_ _ <br /> e: <br /> SANITARY SEWER NOTES- CITY OF EVERETT <br /> 1. ALL WORK AND MATERIALS SHALL CONFORM TO THE CITY OF EVERETf STANDARDS AND WSDOT/APWA STANDARD SPECIFICATIONS. � J o.� ' <br /> � -� �.� , <br /> 2. NO PART OF THE SANITARY SEWER SYSTEM SHALL BE COVERED, CONCEALED OR PUT INTO USE UNTIL IT HAS BEEN TESTED, INSPECTED, AND APPROVED a � a �'rn o <br /> BY THE CITY INSPECTOR. � � V cn � "• <br /> � � �rn � <br /> 3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE RECORDS AND ARE SHOWN FOR CONVENIENCE. THE CONTRACTOR � � �� � <br /> SHALL BE RESPONSIBLE FOR VERIFICATION OF LOCATIONS AND TO AVOID DAMAGE TO ANY ADDITIONAL UTIUTIES NOT SHOWN. IF CONFUCTS WITH EXISTING = �V � � �°��- �' <br /> -���_ <br /> UTILITIES ARISE DURING CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE PUBUC WORKS INSPECTOR AND ANY CHANGES REQUIRED SHALL BE �, i ����""' ' R�� � tu ��'� <br /> APPROVED BY THE CITY PRIOR TO COMMENCEMENT OF RELATED CONSTRUCTION ON THE PRQJECT. CALL 811 A MINIMUM OF 3 DAYS PRIOR TO ANY � � � � Q�,��' � �: <br /> EXCAVATION. : <br /> v, ,� -� ni�p � <br /> cti <br /> c� Ji � r;+� � � � <br /> 4. ALL SEWER MAIN EXTENSIONS WITHIN THE PUBLIC RIGHT-OF-WAY OR IN EASEMENTS MUST BE STAKED BY SURVEY FOR LINE AND GRADE PRIOR TO � ; � ' � � ��� <br /> STARTING CONSTRUCTION. ,i t ���� � � " <br /> 1 , <br /> � i � <br /> � ' l <br /> WATER NOTES- CITY OF EVERETT � 1 � <br /> 1. NO CONNECTION TO THE EXISTING MAINS WILL BE ALLOWED EXCEPT BY MEANS OF AN APPROVED BACKFLOW PREVENTION DEVICE PRIOR TO SATISFACTORY / � RESERVOIR NUMBER THREE <br /> FLUSHING, TESTING, DISINFECTION, AND RECEIPT OF SATISFACTORY BACTERIOLOGICAL TEST RESULTS. � <br /> ' � O <br /> 4 M �rAs A <br /> 2. CONNECTIONS TO AND TAPS ON EXISTING MAINS WILL BE MADE BY THE PUBLIC WORKS DEPARTMENT AT THE DEVELOPER'S EXPENSE. THE PUBLIC WORKS f � � � �.��, �F xj�`r,?� <br /> DEPARTMENT SHALL BE GIVEN AT LEAST 5 BUSINESS DAYS NOTICE FOR EACH CONNECTION. THE PUBLIC WORKS DEPARTMENT SHALL THEREAFTER ! 3 � ! N '�'�� " -' o�, <br /> DETERMINE THE DATE AND TIME AT WHICH THE CONNECTION SHALL BE MADE. ` <br /> ! w � W <br /> 3. ALL WORK AND MATERIALS MUST CONFORM TO CITY OF EVERETT STANDARDS. PECKS DRIV � � I � > .r <br /> E ! � <br /> ,1 � � � a ���1 S1TE��l <br /> 4. A PRE-CONSTRUCTION MEETING SHALL BE HELD WITH THE CITY PRIOR TO THE START OF CONSTRUCTION. THE CITY OF EVERETT PUBLIC WORKS ; � � S " ��SIONAL �'� <br /> CONSTRUCTION DIVISION MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO COMMENCEMENT OF CONSTRUCTION. � � PROJECT SIT v <br /> ! � <br /> 5. THE DEVELOPER OR THE DEVELOPER'S AUTHORIZED AGENT SHALL NOTIFY THE PUBLIC WORKS DEPARTMENT OF A PERSON WHO CAN BE CONTACTED L�'�` � � <br /> REGARDING PROBLEMS DURING CONSTRUCTION ON A 24 HOUR BASIS, � ��� N <br /> / _��BE@KSHI ER DRIVE "'�M"•---- <br /> 6. MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL AND 18 INCHES VERTICAL SEPARATION BETWEEN POTABLE AND NON-POTABLE CONVEYANCE SYSTEMS. � �' ..._ � <br /> �i ! <br /> 7. ALL Cln OF EVERETT VALVES SHALL BE OPERATED BY PUBLIC WORKS DEPARTMENT PERSONNEL ONLY. ALL VALVES, NEW AND EXISTING, SHALL BE ' � i j � I <br /> ACCESSIBLE AT ALL TIMES. � � � I� '� _ : <br /> � � � � �' i <br /> i � � �--._---__ .._,______ <br /> � �t � �� � � 63RD STREEf SE <br /> STORM DRAINAGE NOTES- CITY OF EVERETT <br /> � � ( <br /> 1. NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED, OR PUT INTO USE UNTIL IT HAS BEEN INSPECTED, TESTED, AND ACCEPTED BY THE z = /'� <br /> CITY OF EVERETT, w I l �� ` <br /> J ! � <br /> 2. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT STANDARDS AND STANDARD SPECIFICATIONS OF WSDOT/APWA. � � � I <br /> ! environmental <br /> . � � <br /> 3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE RECORDS AND ARE SHOWN FROM CONVENIENCE. THE CONTRACTOR j ! WORKS <br /> SHALL BE RESPONSIBLE FOR VERIFICATION OF LOCATIONS AND TO AVOID DAMAGE TO ANY ADDITIONAL UTILITIES SHOWN. IF CONFLICTS WITH EXISTING � <br /> UTILITIES ARISE DURING CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR AND ANY CHANGES REQUIRED SHALL BE ' ` <br /> APPROVED BY THE CITY ENGINEER PRIOR TO COMMENCEMENT OF RELATED CONSTRUCTION ON THE PROJECT. Community Design Center <br /> 4. ALL STORM SYSTEMS WITHdN THE PUBLIC RIGHT-OF-WAY OR IN EASEMENTS MUST BE STAKED BY SURVEY FOR LINE AND GRADE PRIOR TO STARTING VICINITY MAP 402 15th Avenue East <br /> CONSTRUCTION. Seattle, Washington 98112 <br /> SCALE: 1" = 200� 206.329.8300 <br /> 5. ALL CATCH BASIN GRATES MUST BE STENCILED OR STAMPED "DUMP NO WASTE, DRAINS TO STREAM, LAKE, RIVER, PUGET SOUND, OR WETLAND."CHOOSE 206.329.5494 fax <br /> APPROPRIATE FEATURE FOR THE PROJECT. <br /> CML SHEET INDEX � <br /> EROSION/SEDIMENTATION CONTROL (ESC) NOTES Everett : <br /> SHEET C1 CIVIL COVER SHEET <br /> 1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN Safe Streets <br /> (E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS> RETENTION FACILITIES, UTILITIES). SHEET C2 TEMPORARY EROSION AND SEDIMENTATION CONTROL PLAN <br /> Supportive <br /> 2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE SHEET C3 GRADING AND PAVING PLAN HOUSII� <br /> RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLEIED AND APPROVED AND VEGETATION/LANDSCAPING IS ESTABLISHED. � � <br /> SHEET C4 RIGHT OF WAY IMPROVEMENT PLAN & PROFILE <br /> 3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. DURING THE 6200 12th Dr SE <br /> CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE SHEET C5 RIGHT OF WAY IMPROVEMENT PLAN & PROFILE Everett, WA 98203 <br /> APPLICANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION. <br /> SHEET C6 STORM DRAINAGE AND UTILITY PLAN <br /> 4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A SHEET C7 CIVIL DETAILS <br /> MANNER AS TO INSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER <br /> STANDARDS. SHEET C8 CIVIL DETAILS ; <br /> 5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, SHEET C9 CIVIL DETAtLS <br /> THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND SEDIMENT-LADEN WATER ' <br /> DO NOT LEAVE THE SITE. SHEET C10 CIVIL DETAILS <br /> 6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE APPLICANT/CONTRACTOR TO ENSURE THEIR CONTINUED FUNCTIONING, <br /> ESPECIALLY AFTER STORM EVENTS. OWNER CONTACT INFORMATION <br /> - - - - - - - - - - - - - <br /> 7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A <br /> MAJOR STORM EVENT. OWNER: CATHOLIC HOUSING SERVICES OF WESTERN WASHINGTON <br /> _Civ_il Cover�nd Notes <br /> 100 23RD AVE SOUTH ` <br /> 8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A TRAPPED CATCH BASIN. ALL CATCH BASINS AND SEATTLE, WA 98114 <br /> CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM - - . <br /> SYSTEM. PROJECT MANAGER: PATRICK TIPPY <br /> 9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. PHONE: (206) 328-5654 ' <br /> ADDITIONAL MEASURES MAY BE REQUIRED TO INSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. <br /> 10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND SEDIMENT TRACKED OFF THE SITE. EMAIL: PTippyt�ccsww.org <br /> 11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE WATER BODIES IF THE PROPOSED BMPS FAIL. LOT NUMBER: CITY OF EVERETT RESERVOIR TRACT <br /> PARCEL ID: 28050600400900 _ _ _ _ _ Dat� <br /> 12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR NO MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH APRIL 20, _ _ _ _26 .lanuary 2018 <br /> AND FOR NO MORE THAN 7 DAYS FROM MAY 1 THROUGH SEPTEMBER 30. SITE ADDRESS: 6200 12TH DRIVE <br /> EVERETT, WA 98203 Pem�i�C4rr�ctioaC4r�tr�ctior�S�t <br /> _ _ _ _ _ _ _ _ _ Revisiorl� <br /> 28 Ju1�2017 BId�Permit Submittal <br /> GENERAL NOTES - - - - - - - � <br /> � _ ��SFP 2Q1ZAdd�nsium i71 <br /> 1. ALL WORKMANSHIP AND MATERIALS WILL BE IN ACCORDANCE WITH CITY OF EVERETT STANDARDS AND THE MOST CURRENT EDITION OF THE STATE OF WASHINGTON EAF�THWORK VOLUMES 2 _ ��O�T2Q1 ZA�id�ndum � <br /> STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION. <br /> 3 1�QCI 2011 P�rmi�CQrr�ctiQrls <br /> 2. ALL WORK PERTAINING TO THIS PROJECT SHALL BE SUBJECT TO INSPECTION BY CITY OF EVERETT, WSDOT, OR THEIR DESIGNATED REPRESENTATIVE(S). PRIOR TO CUT 567 CY 4 26 ,lA�l 2Q1� P�rmitCQrr�ction� <br /> ANY SITE WORK, THE CONTRACTOR SHALL THE CITY OF OLYMPIA TO SCHEDULE A PRE-CONSTRUCTION CONFERENCE. THE CONTRACTOR SHALL COORDINATE ALL FILL 1,107 CY <br /> REQUIRED INSPECTIONS AND APPROVALS WITH THE NECESSARY AHJ. <br /> NET 540 CY FILL Drawn b�r�. `° <br /> 3. A COPY OF THE APPROVED PLANS MUST BE ON-SITE WHENEVER CONSTRUCTION IS IN PROGRESS. THE APPLICANT IS RESPONSIBLE FOR OBTAINING ANY OTHER PLAN APPROVED - - - - - - - - - - - - . <br /> REQUIRED OR RELATED PERMITS PRIOR TO BEGINNING CONSTRUCTION. ' - - - - - - - - - - - -�� <br /> � � �- � Checked by�P_M.): <br /> 4. ALL LOCATIONS OF EXISTING UTILITIES AND FEATURES SHOWN ON THESE PLANS HAVE BEEN DERIVED FROM RECORD DRAWINGS AND FIELD APPROXIMATION AND UPDATED EARTHWORK I/OLUMES PUBLICSERVICES c - - - - - - - - - <br /> SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT COMPLETE. ADDITIONAL SURFACE FEATURES AND IMPROVEMENTS BEYOND THOSE INDICATED ARE - - - - - - - - - - - PA <br /> PRESENT AND IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL EXISTING �NFORMATION AND TO FURTHER DRAINAGE EROSION pUBLICWORKS _Checked by (Q_C� <br /> DISCOVER AND AVOID ANY OTHER UTILITIES AND SURFACE FEATURES NOT SHOWN HEREIN WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THESE PLANS. '� DEPARTMFNT <br /> ATER - - - - - - - <br /> 5. MAINTAIN 1' MINIMUM VERTICAL SEPARATION BETWEEN ADJACENT OR CROSSING UTILITIES. ���,-�, � vuB�c woa�s PERMTf �s Pro ect No. <br /> :' /� ""' REQUIRED PRIOR TO STARTING - - - - - - - - - - �- - - <br /> SEWER ANY CONSTRUCfiON ON THIS <br /> 6. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL IN ACCORDANCE WITH U.S. DEPARTMENT OF TRANSPORTATION MANUAL ON UNIFORM TRAFFIC vRo�ecr. APPROVAL fOR THIS _ _ 16-029A <br /> PRO)ECT IS CONDIT20NAL PER <br /> CONTROL DEVICES (MUTCD�. PRIOR TO DISRUPTION OF ANY TRAFFIC, TRAFFIC CONTROL PLANS WILL BE PREPARED AND SUBMITTED TO THE CITY OF APPROVAL. NO TFtAFF cuaRem cro sr N ARDS AMD <br /> WORK WILL COMMENCE UNTIL ALL APPROVED TRAFFIC CONTROL IS IN PLACE. ��_ exPrRes�7_"S�uN�ss <br /> PERMIT POR CONSTRUCTION HAS <br /> C GINEER BEENISSUED. ` <br /> �� <br /> C1 �� <br />