|
�� �
<br /> W� O
<br /> W� �o
<br /> �� m
<br /> Roof tru�s�s to be designed �� �� d\-
<br /> � : - and drawin� prepared by W Q a 3
<br /> a State licens�d structuret � ��
<br /> CRAD(NG AND DRAINAG�E engineer. �
<br /> ��
<br /> � N
<br /> I. Provisions shalt be made for th� control and drainage af surface �'
<br /> � water around buildi�:gs by: g�;tter�, drain li;�es, ir�l�ts and catch
<br /> basins or oth�r necessary d;ai��ag� structures and shail b= instafl�d
<br /> - where storm water disposal cannot b� obtained �;viti�o�;t their use or Permit#: C1803-D03
<br /> �� wh�re er�si�n cannct b� prever,t:d by fi��i�h %�:�d;;-;g a;;d planting. SiteAddress= 38155HOREAVE
<br /> D�ry weli� shaU rlot v:� in�t���ll�d in areas where the soil is nat we�l a+�ner. KENNEDY1oHN&DANYEL
<br /> ��'ai����u :a7dj�r porous. Tenant_ [TenNamej
<br /> App.Date: 3/6/2Q18
<br /> Prapased Use: NEW SFR
<br /> .�• Gr��d:�,g shal! be provided ii.� insure:
<br /> Descriptian: REPLACE SFR
<br /> (a1 Diversion of water away frcm buildings.
<br /> {b) Prevention of standing water and soil saturation detrimanta� Reviewed 8y: � Q�t�: � �� l�
<br /> IF BUILDING IS NOT PC��ITIONED AS to st uctur�s and lot use. '�OfFice Set 1ob Site Set Fire/Planning Set
<br /> INDICATED ON APPR"V�,�? S'"TL YLAN, (c) j�,;t naturG! drainage channels or basiris a1'e nat bbcked or
<br /> A NEW SITE PLAN �:<ALL CE �llr�Pv1IT-
<br /> TED. NO FU;:�'�;�:'_ ��'`:s=��:T.=:>i:15 �"diLL fifled.
<br /> BE MADE ON TH�;�. i':_'.�;��:CT UNTIL THE fd) �r�.'.�i�i��r,s for th� disr��sal of water from a lot,
<br /> REVISEU SITE PLA1V �iAS BEEIV APPROV- re) Prot��:ti.� _f �� ; i_ W= ��� w �
<br /> � : P�c,p;;�tyn ��--xv�i za�x� 21.
<br /> ED BY THE BUILDINGrPtIBi1C WORKS � Q o Q=�W Q o�o�o��
<br /> DEPT'S. dzw���>�n.�aa
<br /> �1�l�i�GY GOI�� : .. _.. ��:�j ayi..�{,� i���A cn �
<br /> 1��G��l�l I G�� I 1�1SU��T I 01�1 � 1�0 ( STU�� �''�'OT�GT I O1�1 G�1�l�fi�� At is owners rQspcnsib�iity ta estdb{ish and stakQ �►( 'F=Of TI1tS p�o e�t T� ,��,u�>>
<br /> � property lines. �
<br /> � O
<br /> GENERA►L x: P°lum�ing [] Sprink� �- C,/) � �
<br /> GENER,4L PL,4N5 GOMPLY Y�IITH TH� 2015 INTERK,4TION�L RE5ID�NTI�L GODE. , �--- Q �, z
<br /> 2015 1N�5HINGTON ST�TE ENERGY GODE/ (EGG �WSEG) 50LID FUEL BURNIN6 �PPLI�NGES INGLUDE I�IRTI6HT STOVES, FIREPL,4GE STOVES, ROOM �'��Chat�lC�tl �o �
<br /> UNLE55 NOTED OTHERWISE INSULATION SHALL GONFORM TO THE W+45HIN6TON ST,4TE ENER6Y U W 3 �, �-
<br /> TABLE R402.1.1 HEaTERS, F�GTORY BUILT FIREPLAGES �NT� FIREPLAGE INS�RTS. ALL SOLID FUEL BURNIN6 ' � - � .o v
<br /> INSULATION �4Nfl FENESTRATION REQUIREMENTS BY GOMPONENT APPLIANGES SH,4LL GOMPLY WITH THE PROVI510N5 OP I.R.G. RI0062. GODES. INSUL/�TION B,4FFLE5 TO M�4INTAIN I" GLE�4R SPp.GE �4BOVE INSULATION. B14FFLE5 TO GONTRAGTOR SHALL YERIFY aL1. NOTES, DINtEN510N5 AND GONDITIONS PRIOR TO v _ E�'��'�'?f w� �
<br /> EXT'END b" �BOVE Br�TT INSULATION � 12" ,480VE L005� FILL INSULATION. INSULP.TE BEHIND GONSTRUGTION. GONTR,4GTOR SHALL PROVID� TEMPORr4RY BRAGIN6 AS REQUIRED UNTIL W � H � _
<br /> H E�T I N G BATHTUBS, SHOI^�RS, PaRTITIONS ,4ND C�C�RNERS. PROYIDE F,4GE STAPLED BATTS OR FRIGTION �L.L PERMA�NENT GONNEGTIONS HAVE B�EN MADE. IT 15 THE GONTRAGTORS RESPONSIBILITY > ;�
<br /> GLIMATE ZONE 5 � MARINE 4 FIT FAGED BP�TTS. PROYIDE 4 MIL (0.004") POLYETHYLENE YA�POR B�RRIER r4T W►4LL5 OR USE TO IDENTIFI' �.I..L. DISGREP�.NGIES TO THE r�.RGHITEGT ,4T THE TIME TH�Y ,4RE NOTED. ,,� � -_ �. � H � ¢
<br /> E}�GH DWELLIN6 UNIT SH?�LL BE PR4YIDE� WITH HFr4TING FAGILITIES G,4PABLE OF M,41NT�ININ6 ' ,�tn. s:� ;.;,,;a�:�u ;,;Ct .���:.: � a �-�
<br /> P Y A� P R I M E R W I T H ,4 D R Y G U P P E R M R A�T I N 6 O F O N E (M A X a. f'R O V ID E R-10 I N S U L�T IO N U N D ER D I M E N S I O N S T,4 1 G E P R E G E I�N G E O V E R S G A L E D D R,4 W I N G 5. o ��
<br /> PENESTi�TION U-P,4GTOR B o.3 0 �` ��`� � 68 DE6REE5 F�HRENHEIT AT I� HE16HT OF 3'-O" /�BOVE THE FLOOR A.ND �GTRIG YVATER HEATERS. Appio��-�� Build�n� Hei;`.T � 3 � 3
<br /> T W O F E E T F R O M E X T E R I O R W P�L L S I N A L L H A B I T,4 B L.E R O O M S W H E N T H E O U T S I D E T E M P E f Z 4 T U R E G O D�S:
<br /> SKYLIGHT S U-PAGTOR p_�p 15 P�5 SET FORTH IN THE 2015 W.S.E.G. IN�ILTR�TION GONTROL �LL APPLIG�4BLE GODES AND AUTHORITIES H?.VIN6 JURISDIGTION SH�LL BE FOLLOWED � o 0 0
<br /> G L�4 Z E D P�T�l�S?R A T I O N S H G G B� H R I. E X T E R I O R J O I N T S A.R O U N D W I N D O Y V S a N D D O O R F R A M E S O P E N I N 6 5 B E T W E E N W P�1.L 5 A N D I. 2 0 1 5 I N T E R N�T I O N A L R E S I D E N T I I�L G O D E (I R G) W I T H W A 5 H I N 6 T O N S T�4 T E i 4 M E N fl M E N T S � �" o� �
<br /> DEF I NI TI ON OF THERMA�L SU I LD I N6 ENYELOPE FROM THE 2015 WPSH I N6TON ST�TE ENER6Y GODE: � U w v �o
<br /> G�ILING R-VALU� " �.a THE BELOW-6RP�DE WaLLS, aB01/E-GRI�DE WaL.LS, FLOOR, RDOF, P�ND aNY OTHER ����TIONS, BETWEEN WaL.LS aND ROOF A�ND BETWEEN WaI..L PANELS, oPENIN65 �T (W51� �XGEPT GH�PTERS II aND 25 THROU6H 42 ARE NOT �DOPTED. W�.G 51-51 H �, r�
<br /> PENETRATIONS OF UTILITY SERYIGES THR�OU6H WALLS FLOORS �N17 ROOF �4ND aL1. 2. 2015 INTERNATIONr4L. BUILDIN6 GODE (IBG) WITH W,45HIN6TON ST�4TE ?.NtENDi�ENTS (WSAJ =ilN�:t���i�-��1�:+'���i� �:�._, - � 00 °O
<br /> BUILDIN6 ELEMENTS TH�4T ENGLOSE GONDITIONED SPaGE OR PROVIDES a BOUNDaRY � � � " v� � �
<br /> WOOD �RAM� WALL 6��' R-vALu� 21 INT $�7'y�EN �,pNpITIONED SP�4GE aND EXEMPT OR UNGONDITIONED SPAGE. OTHERS SUGH OPENIN65 IN THE BUILDIN6 ENVELOPE, INGLUDIN6 �GGE55 Pp.NELS INTO WA.G51-50 �JFER GROI�ND) REQUIR� � w ►c n
<br /> i UNHEA�TED SPAGES, SH�hLL BE SEP�LED, G/�ULKED, 6�k5KETED OR YVEATHER-STRIPPED TO 3. 2015 INTERhlr4TIONaL MEGH�4NIG�41. GODE (IMG) WITH WASHIN6TON STaT'E ?.MENDMENTS ��R �dEC 2�0.�0 z ��
<br /> M�455 W,4LL R-vALUE 2I/2I LIMIT ,41R INFIL'TRaTION. Z w •• ••
<br /> �LOOR R-V�4LUE 3O I. FUEL BURNIN6 �PPLIANGES LOGr�TED WITHIN THE BUILDIN6 ENVELOPE SH�41.L OBT�IN �41R 2 �.L. FxTER�OR DOORS OTHER TH,4N FIRE-RaTED DOORS, �� �G 51-52 Q � w x
<br /> FROM OUTDOORS, MEETIN6 THE P1�Z�01/ISIONS OF GHaPTER 24 OF THE 2015 IRG. � 5H�4LL BE DE516NED TO LIMIT ?�IR 4. 2015 UNIFORM PLUMBIN6 GODE NPG) WITH Wr45HIN6TON STP�1'� �MENDMENTS, WAG 51-56. ,z �-�+ �
<br /> B�LOW 6tZR� °�' W,�LL R-VALU� l0/15/21 INT + -B 2. FUEL BURNIN6 �4PPLI�4NGE5 LOG�TED OUT5IDE THE BUILDIN6 ENVELOPE SHALL MEET THE INFILTRA�TION �ROUN17 THEIR PERIMETER WHEN IN A GLOSED P051TION. DOORS BETI^�EN 5. 2015 INTERNr4TIDNAL FIRE GODE WITH WASHIN6TON STRTE r4MENt�MENTS, W►4G 51-54A. � �
<br /> RE51 DENGE aND 6P�Rr46E �RE NOT GON51 DERED "F I RE-Rr4TED" ,4ND NNST NtEET THE r4B01/E 4 O
<br /> v PROYt510N5 OF GHAPTER 24 OP THE 2015 IRG. b. 2015 W145HIN6TON STATE ENER6Y GODE, RESIDENTIAL PROVISIONS (WSEG). YVaG 51-IIR. ;���a -v
<br /> SL� R-v�U� a �r�+ lo, 2 �r. 3. �� LOG�4TION SHaLI. MEET THE PROVI510N5 OF GH�4PTER 24 OF THE 2015 IRG. ��IREMENT. � _ � �
<br /> 3. ALL EXTERIOR WINDOWS SH,4L.L BE DE516NED TO �DMIT ,41R INFILTR,4TION INTO OR FR�OM ��R �`���r�`'" �r,"'
<br /> �UR;�;•�n�._. �
<br /> 4. GOMBUSTION �IR TO MEET THE REQUIREMENTS OF I.R.G. MI'101.1 BU I LD I NG �;' NOT BE LOCATED !N TNE FRONT �
<br /> THE BUILDIN6 ENYELOPE WHIGH 5H�4LL BE SUBSTaNTIf�TED BY TESTIN6 TO ST/�NDaRD ,45TM ����TION TYPE: 1/-B 7 SIDE SETSACKS. PROPANE TA�"`" �
<br /> TABLE R402.1.1 FOOTNOTES ALL W,4RM ,41R FIJ�"A�GES SH�4Li BE LISTED �ND L�4BELED BY AN f4Pt'1ZOYED �.6ENGY AND E 283.?3. SITE BUILT ,4Nfl MILLWORK SHOP M,4flE WOODEN 5�45H �RE EXEMPT FR4M OGGUPA�NGY 6R�OUP: R-3 ;aUIRE ADDil'fONAL PF����T� ►S� o
<br /> FOR 51: I FOOT = 304.8 MM, GI = GONTIN�r�US INSULaTION, INT. = INTERMEDIATE FRaMIN6. INST�4LLED PER GH�PTER MI302 OF THE 2015 IRG. TESTIN6 BUT SHaLL BE Y��4THER-5TRIPPED, G,4ULKED �N17 MORE TI6H��Y FITTIN6. ~N� FvE��?T FlRE ' ~
<br /> 4. REGESSED L16HT FIXTURES TO LIMIT �41R LE,4KA6E PER W.S.E.G.
<br /> ~ R-Yp.LUES �RE MININNMS. U-FAGTORS ?�N17 SHcSG f4RE M�XIMUMS. WHEN INSULATION IS Np yyP�RM ,41R R1RNA.GE SH�LL BE INSTALLED IN A ROOM USED OR DE516NED TO BE USED AS ,4
<br /> INSTALLED IN A GAVITY WHIGH IS LE55 TH?.N THE LABEL OR DE516N THIGKNE55 OF THE gEDRppM, BATHRDOM, GLOSET OR IN ANY ENGL05ED SP�4GE WITH AGGE55 ONLY THROU6H 5UGH PIPIN6 FOR HOT INA�TER / STEpM SYSTEMS OF PIPIN6 FOR GONTINUOUSLY GIR�C.UL.f4TIN6 HOT LOGf4L JURISDIGTION R�QUIRES
<br /> INSULATION, THE GOMPRESSED R-Y�4LUE OF THE INSULATION FROM aPPENflIX T�BLE A101.4 RpOM OR SPaGE, EXGEPT DIREGT VENT FURNA�GE, ENGL05ED FURN�GES, �4ND ELEGTRIG HEATIN6 �T� �RVIGE IS REQUIRED TO BE INSUL,4TED PER THE W.S.E.G. HOT YVATER PIPIN6 SHALL BE py�LING UNIT FIRE SPRINKLER ��
<br /> SH�LL NOT BE LE55 TH?.N THE R-Y,4LUE SPEGIFIED IN THE TABL.�. �G� INSULP�TED TO 14 MINIMUM OF R-3 PER W.S.E.G. R403.5.3. NtEGHr4NIGAL SYSTEM PIPIN6 SHr41.1.. BE SYSTEM PER IRG �4PPENDIX R ❑�
<br /> INSULP�TED TO A� MINIMUM R-b PER W.S.E.G. R403.4
<br /> ° " tE FENESTRA�TION U-F�GTOR GOLUMN EXGLUDES SKYLI6HT5. THE SH6G GOLUM�_ aPPLIES TO NO YVaRM aIR FURNA.GE SH,4LL BE INSTaLLED IN �4 GLOSE'I" -�R �LGOVE WITH � SP,4GE LE55
<br /> �4LL 6LAZED FENESTR�TION. THAN 12" WIDER TH�4N THE FURN/�GE OR �4 GLEaRt4NGE OF 3" �41.ON6 THE SIDES, BaGK aND TOP. 1�,4POR S�RRIERS / GROUND G01�R5
<br /> ° "10/15/21.+TB" ME�NS R-10 GONTINUOUS IN5UL,4TION ON THE EXTERIOR OF THE W,4LL, OR R-15 ON pN APPR01/ED YAPOR BARRIER SHi�LL BE PR,OPERLY INST�4LLED IN ROOF DEGKS, IN ENGL05ED
<br /> THE GONTINUOUS INSULATION ON THE INTERIOR OP THE WALL, OR R-21 GAYITY INSUI.�4TION PLUS r4 LIG2UEFIED PETRCLEUM 6�45 BURNIN6 aPt'LI,4NGE5 5H?�LL NOT BE INSTALLED IN �4 PIT, Br45EMENT RAFTER SPA�C.ES FORMED WHERE GEILIN65 ARE �PPLIED DIREGTLY TO THE UNNflER51DE OF
<br /> THERMaL BREAK BETYVEEN THE 51.A�B ,4ND THE BASEMENT W�4L.L �T THE INTERIOR OF THE � SIMI1.aR LOGATION WHERE HE?�VIER TH�4N A�IR 6ASE5 MI6HT GOLLEGT. APPLIANGES 50 ROOF R,4FTER5, �ND �T EXTERIOR W,4LL5. INSET ST�4PLED BATTS WITH A PERM R,4TIN6 LE55
<br /> FUELED SHALL NOT BE INST,4LLED IN AN aBOVE 6Rr4DE UNDER FLOOR SPAGE OR BP�SEMENT TH�4N ONE MaY BE INST?�LLED IF THE Y14POR B�RRIER IS TO THE W,4RM SIDE, ST�PLES SHA�LL 5 I T� �0��
<br /> BASEMENT W,4LL. "10/15/�I.+TB" SHALL. BE PERMITTED TO BE MET WITH R-13 GAVITY INSUL�4TION �5 SUGH LOGATION IS PR�OYIDED WITH ,4N ,4PPROVED ME�4N5 FOR REMOV�41. OF UNBURNED BE PL�GED NOT MORE TH�N 8N O.G. A.ND 6,4P5 BETYVEEN THE FAGIN6 �ND THE FRAMIN6 SH�LL
<br /> ON THE INTERIOR OF THE B,45EMENT W�LL PLUS R-5 GONTINUOUS INSUL.P�TION ON THE INTERIOR
<br /> OR EXTERIOR OF THE WALL. "TB" MEANS THERM?�L. BRE�K BETWEEN PLOOR 5L,4B �+,ND 6�5. . NOT EXGEED I/I6"
<br /> B�s�r w��. G�NER,�L
<br /> HEATIN6 �N1� GOOLI N6 aPPL1,4NGE5 LOGATED IN � 6A�RP�6E AND WHIGH 6ENERATE �4 6LOW, YaPOR RETpRflERS AT lNALLS PER IRG R'702.'I ALL FOOTIN65 TO BE,4R ON FIRM, UNDISTURBED EARTH BELOW OR�G,4NIG SURF�GE SOILS. �LL.
<br /> ° R-10 GONTINUOUS INSULATION IS REQUIRED UNDER HE�4TED SLAB ON 6RADE FLOORS. SC--� SP�RK OR FLAME GAPftBL� OF 16NITINcS FL�MMaBLE Y�4PGR5 5H�4LL BE INSTA�L.LED WITH THE BAGK FILL M�.'fERIp.L. SHALL BE THOROU6HLY GOMPAGTED. FOUNDATION YENTS SH�4LL NOT
<br /> R<<,�2,2,q,�, ?ILOTS i4ND BURNERS OR F�E�TIN6 ELEMENTS AND SWITGHE� �4T LEAST 18" �4BG`/E THE FLOOR A 6R4UND GOVER OF 6 MIL (0.006"? BLr�GK POLYETHYl.,ENE OR FQUIYaL.ENT SH��LL BE L.�41D INTERFER� WIT�f THE DIREGT LO?�C� PA�TH OF GOLUMNS.
<br /> SURF�4GE. OVER THE 6R�OUND IN �4LL GRAWL SI�P�GES. THE 6ROUNfl GOVER 5H,4L.L BE OVERL,4PPED ON�
<br /> � THERE ARE NO 5F�6G REQUIREMENTS IN THE M�.RINE ZONE. F�OT AT EaGH JOINT AND SHr4LL. EXTEND TO THE FOUNDaTION WALL.
<br /> F I RE D�MPERS NEED NOT BE I NST�4L.LED I N A�I R DUGTS P�4551 N6 THR�OU6H THE YV I�L.L, FLOOR OR
<br /> * ��R�p GE I L I N6 SEP,4Rr4Tl N6 P� RE51 DENGE (R-3 OGGUP�NGY) FRON{' ,4 6r4Ra6E, PR�OV I DED SUGH DUGTS
<br /> WITHIN THE 6?�RA�6E �4RE GONSTRUGTED OF STEEL H�4YIN6 � THIGKN�55 NOT LE55 THaN O.OIa"
<br /> e ��yEp (NO. 26 6�4LV�4NIZED SHEET 6aU6Fa 14ND HAVE NO OPENIN65 INTO THE 6�4Rr�6E
<br /> " RE-SERI/ED
<br /> EVERY �4PPLI,4NGE DE516NED TO BE VENTED SHf4LL BE GONNEGTED TO A YENTIN6 5YSTEM GL I M�T I G r4ND GEOGR,4PH I G DES I GN GR I TER1,4
<br /> GOMf'LYIN6 WITH GH�PTER 18 OF THE 2015 IRG. WIND DESIGN SUB.�GT TO DAM,4GE FROM
<br /> � THE SEGONfl R-VA�WE �PPLIES WHFN MORE TH�N H�41..F TF�kE INSULaTION IS ON THE INTERIOR OF sElsMlc iGE BARRIPft AIR MEAN
<br /> EVERY FA�GTORY BUiLT GHIMNEY, TYPE L VENT, TYPE B 6p5 VENT OR TYPE BW 6A5 VENT SHA�LL GROUND Sp� TOPO- Sf'EGIAL WIND W��-�� DE516N ��ST WINTER UNDER-
<br /> THE MA55 WALL. SNOW GRAPHIG LINE TERMITE DESIGN LAYMENT FLOOD FR�ZING ANNUAL
<br /> BE INSTaL..LED IN �tGGORD�4NGE WITH THE TERMS OF ITS LISTIAl6, M�4NUFl4GT1JRER5 INST�LL,4TION LOAD �PH) �EGTS RE610N DEBRIS ZONE GATEGORY WEATFfERING DEPTH TEMP REQUIRED HAZARDS INDEX TEMP
<br /> � INSTRUGTIONS aND THE REQUIREMENTS PER GH,4PTER 24 OF THE 2015 IRG. SLIGHT TO
<br /> RESER�/ED 25 psf gg D2 MODERATE IS" MODERATE �
<br /> K FOR SIN6LE R,4PTER- OR J015T V�4ULTED GEILIN65, THE INSUL,4TION M,4Y SE REDUGED TO '°` �E B OR BW 6�45 YENT 5HALL TERMIN,4TP PER GHAPTER 24 OF THE 2015 IRG. EQUIYALENT PLUID PRE55URE = 35 P.G.F. (UNRESTRAINED WP�LLS)
<br /> R-38. 50 P.G.F. (RESTR,4INED WALLS)
<br /> VENT GONNEGTORS SHALL BE INSTP�LLED WITHIN THE SP,4GE OR aREa IN WHIGH THE aPPLIr4NGE
<br /> � ��D IS LOGr4TED P�ND 5HALL BE GONNEGTED TO P� GHIMNEY OR VENT IN SUGH A M,4NNER a5 TO
<br /> M/�INTaIN THE GLEP�RANGE TO GOMBUSTIBLES PER SEGTION MI803 OF THE 2015 IRG.
<br /> M INT. (INTERMEDIATE FR►4MIN6) DENOTES STANDARD FRAMIN6 Ib INGHES ON GENTER WITH }{��TING �QUIPMENT j�, �I
<br /> HEADEI�S INSfJLr4TED WITH i4 MII�IIMUM OF R-10 INSULATION. p,�.l, }{EpTIN6 EQUIPMENT SH�4LL MEET THE REQUIREMENTS OF THE 2015 N�TIONf4L APPLIANGE �I ���T I I `���X
<br /> " L06 �4ND SOLID TIMBER WALLS WITH A MINIMUM pVER�6E THIGKNE55 OF 3.5 INGHES ARE ENER6Y GONSERYATION �4GT (Nr4EG,� ,4ND BE 50 LABELED. EQUIPMENT SHP�LL ,4L..50 GOMPLY
<br /> EY.C�'MPT FROM THIS INSULA.TION REQUIREMENT. WITH SEGTION MI411 OF THE 2015 IRG
<br /> DUGTWORK SH�ET # D�SGi�I�'TION
<br /> I. A GERTIFIGr4TE GOMPLYIN6 WITH 2O15 WSEG R401.3 IS REQUIRED TO BE GOMPLETED BY �, �T SYSTEMS OR FA�GTORY BUILT l�►IR DUGTS SH,4LL BE OF MET.4L. l45 SET FORTH BY
<br /> THE DE516N PROFE551 ONA�L OR BU I LDER AND PERMA.NENTLY POSTED. T�4BLE I60I.I.I OF THE 2015 I RG. �i�G �--E I T� G T U fi��1_
<br /> �. THE BUILDIN6 SHaLL BE T'E55TED aND VERIFIED �45 Hr4VIN6 �N �41R LEp.KA6E Rr4TE NOT 2. REGT�N6UL�4R, F1.P�T, OV�4L �4ND RDUND DUGT JOINTS ?�ND SEaMS SHr4LL BE AIRTI6HT PER �OO�� l � I I `l�Ol 1S �I `lJ� ��YJ� ( �I ITS
<br /> EXGEEDING 5 aIR GH�4NGE5 PER HOUR. TESTIN6 SH�4l..L BE GONDUGTED WITH �4 BLOWER �GTION MI601.4.1 OF THE 2015 IRG. / fi"^ ;'�-� , �
<br /> DOOR AT �4 PRE55URE OF 0.2 INGHES W.6. �) G O Y E R S H�E T � �o�++n r c i�� j��a,y.
<br /> 3. EAGH DY�L.LIN6 UNIT IS REQUIRED TO BE P1Z01/IDED WITH �T LEaST ONE PRU6R�MM,4BLE 3. I N S T a L L 4 T I O N O F D U G T S S H�L L G O M P L Y W I T H S E G T I O H M I 6 0 1.4 O F T H E 2 0 1 5 I R G. �
<br /> 4 � •t g� `
<br /> THERMOSTr�.T FOR THE RE6ULATivi� OF TEMPERaTURE. 4. DUGT INSULATION SH�LL. BE INSTaLLED IN /4GGORDr�NGE WITH SEGTION MI601.3 OF THE 2015 ..�°�;' ` T�'"?� �. •,, ��
<br /> r, iRc. G�NER,4L �2 SGHEI7UL� SH��T � ,;
<br /> 4. DUGTS SH�LL BE L�4K TESTED IN ��GGORDANGE WITH WSU RS-33 USIN6 THE MAX. DUGT �'°� r' `
<br /> LEAKaGE R�4TE5 SPEGIFIED. 5. FINP�L DUGT LEAKp.6E AFFID�1/IT IS TO BE PR�OVIDED TO THE BUILDIN6 INSPEGTOR PRIOR T� �QUIR�D E6RE55 DOOR MI4Y H�1/E � MAXIMUM 7 g/4' STEP FROM TOP OP THE THRESHOLD � n�'r �' '" '' " ;`°-�
<br /> � :
<br /> T O � M I N I M U M 3 6° � ��r�i r li s o H r+� e x r�i o R s i� o F � n o o�z. o� e x r�i o R �3 DET�IL Sf��ET � r = � Mm % ,�
<br /> 5. A MINIMUM OF 755K OF PERMA�NENTLY INST�4LLED L/�MP� IN L16HTIN6 FIXTURES SHALL BE TO FINA�L INSPEGTION. DUGT LEAK�6E AND SFALIN6 REQUIREMENTS IN 2015 W.S.E.G. <: a a Gt �: j � �
<br /> DOORS MAY H�4VE A M,�CIMUM (2) ? g/4" STEPS TO I� MIN. 36" DEEP L.�4NDIN6. r�LL 6LAZIN6 '
<br /> HIcSH-EFFIG,4GY Lr4MP5. SEGTION R403.3.2 TO BF ME7. �{p�,� �T THE REQUIREMENTS OF THE 2015 W.S.E.G. TABLE R402.1.1 UNLE55 NOTED OTHERWISE. ; { � ���r� � ' ��
<br /> b. DUGTS INSUL/�T�4E1� TO A MINIMUM R-8 INSUL.aTION IN UNGONDITIONED SPr�GES PER W.S.E.G. � �YL16HT5 aND SKYW,4L.L5 5H�4LL H,4VE L14MIN�TED 6La55 UNLE55 NOTED OTHERWISE. �4 �OUND�TION P1..�N °� '�� �� � �� � 1j
<br /> a; � � ' a` .=.�` � V
<br /> SEGTION R403.3.1 ,4� gEpRppM EMER6ENGY E6RE55 WINDOWS SHALL Hr41/E A MINIMUM NET GL.E,4R OPENIN6 OF ';� '•� � ^ : ° �: $� �� �
<br /> 5.'1 5QU,4RE FEET. MINIMUM NET GLE�R OP�BLE WIDTH OF 20" r4ND P. MININAJM NET GLEAR �Ay � y� �. o . �� a� �,
<br /> 11 II ! \� LOY�R �LOO� PL,4N � ,F, . -e�.,� �aq�i' s �+.`' .. �
<br /> OPENIN6 HEI6HT OF 24 , MaXINpJM SILL HEI6HT OF 44 ME?SURED FR�OM THE FINISHFD FLOOR TO � � -. , ,-`-" o � �
<br /> G��'��1�1T�'Y THE BOTTOM OF THE GLEA.R OPENII�S. OPERr4BLE WINDOWS WITH p. SILL OF MORE TH�4N '72"
<br /> ABOVE FINISHED THE 6RpDE OR SURFaGE BELOW, TO BE �4 MINIMUM OF 24" aB01/E ,4DJ,4GENT �6 M�I N �LOOR �R�M I NC� �L�4N
<br /> Y�1�0�� �OUS� ��1�T I �.�T I 01� GENER�L FINISHED FLOOR. �
<br /> I�LL. FRAMIN6 SHaL.L GOMPLY WITH THE APPLIGI4BLE SEGTION(5) OF THE 2015 IBG/IRG. ��' M�I N �LOOR PL�4�l _
<br /> WHOLE HOUSE 1/ENTIL�TION SYSTEM TO BE INST?.LLED PER 2015 IRG SEGTIONS MI507.3.1 ��e,e,�m� �,�� y,,ppD REQUIRED IN LOG,4TION5 LI5TED IN IRG R31'IJ S��ETY GL�ZII�G LOG�TIONS P�R 2015 IRG SEGTION R308.4 t (1
<br /> THROU6H MI50'7.3.?. R308.4.1 6L,4ZIN6 IN ALl. FIXED �4ND OPER,4BLE PANELS OF SWIN61N6, SLIDIN6 aND BI-FOLD V � �
<br /> �48 UPP�R FLOOR �R�M I NG i�L,4N �
<br /> SEE "WHOLE HOUSE VENTIL,4TION" ON THE SGHEDULE SHEET FOR SELEGTED OPTION. �" MINIMUM VERTIGr4L GLE�4RANGE BETYVEEN YVOOD 8 GONGRETE STEPS, PORGH SL�B5, Rgp8.4.2 6LAZIN6 IN ,4N INDIVIDU,4L FIXED OR OPER�4BLE PP�NEL P�D.IaGENT TO �4 DOOR �
<br /> P�4TI0 SLABS � OTHER SIMIL�R HORIZONTAL SURFAGES EXPOSED TO THE 1^�,4THER. n/ � -
<br /> b" MINIMUM GLE�4Rr4NGE BETWEEN WOOD ,4ND EARTH. 1NHERE THE BO'1'TOM ED6E IS LE55 THaN 60 INGHES �4BOVE THE FLOOR 3 THE �� UPPER �LOOR PL,4N ,
<br /> 6L�ZIN6 IS EITHER WITHIN 24 INGHES OF EITHER SIDE OF THE DOOR IN THE PLP�NE OF � LLJ �
<br /> IRG T,4�LE M150�.3.3�1� 2't" MI NIIMUM GLERR�GE BETW�N F OOR BERMS� ��.a,Rr�RTM� 'T'HE DOOR IN A GLOSED POSITION OR ON A WALL PERPENDIGULI�R TO THE PL,4NE OF ��� ROO� �R�MING PL�N j�
<br /> THE DOOR IN ,4 GLOSED POSITION � WITHIN 24 INGH�S OF THE HIN6E SIDE OF �4N
<br /> , i:ONTINU0U5 WHOLE-HOUSE MEGH,4NIGaL VENTIL,4TION 18" MINIMUM GLE,4RANGE BETWEEN FLOOR JOISTS �4ND EP�RTH. ` }
<br /> 5YSTEM AIRFLOW Rp.TE REQUIREMENTS IN-SWIN61N6 DOOR. �I I �XTERE�PK LL.���tTIONS �
<br /> �I R308.4.3 6LaZIN6 IN aN INDIYIDU?�L FIX�i c�R OP�t�ABLE P�4NEL THAT MEETS ALL OF THE �
<br /> (aIRFLOW IN GFM) LOr4DING FOLLOWIN6 GONDITIONS: ���
<br /> �LOOR AR�A NUMB�R O� BEDROOMS � ROOF 15 P5F D�AD LOAD + 25 P5F LI1/E LOAD = 40 PSF I. THE E�POSED P�REA� OF aN INDIVIDU�L. P�sNEL 15 L�4R6ER TH,4N q SQUr�R� FEET; �12 . EXTERIOR ELE��TIONS � �
<br /> (sr�. �rJ o - I 2 - 3 4 - � b - 7 >� FLOOR 10 PSF DF�4D LOAD + 40 P5F LIVE LOAD = 50 PSF 2. THE BOTTOM ED6E OF THE 61.�4ZIN6 15 LE55 TH�4N 18" AB01/E THE FLOOR; �
<br /> <i�o 30 �s bo 7s ao GEILIN6 5 P5F DEAD LOAD + 10 P5F LIVE IAAD = 15 PSF 3. THE TOP ED6E OF THE 6L�4ZIN6 15 MORE THpN 36" ABOVE THE FLOOR; �4ND ��3 $U I LD I NG S�GTI ONS � �
<br /> ISoI -�oo0 45 bo 75 ao l05 DEGK 5 P5F DEAD LOAD + 60 P5F LIVE LAAD = b5 P5� 4. ONE OR MORE WALKIN6 SURFAGES ARE WITHIN 36" ME,45UREfl HORIZONT�4LL.Y �
<br /> sooi - -+soo bo 75 ao ios i2o INTERIOR PaRTITION = '� P5F aNfl IN ,� STRa16HT LINE, OF THE 6L�ZIN6.
<br /> 4�01 - b000 75 qo l05 12o I35 EXTERIOR P,4RTITION = 10 PSF R308.4.4 6Lp.ZI N6 IN 6UP�RD�' RND RRILIN65, INGLUDIN6 5T'R�JGTUR,4L BALUSTER PaNELS aND �-T'fi�' U G T U i�r�J_._ � �
<br /> 600i - 750o Qo io� i2o i3� Iso NONSTRUGTUR�J.. IN-FILL PANELS, RE6aRDLE55 OF aRE�4 OR HEI6HT �4BOVE A � � � �
<br /> >7500 l05 12o I35 ��o I65 WOC's� BE�RIN6 ON OR INST�,LLED WITHINX�" OF M�450NRY OR GONGRETE TO BE TRF',4TED WITH WALKIN6 SURFaGE. �'j� L�TER�L - STiZUGT!)i�L NOTES � SGHEDULES N � / m �
<br /> AP! �4PPROVED PRESERVr4TIVE. SOLID BLOGKIN6 OF NOT LE55 TH/�N 2x THIGKNE�f� SH�4LL BE R308.4.5 6LAZIN6 IN WP�LLS, ENGLOSURES OR PENGES C�C�NTAININ6 OR F�GIN6 HOT TUBS, �
<br /> PROVIDED A�T ENDS �ND AT aLL. SUPPORT OF JOISTS aND RP�FTERS. �4NGH0�. 80LT5 TO BE SPAS, YVHIRPOOLS, SAUN�45, ST'E�M ROOMS, B�4TFP"'UBS, SHOWERS aND INDOOR OR -�
<br /> PER SHE�R 1NaLL SGHEDULE �4ND FOUND?.TION PL�4N. '1" MINIMUM EMBEDMENT. ,41.L MET�L OUTDOOR SWIMMIN6 POOLS YVHERE THE BOTTOM EXP05ED ED6E OF THE 6LAZIN6 IS S2 L,4T�R,4L - DE?'�I L5 �ROM ENG I NEER z DESIGNED BY: DATE:
<br /> IRG T�BLE M1507.3.��2) FRAMIN6 ANGHORS ,4ND H,4N6ER5 SHOWN ON DRaWIN65 SHALL BE STRON6 TIE GONNEGT �' r4� LE55 THaN 60 INGHES MEASURED VERTIG,4LLY �BOVE �4NY 5T�4NDIN6 OR J�
<br /> INTERMITTENT WHOLE-HOUSE MEGHANIG�41. VENTIL,4TION RATE F�4GTOR5 ''`� 1"�a1�lIJF�4GTUREI� BY SIMPSON GOMPANY. WALKIN6 SURF,4G�. S� L,4TEi�L - D�T,41L5 �ROM ENGINEER � oaANTI BY: DA'lE:
<br /> R308.4.6 6LaZIN6 WHERE THE 80TTOM EXPOSED ED6E OF THE 6L�.ZIN6 IS LE55 THA�N 36 � DH I I/2q/11
<br /> RUN TIME PERG�NTA6E IN EAGH PR,OVIDE FIREBLOGKIN6 IN GONGEALED SPAGES OF STUD WALLS � PARTITIONS, INGLUDIN6 INGHES (414 MM) �801/E THE PLaNE OF THE �DJaGENT YV�LKIN6 SURFAGE OF �
<br /> 4-HOUR SEGM�NT 2�� 33� s°� 66� -��� �oo� S.¢ L�T�R,4L - DET�I L5 �ROM �NG I NEER
<br /> PURRED SPAGES 8 PAR�4LLEL ROWS OP STUDS OR STA6GERED STUDS ?5 FOLLOWS: ST141RW,4Y5, LANDIN65 SE'TWE�N FL16HT5 OP ST�41R5 ?�ND RP�MP�. � PROJECT MANAGER:
<br /> �AGTOR 4 3 2 �.5 �.3 �.o R08.4.7 61.aZIN6 r�DJAGENT TO THE L�4NDIN6 �T THE BOTTOM OF A STAIRWAY WHERE THE O SA�R?�H WEIGHT
<br /> I. 1/�RTIG�,LLY �4T THE GElLIN6 # FLOOR LE1/F1.5. 6Lf4ZIN6 IS LE55 THA.N 36 INGHES ABOVE THE LANDIN6 A�ND WITHIN � 60" Srj L�T�R�L - SHE�R 1N�LL5, I-I�RDV�I�RE REVISED BY: DATE:
<br /> a. FOR VENTIL�4TION SYSTEM RUN TIME VALUES BETYVEEN THOSE 61YEN, THE FAGTORS aRE �. HORIZONTaLLY AT INTERY�4L5 NOT EXGEEDIN6 10 FEET. HORIZONT�4l. ,4RG LE55 THAN 180 DE6REE5 FROM THE BOTTOM TREaD NOSIN6. ~ DH 3/30/IS
<br /> PERMITTED TO BE DETERMINED BY INTERPOLATION. 56 L,4TER1hL - �R,4MING PL�NS v
<br /> B. EXTRAPOLI�TION BE`fOND THE T�4BLE IS PROHIBITED. PROYIDE FIREBLOGKIN6 �T OTHER LOGaTIONS PER 2015 IRG R302.11. FOR EXGEPTIONS 5� IRG SEGTION R308.4 �
<br /> �
<br /> N
<br /> J
<br /> � LATERAL BY: DATE:
<br /> � ZED X/X/18
<br /> � LATERAL JOB NUMBER:
<br /> 17-131
<br /> ll.l
<br /> l�
<br /> � � I
<br /> gs V
<br /> `�, .�-,a n/
<br /> y �� �_��itl� � � f �1(.�"-� , . l�
<br /> �E � 0°� �� p�-���,-�i� d � r'= Z � �
<br /> ���,ll��`�►E L� ��� ���'��� }..,.,� �� ;�t���s; �
<br /> O
<br /> ' ANW WOODINVILLE OFFICE
<br /> � JOB NUMBER:
<br /> 1�0160
<br />
|