF DATA ON DRAWINGS. SE52XC205 <br /> SHEET IN THE CONSTRUCTION DRAWINGS. 12.CLOSEOUT PHOTOGRAPHS AND CLOSEOUT CHECKLIST: SPRINT WILL PROVIDE 6. HYBRID CABLE COLOR CODING: AU. COLOR CODING SHALL BE AS REQUIRED IN THE CURRENT <br /> SEPARATE GUIDANCEVERSION OF SPRINT TS-0200. <br /> CONTRACTOR IS RESPONSIBLE FOR SPRINT PROVIDED MATERIAL AND EQUIPMENT TO /-SITE NAME: <br /> ENSURE IT IS PROTECTED AND HANDLED PROPERLY THROUGHOUT THE CONSTRUCTION SECTION 11 700 - ANTENNA ASSEMBLY. REMOTE 7. HYBRID CABLE LABELING: INDMDUAL HYBRID AND DC BUNDLES SHALL BE LABELED <br /> DURATION. RADIO UNITS AND CABLE INSTALLATION ALPHA-NUMERICAU.Y ACCORDING TO SPRINT CELL SITE ENGINEERING NOTICE - EN 2012-001, PORT GARDNER <br /> SUMMARY: REV 1 <br /> CONTRACTOR RESPONSIBLE FOR RECEIPT OF SPRINT FURNISHED EQUIPMENT AT CELLSITE ADORES& <br /> SITE OR CONTRACTORS LOCATION. CONTRACTOR TO COMPLETE SHIPPING AND WEATHERPROOFING EXTERIOR CONNECTORS AND HYBRID CABLE GROUND KITS; <br /> RECEIPT DOCUMENTATION IN ACCORDANCE WITH COMPANY PRACTICE. THIS SECTION SPECIFIES INSTALLATION OF ANTENNAS. RRU'S, AND CABLE A. M.L. FIBER & COAX CONNECTORS AND GROUND KITS SHILL BE 2599 MADISON ST. <br /> EQUIPMENT, INSTALLATION, AND TESTING OF COAXIAL FIBER CABLE. WEATHERPROOFED. EVERETT,WA 98203 <br /> SECTION 01 300 - CELL SITE CONSTRUCTION ANTENNAS AND RRU'S; B. WEATHERPROOFED USING KW OF THE FOLLOWING METHODS. ALL <br /> THE NUMBER AND TYPE OF ANTENNAS AND RRU'S TO BE INSTALLED IS DETAILED INSTALLATIONS MUST BE DONE IN ACCORDANCE WITH THE MANUFACTURER'S PROJECT: <br /> (NOTICE TO PROCEED; ON TIE CONSTRUCTION DRAWINGS. RECOMMENDATIONS AND INDUSTRY BEST PRACTICES. DO MACRO AND <br /> NO WORK SHALL COMMENCE PRIOR TO COMPANY'S WRITTEN NOTICE TO PROCEED <br /> AND THE ISSUANCE OF WORK ORDER. .I4I 0..46114 1. COLD SHRINK: ENCOMPASS CONNECTOR IN COLD SHRINK TUBING AND PROVIDE A DOUBLE WRAP MIMO UPGRADE <br /> HYBRID CABLE WILL BE DC/FIBER AND FURNISHED FOR INSTALLATION AT EACH OF 2' ELECTRICAL TAPE EXTENDING 2' BEYOND TUBING. PROVIDE 3M COLD SHRINK CXS SERIES <br /> IMEMSITE CABLE SHALL BE INSTALLED PER THE CONSTRUCTION DRAWINGS AND THE OR EQUAL SHEET DESCRIPTION: <br /> CONTRACTOR SHALL KEEP THE SITE FREE FROM ACCUMULATING WASTE MATERIAL APPUCABLE MANUFACTURER'S REQUIREMENTS. l///' <br /> DEBRIS. AND TRASH. AT THE COMPLETION OF THE WORK. CONTRACTOR SHALL 2. SELF-AMALGAMATING TAPE CLEAN SURFACES. APPLY A DOUBLE WRAP OF SELF-AMALGAMATING SPRINT f/// <br /> REMOVE FROM THE SITE AU. REMAINING RUBBISH. IMPLEMENTS. TEMPORARY JUMPERS AND CONNECTORS; TAPE 2' BEYOND CONNECTOR. APPLY A SECOND WRAP OF SELF-AMALGAMATING TAPE IN OPPOSITE SPECIFICATION <br /> FACILITIES, AND SURPLUS MATERIALS. FURNISH AND INSTALL 1/2" COAX JUMPER CABLES BETWEEN THE RRU'S AND DIRECTION. APPLY DOUBLE WRAP OF 2' WIDE ELECTRICAL TAPE EXTENDING 2' BEYOND THE <br /> ANTENNAS. JUMPERS SHALL BE TYPE IAF 4. FLC 12-50. CR 540. OR FXL 540. SELF-AMALGAMATING TAPE. <br /> SUPER-FLEX CABLES ARE NOT ACCEPTABLEJUMPERS BETWEEN THE RRU'S AND 3. 3M SLIM LOCK CLOSURE 71(5: SUBSTITUTIONS WILL NOT BE ALLOWEDDWG INFORMATION SHEET NUMBER <br /> . <br /> ANTENNAS OR TOWER TOP AMPLIFIERS SHALL CONSIST OF 1/2 INCH FOAM DRAWN BY: MH ��_1 <br /> DIELECTRIC, OUTDOOR RATED COAXIAL CABLE, MIN LENGTH FOR JUMPER SHALL 4. OPEN FLAME ON JOB SITE IS NOT ACCEPTABLE CHECKED BY: ST 1 <br /> BE 10"-0". <br /> PROJECT# 2019.0228.0007 <br />