My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2930 MAPLE ST KAISER PERMANENTE 2019-11-06
>
Address Records
>
MAPLE ST
>
2930
>
KAISER PERMANENTE
>
2930 MAPLE ST KAISER PERMANENTE 2019-11-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2019 1:37:16 PM
Creation date
11/6/2019 1:35:55 PM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2930
Tenant Name
KAISER PERMANENTE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/19/2019 City of Everett Page 1 <br /> 2:20:19PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B1809-043 Site Address 2930 MAPLE ST <br /> Applied 9/28/2018 Applicant NBBJ Lot <br /> Approved 11/7/2018 Owner GROUP HEALTH COOPERATIVE Block <br /> Issued 11/16/2018 Contractor M A MORTENSON Tract <br /> Parent Permit No. Description COSMETIC UPGRADES TO LEVEL 1 AND 2 <br /> Notes INCLUDES MINOR INT DEMO&NEW NO-STRUCT WALL CONSTRUCTION <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 12/6/2018 12/6/2018 BLDG DWF APPROVAL as noted Phase#1 only <br /> 08-FRAMING Walls ok to cover <br /> 12/28/2018 12/28/2018 BLDG 12-CEILING DWF NOT READY Need electrical rough-in sign off before <br /> GRID building ceiling grid inspection. <br /> (12/28/2018 2:10 PM DWF) <br /> Need electrical rough-in sign off before <br /> building grid inspection. <br /> 12/31/2018 12/31/2018 BLDG 12-CEILING DWF PARTIAL APPR 1-C area and B-1 area Partial approval <br /> GRID subject to contractor to fill,holes/conduit <br /> in ceiling. <br /> Fire protection. <br /> 1/7/2019 1/7/2019 BLDG 12-CEILING DWF PARTIAL APPR (1/7/2019 3:05 PM DWF) <br /> GRID Phase 1 only 1-c and 1-b <br /> 1/29/2019 1/29/2019 BLDG DWF APPROVAL As noted (1/29/2019 11:54 AM DWF) <br /> 08-FRAMING Areas c-1 and c-2 phase 2 framing ok to <br /> cover. <br /> 2/11/2019 2/11/2019 BLDG DWF APPROVAL as noted 2/8/2019 6:11 PM Braden Bowen <br /> 08-FRAMING Cover for the 3a <br /> Contact Name:Braden Bowen <br /> Site Address:2930 MAPLE ST <br /> Phone:4257504311 <br /> e-Mail:Braden.bowen@mortenson.com <br /> (2/11/2019 8:59 AM DWF) <br /> Contractor to fire caulk 2 electrical holes in <br /> wall/floor cavity before cover. <br /> 2/15/2019 2/15/2019 BLDG 12-CEILING DWF PARTIAL APPR eTRAKiT Inspection 2/14/2019 10:37 AM Braden Bowen <br /> GRID Request <br /> Contact Name:Braden Bowen <br /> Site Address:2930 MAPLE ST <br /> Phone:4257504311 <br /> e-Mail:Braden.bowen@mortenson.com <br /> (2/15/2019 11:16 AM DWF) <br /> Need electrical final before cover. <br /> Note:contractor need to fill hole in wall <br /> area(Cubby area)fire protection above <br /> ceiling grid. <br /> 8/9/2019 8/9/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> 8/9/2019 8/9/2019 BLDG 15-FINAL KMK APPRVD-PERF eTRAKiT Inspection 8/5/2019 3:55 PM Braden Bowen <br /> Request <br /> Contact Name:Braden Bowen <br /> Site Address:2930 MAPLE ST <br /> Phone:4257504311 <br /> e-Mail:Bradenbowen2@gmail.com <br /> INSP12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.