|
I
<br /> WAC 296-46B-900 ELECTRICAL PLAN REVIEW
<br /> DIRECTIONS: Read the WAC section below to determine if plan review is required or not required.Then select the box next to(a)to
<br /> tell City Staff if plan review is not requried and select the box next to the specific reason from WAC 296-46B-900. If plan review is
<br /> required,select the box next to(b)and (c)to acknowledge that plan review is required and the electrical plans have been provided
<br /> I with this permit application.
<br /> 3 ,
<br /> If item(a)-(ii,iii,or v)is selected,the work must also comply with section (a)-(vii).See arrow flow chart below.
<br /> (3) Electrical plan review.
<br /> (a)Electrical plan review is:,ta9t re.ti ire for:
<br /> U (i)Low voltage systems;
<br /> .-0 (ii)Lighting specific projects that result in an electrical load reduction on each feeder involved in the project;
<br /> 0 (iii)Heating and cooling specific retrofit projects that result in an electrical load reduction on each existing feeder
<br /> involved in the project, provided there is not a corresponding increase in the available fault current in any feeder.
<br /> (iv)Stand-alone utility fed services that do not exceed 250 volts,400 amperes where the project's distribution system
<br /> I-1 does not include:
<br /> (A) Emergency systems other than listed unit equipment per NEC 700.12(F);
<br /> (B)An essential electrical system defined in NEC 517.2;or
<br /> (C)A required fire pump system.
<br /> 111 (v)Modifications to existing electrical installations where all of the following conditions are met:
<br /> (A)Service or distribution equipment involved is rated not more than 400 amperes and does not exceed
<br /> 250 volts or for lighting circuits not exceeding 277 volts to ground:
<br /> t'• (B) Does not involve emergency systems other than listed unit equipment per NEC 700.12(F);
<br /> (C)Does not involve branch circuits or feeders of an essential electrical system as defined in NEC 517.2;
<br /> {
<br /> and
<br /> (D)Service or feeder load calculations are increased by 5%or less.
<br /> (vi)Electric power production source(s)such as solar photovoltaic,fuel cell,or wind electric system(s)with a total
<br /> U rating of 9600 watts or less.
<br /> (vii)For installations in(a)(ii),(iii),and(v)of this subsection to be considered,the following must be available
<br /> CI to the electrical inspector before the work is initiated:
<br /> (A)A clear and adequate description of the project's scope;
<br /> (B)A load calculation(s);
<br /> (C)What the load changes are,providing both before and after panel schedules as needed;and
<br /> (D)Provide information showing that the service and feeder(s)supplying the panel(s)where the work is
<br /> taking place has adequate capacity for any increased load and has code compliant overcurrent protection
<br /> for that supply.
<br /> NOTE: Electrical plan review is not required for"Medical, dental, and chiropractic clinic"of which is a clinic or
<br /> physicians'office where patients are not regularly kept as bed patients for twenty-four hours or more, per section
<br /> •
<br /> (1)(c)(xii).
<br /> 1 (b)Electrical plan review is required for all other new or altered electrical projects in educational, institutional,or health care
<br /> z occupancies defined in this chapter.
<br /> E (c)If a review is required,the electrical plan must be submitted for review and approval before the electrical work is begun.
<br /> Table 900.1 Table 900.2
<br /> Health or Personal Care Facilities Educational and Institutional facilities,Places of Assembly.or Other Facilities
<br /> Health or Personal Care Facility Plan Review _ .,"" -
<br /> Type Required Educational,Institutional,or Plan Review
<br /> o_ tca Other Facility Types' Required
<br /> i' :\u--,:ng.'IC'74.ent..r It-mg.P,Pi7'
<br /> Cars _is: n fil'tit':?1;z§ 4 e.
<br /> ,•:. .p J? t,i s .,i;a- Notes to Tables 9001 and 900.2,
<br /> ",,,,a;';^IT ..:M rac .,;:,1,iI `.'gc. ,cry..?. .,t?.<... ed rc.,Io?.cc,rt:c"i:i'S=Ge'_t s
<br /> 4.*,,Y .tat,',o1.- .. .",,._, nay aecit.reOsnre:Ie' Orf ci.'.,1. o ;not
<br /> E,. A.9 h ,ter .>L 4.
<br /> ..._ C R.: �7,i'P depa'"Re7t.
<br /> is 7 a,t'Ni,1,',I f
<br /> 1 ;:.Ci C ,..--,E.t 7:1i:;'(.0C." •fel
<br /> 1 PERMIT J} Page 2-Plan Review
<br /> I
<br />
|