Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 9/24/2019 13:47 <br /> Issued By BRP BIGLEY,RYAN P. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 8/14/2019 <br /> Fund 401 Account 5 Program Function Activity <br /> Program UT3473 18 3 <br /> Title CONVERT.75 INCH 8113 XAVIER WAY UT3473-18-3 <br /> Work Order No 20192125 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 8/14/2019 Time 08:56 Original WO Billing <br /> Completed By Time Follow Up? <br /> Problem Details <br /> CONVERT.75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND <br /> BOX. FLAT TO METER PROJECT. <br /> Structure ID StrTyp Activity Compl Date Comments <br /> WS0785T015 WASRVC YES 8/21/2019 <br /> Address 8113 XAVIER WAY <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 8113 XAVIER WAY <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M ADAP34000647 ADAPTER 3/4 FIP X 3/4 IPS INSTA-TITE 1 16.452 08/22/2019 PAP <br /> M ADAP34000547 ADAPTER 3/4 MIP X 3/4 IPS INSTA-TITE 1 16.169 08/22/2019 PAP <br /> M ADAP34000147 ADAPTER 3/4 MIP X 3/4 RIBBED INSERT FOR IPS PE PIPE 1 7.729 08/22/2019 PAP <br /> M CAPO34110247 CAP PIPE 3/4 NPT BRASS 1 2.382 08/22/2019 PAP <br /> M ELLO34104247 ELBOW 3/4 NPT 90 DEG STREET BRASS(1/4 BEND) 1 3.835 08/22/2019 PAP <br /> M METE34141847 METER 5/8 X 3/4 NEPTUNE W/E-CODER R9001 CU FT STUB ANTENNA 1 208.128 08/22/2019 PAP <br /> Total Material Cost 54.70 <br />