Laserfiche WebLink
. i <br /> CAUT ON : I � TH S SHEET S �IOT 30�� x42�� IT S A REDUCED PR NT <br /> DESIGN BUILD NOTES FINISH NOTES CEILING NOTES PARTITION PLAN NOTES FIRE AUTHORITY NOTES � � � <br /> � � <br /> z � w <br /> Q <br /> 1. LIGHT SWITCHES SHALL BE INSTALLED AT +48" A.F.F. MULTIPLE SWITCHES 1. NO FINISH SUBSTITUTIONS MAY BE MADE UNLESS APPROVED BY ARCHITECT. 1. SEE ELECTRICAL ENGINEERING DRAWINGS FOR SPECIFICATIONS OF NEW BUILDING 1. CONTRACTOR AND ARCHITECT TO REVIEW & APPROVE CHALK LINES OF PARTITION 1. FINAL INSPECTION BY FIRE DEPARTMENT IS REQUIRED - SCHEDULE 72 HOURS IN � � <br /> SHOULD BE GANGED TOGETHER UNLESS OTHERWISE SPECIFIED. STANDARD LIGHT FIXTURES, SWITCHES, EXIT SIGNS, ETC. LAYOUT PRIOR TO COMMENCEMENT OF PARTITION CONSTRUCTION. ADVANCE. ~ O � <br /> 2. CONTRACTOR MUST NOTIFY THE ARCHITECT OF ANY DISCREPANCY IN PLANS. � � <br /> - - � � � 2. CONTRACTOR TO VERIFY ALL SWITCH LOCATIONS WITH THE ARCHITECT PRIOR TO FINISH ITEMS CLEARLY SHOWN IN PLANS, BUT OMITTED FROM SCHEDULES OR 2. ALL REPLACEMENT FLUORESCENT LAMPS TO MATCH BUILDING STANDARD - SAME 2. CONTRACTOR TO VERIFY DIMENSIONS FOR ALL PLUMBING PARTITION. 2. THE PROJECT ADDRESS SHALL BE PROVIDED FOR ALL NEW AND EXISTING � � �c� � <br /> INSTALLATION. NUMBER OF SWITCHES FOR OPEN AREA IS BIDDER DESIGN. LEGENDS MUST STILL BE PROVIDED AND INSTALLED BY CONTRACTOR. COLOR AND MANUFACTURER. BUILDINGS IN A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE w � � <br /> SWITCHES INDICATED ON THE DRAWINGS FOR OPEN AREA ARE FOR REFERENCE CONTRACTOR TO VERIFY OMITTED FINISHED WITH ARCHITECT PRIOR TO ORDERING 3. EXTEND ALL STUDS AND WALL MATERIALS TO CONSTRUCTION ABOVE, U.O.N. STREET OR ROAD FRONTING THE PROPERTY PER LOCAL FIRE DEPARTMENT <br /> ONLY. PRODUCTS. 3. FIELD VERIFY EXISTING CEILING GRID LOCATION AND NOTIFY ARCHITECT OF ANY STANDARDS. � � <br /> DISCREPANCIES ON PLANS. 4. ALL CONDUIT PIPING IN ELECTRICAL ROOM TO BE CONCEALED WITHIN THE WALL � o <br /> 3. CONTRACTOR SHALL PROVIDE SEISMIC BRACING AT ALL NEW AND RELOCATED 3. INSTALL MATERIALS ACCORDING TO MANUFACTURER�S SUGGESTED INSTALLATION CONSTRUCTION. 3. AN UNOBSTRUCTED ALL-WEATHER FIRE APPARATUS ACCESS ROAD SHALL BE IN = V <br /> LIGHT FIXTURES. AND PREPARATION/MAINTENANCE SPECIFICATIONS OR BETTER, UNLESS OTHERWISE 4. WHERE DISCREPANCIES IN LOCATION OF LIGHT FIXTURES, AIR DIFFUSERS, GRILLES, PLACE PRIOR TO DELIVERY OF COMBUSTIBLE BUILDING MATERIALS TO THE SITE. ~ � i' <br /> APPROVED OR NOTED. ETC. OCCUR ON THE ELECTRICAL ENGINEERING PLANS, THE ARCHITECTURAL 5. DOOR OPENINGS IN PARTITIONS NOT DIMENSIONED ARE TO BE LOCATED WITHIN � � <br /> 4. CONTRACTOR SHALL VERIFY AND PROVIDE A COMPLETE HVAC SYSTEM WHICH PLANS SHALL GOVERN. NOTIFY ARCHITECT OF ANY DISCREPANCIES FOR 0'-4" OF ADJACENT PERPENDICULAR PARTITION. 4. FIRE PREVENTION WATER SERVICE SHALL BE IN SERVICE PRIOR TO DELIVERY OF o � <br /> CONFORMS TO THE OWNER�S HVAC SPECIFICATIONS. CONTRACTOR SHALL BE 4. APPLICATION OF CONTROLLED INTERIOR FINISHES SHALL BE IN CONFORMANCE CLARIFICATIONS. COMBUSTIBLE BUILDING MATERIALS TO THE SITE. � <br /> RESPONSIBLE FOR ALL ROOF PENETRATIONS AND PATCHING, ANY SCREENING OF WITH STATE & LOCAL CODES. 6. CONTRACTOR SHALL USE 3-5/8" METAL STUDS MINIMUM AT ALL PLUMBING °- e� <br /> ROOF-MOUNTED MECHANICAL UNIT REQUIRED BY GOVERNING JURISDICTION. 5. FIELD VERIFY ALL CLEARANCES OF DUCTS, PIPES, SPRINKLERS, ETC., AND NOTIFY WALLS. CONTRACTOR TO VERIFY ACTUAL DEPTH REQUIRED, ANY DISCREPANCIES 5. ACCESS GATES SHALL BE APPROVED PRIOR TO INSTALLATION AND SHALL BE IN 0° � � <br /> 5. DECORATIVE MATERIALS SHALL BE MAINTAINED IN A FLAME-RETARDANT ARCHITECT OF ANY CONFLICTS PRIOR TO INSTALLATION OF LIGHTS, ETC. SHALL BE REPORTED TO THE ARCHITECT. COMPLIANCE WITH LOCAL FIRE AUTHORITY. o � .� <br /> CONDITION. � � <br /> 6. PLACEMENT OF LIGHT FIXTURES IN AREAS WHERE MAIN DUCTS MAY CAUSE 7. USE WATER RESISTANT GYPSUM BOARD/FIBER BOARD AT ALL AREAS SUBJECT TO 6. FIRE SPRINKLER SYSTEM(S) SHALL MEET STATE & LOCAL FIRE CODES AND BE � � ' <br /> 6. SUBMIT THE FOLLOWING SAMPLES FOR ARCHITECT'S APPROVAL: INTERFERENCE MUST BE APPROVED BY ARCHITECT PRIOR TO INSTALLATION. MOISTURE OR WHERE TILE IS USED. PROVIDED TO PROTECT ENTIRE BUILDING INCLUDING PROJECTIONS OVER 4'-0" � J <br /> A. THREE (3) 12 X 12 SAMPLES FOR ALL PAINT AND STAIN BRUSHOUTS, „ AND SPRAY BOOTH. � <br /> VINYL AND FABRIC FINISHES AND COLORS APPLIED TO A SUBSTRATE WHICH 7• CONDUITS ABOVE CEILING MUST BE A MINIMUM OF 12 ABOVE THE CEILING GRID. 8. ALL PLUMBING WORK SHALL BE IN ACCORDANCE WITH LOCAL AND NATIONAL <br /> IS REPRESENTATIVE OF THE SURFACE TO BE FINISHED. SUBMIT PAINT CODES. 7. FIRE SPRINKLER SYSTEM(S) AND ALL CONTROL VALVES, INCLUDING EXTERIOR o <br /> SAMPLES FROM THE PAINT LOT OR LOTS INTENDED FOR APPLICATION. 8. NO COMBUSTIBLE MATERIALS SHALL BE USED IN THE PLENUM SPACE, INCLUDING SHALL BE SUPERVISED BY A U.L. LISTED CENTRAL ALARM STATION OR PER w <br /> ALUMINUM FLEX, ALUMINUM CONDUIT, AND POT METAL CONNECTORS. 9. ALL HOT WATER LINES SHALL BE PROPERLY INSULATED. SEE PLUMBING STATE & LOCAL FIRE CODES. � <br /> B. ONE (1) 24" X 24" MOCK-UP WITH SAMPLE SEAM (CENTERED) OF ALL DRAWINGS. o �, <br /> 9. ALL JUNCTION BOXES AND MECHANICAL EQUIPMENT REQUIRING ACCESS FOR <br /> FABRIC AND VINYL FINISHES AND COLOR. 8. ALL VALVES CONTROLLING THE WATER SUPPLY FOR AUTOMATIC SPRINKLER � <br /> SERVICE SHALL BE LOCATED OVER ACOUSTICAL CEILINGS. NO ACCESS HATCHES 10. ALL PLUMBING CLEAN-OUTS SHALL BE INSTALLED WHERE READILY ACCESSIBLE. SYSTEMS AND WATER-FLOW SWITCHES ON ALL SPRINKLER SYSTEMS SHALL BE � .� o <br /> SHALL BE INSTALLED IN GYPSUM BOARD CEILINGS WITHOUT PRIOR APPROVAL BY � o <br /> C. THREE (3) 12" X 12" SAMPLES OF ALL FLOOR COVERING. CONTRACTOR SHALL COORDINATE ALL CLEAN-OUT LOCATIONS WITH EQUIPMENT, ELECTRICALLY MONITORED WHERE THE NUMBER OF SPRINKLERS IS (100) OR � <br /> o � <br /> ARCHITECT. (NO EXCEPTION) AND CABINETS. SUBMIT A PLAN OF ALL PROPOSED LOCATIONS TO ARCHITECT MORE. ~ �i � <br /> D. SUBMIT ACTUAL CUTTINGS OF EACH PRODUCT FOR COLOR/QUALITY CONTROL. FOR APPROVAL PRIOR TO INSTALLATION. = Z � <br /> 10. ALL SPRINKLER HEADS AT HARD-LID CEILINGS ARE TO BE FULLY RECESSED AND � v � <br /> 9. ELECTRICAL SUBCONTRACTORS TO INSTALL WIRING FOR FIRE SPRINKLER, ALARM � <br /> 6. WHERE MATERIALS ARE NOT RETURNABLE, SUBMIT SAMPLES TO ARCHITECT CONCEALED. HEADS ARE TO BE CENTERED BETWEEN LIGHTS IN A UNIFORM 11. ALL MILLWORK SHALL CONFORM TO STATE & LOCAL WOODWORKING STANDARDS. BELL AND TELEPHONE WARNING AS REQUIRED BY FIRE DEPARTMENT. o .� v ;� � ' <br /> BEFORE PLACING FULL ORDERS. ARCHITECTURAL PATTERN. G.C. TO PROVIDE A SUBMITTAL WITH SPRINKLER HEAD m � � � o � <br /> LOCATIONS FOR ARCHITECT'S APPROVAL PRIOR TO INSTALLATION. 12. FIELD MEASURE AS REQUIRED FOR ALL MILLWORK CONDITIONS PRIOR TO 10. INSTALLATION OF FIRE ALARM SYSTEMS SHALL BE IN ACCORDANCE WITH STATE & w " � � � `° � <br /> 7. SUBMIT SEAMING PLAN FOR ALL FLOOR FINISHES TO ARCHITECT FOR APPROVAL FABRICATION. LOCAL FIRE CODES. 00 � bA � v •� � °1 0 � <br /> PRIOR TO ORDER. 11. ALL GYPSUM BOARD CEILINGS ARE TO BE INSTALLED WITH LINEAR DIFFUSERS. � °�' '� .� ;� v r+ � � � <br /> G.C. TO PROVIDE A SUBMITTAL WITH ALL LINEAR DIFFUSER LOCATIONS PRIOR TO 13. CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR ARCHITECT AND TENANT 11. COMPLETE PLANS AND SPECIFICATIONS FOR ALL FIXED FIRE PROTECTION = � �s °' � 5 � � �+ N <br /> �. NOTIFY ARCHITECT IMMEDIATELY OF ITEMS WITH L.ONG LEAD TIMES. INSTALLATION. APPROVAL PRIOR TO MANUFACTURE OF ANY CABINET WORK, MILLWORK AND ANY EQUIPMENT INCLUDING AUTOMATIC SPRINKLERS AND OTHER FIRE-PROTECTION � � � .� � •� o '° � � <br /> OTHER SPECIAL ITEMS REQUIRING CUSTOM SHOP FABRICATED WORK. SYSTEMS SHALL BE SUBMITTED BY INSTALLING CONTRACTOR. SUCH PLANS � <br /> 9. ALL PAINT FINISH OF METAL PARTS OF DOORS HANDRAILS PERIMETER 12• LOCATE RECESSED DOWN LIGHTS, WALL WASHERS, SMOKE DETECTORS, EXIT SIGNS, SHALL BE APPROVED BY LOCAL FIRE AUTHORITY PRIOR TO INSTALLATION. Q <br /> ENCLOSURES, ETC., SHALL BE SEMI-GLOSS, U.O.N. SPEAKERS, FIRE SPRINKLERS, ETC. IN CENTER OF 24"x24" CEILING TILES OR IN 14. CONTRACTOR TO VERIFY FINAL LOCATION FOR CANTILEVERED COUNTERS AND � <br /> w <br /> CENTER OF 24"x24" PORTION OF 24"x48" CEILING TILES, UNLESS OTHERWISE IN-WALL SUPPORT BRACKETS PRIOR TO GYPSUM BOARD FINISHING OF WALLS. 12. LOCATIONS AND CLASSIFICATIONS OF FIRE EXTINGUISHERS SHALL BE IN � <br /> 10. WHERE PAINT COLORS CHANGE, CORNERS ARE TO BE CUT-IN FREE OF NOTED. ALL FINAL INSTALLATION HEIGHTS FOR IN-WALL SUPPORT BRACKETS MUST MEET ACCORDANCE WITH STATE & LOCAL FIRE CODES AND PLACEMENT IS SUBJECT TO � <br /> OVERLAPPING. ALL ACCESSIBILITY CODES REQUIREMENTS WITH COUNTERTOP MATERIAL THICKNESS THE APPROVAL OF THE FIRE INSPECTOR. VERIFY QUANTITY & EXACT LOCATION � <br /> 13. PROVIDE SWITCHES AND LIGHT SENSORS FOR OPEN AREAS AND PRIVATE OFFICES. INCLUDED. FROM FIRE DEPARTMENT PRIOR TO ORDERING. z <br /> 11. PRIOR TO THE INSTALLATION OF WALL COVERINGS, SURFACES SHALL BE ACTUAL LOCATION OF ALL SWITCHES TO BE DETERMINED BY ELECTRICAL Q � <br /> PROPERLY PREPARED WITH SEALER PER MANUFACTURER'S RECOMMENDATIONS. ENGINEER. 15. PROVIDE AND INSTALL ALL NECESSARY WALL BACKING, STIFFENERS, BRACING, 13. AT LEAST ONE (1) FIRE EXTINGUISHER WITH A MINIMUM RATING OF: � REGISTRATION <br /> BACK-UP PLATES AND/ OR SUPPORTING BRACKETS AS REQUIRED FOR THE 2-A-10B:C (FOR OFFICE) OR 10-A-80B:C (FOR WAREHOUSE) SHALL BE N <br /> 12. CONTF�ACTOR TO VERIFY CONDITION AND LEVEL OF FLOOR SO AS TO RECEIVE 14. WHERE EXIT SIGNS ARE REQUIRED PER STATE & LOCAL CODES, THEY SHALL BE INSTALLATION OF WALL-MOUNTED OR SUSPENDED EQUIPMENT OR BUILT-IN ITEMS. PROVIDED WITHIN 75'-0" MAXIMUM TRAVEL DISTANCE FOR EACH 3,000 SQUARE °' � <br /> NEW FINISHES WITHOUT BOWING AT FLOOR OR WALL BASE. CONTRACTOR IS ILLUMINATED PER SAID CODES AND THE NEC. LOCATIONS SHALL BE VERIFY REQUIREMENTS WITH MANUFACTURERS PRIOR TO INSTALLATION. SUPPLY FEET OR PORTION THEREOF ON EACH FLOOR. � � �G��D <br /> RESPONSIBLE FOR ALL FLOOR PREPARATION. COORDINATED WITH THE ARCHITECT. CATALOG CUT SHEETS FOR ARCHITECT'S APPROVAL. w T <br /> 14. STORAGE, DISPENSING OR USE OF ANY FLAMMABLE AND COMBUSTIBLE LIQUIDS, � <br /> 13. ALL CARPETING SHALL BE INSTALLED WITH GLUE DOWN METHOD, U.O.N. 15. PROVIDE BACK-UP POWER �OR EXIT SIGNS PER STATE & LOCAL CODES. 16. PROVIDE AND INSTALL ALL NECESSARY ELECTRICAL CONNECTIONS AND PLUMBING FLAMMABLE AND COMPRESSED GASES, AND OTHER HAZARDOUS MATERIALS SHALL � DAV�IA <br /> SUPPLY, FITTINGS & CONNECTORS TO COMPLETE INSTALLATION OF APPLIANCES & COMPLY WITH STATE & LOCAL FIRE CODES. THE STORAGE AND USE OF BTATE OF WAS�oTON <br /> 14. WHERE FLOOR-MOUNTED OUTLETS ARE REQUIRED ON CARPETED AREA, CUT 16. THE MEANS OF EGRESS, INCLUDING THE EXIT DISCHARGE, SHALL BE ILLUMINATED EQUIPMENT INDICATED ON PLAN. VERIFY REQUIREMENTS WITH MANUFACTURERS HAZARDOUS MATERIALS SHALL BE APPROVED BY THE FIRE AUTHORITY PRIOR TO � <br /> CARPET 1N AN "X" OVER FLOOR HOLE AND INSTALL CARPET OVER TOP. DO NOT TO A LEVEL OF NOT LESS THAN ONE FOOT CANDLE AT THE WALKING SURFACE PRIOR TO INSTALLATION. SUPPLY CATALOG CUT SHEETS FOR ARCHITECT'S ANY MATERIALS BEING STORED OR USED ON SITE. A SEPARATE PLAN SUBMITTAL � <br /> TRIM CARPET. AT ALL TIMES THE BUILDING SPACE SERVED BY THE MEANS OF EGRESS IS APPROVAL. IS REQUIRED PRIOR TO THE STORAGE AND USE OF HAZARDOUS MATERIALS. w <br /> OCCUPIED. > �.03-o3-n <br /> 15. ALL V.C.T. TO BE INSTALLED WITH FULL TILE FROM VINYL THRESHOLD STRIP AND 17. EXACT LOCATION OF FIRE EXTINGUISHER CABINETS TO BE CONFIRMED WITH 15. BUILDING(S) NOT APPROVED FOR HIGH-PILED STOCK (MATERIALS IN CLOSELY 00 <br /> FULL TILE FROM WALL ADJACENT TO DOOR SWING, U.O.N. 17. EMERGENCY LIGHTING SHALL BE (2) SEPARATE SOURCES OF POWER AND SHALL ARCHITECT BEFORE INSTALLATION, PROVIDE ADDITIONAL FIRE EXTINGUISHERS & PACKED PILES OR ON PALLETS, OR IN RACKS WHERE THE TOP OF STORAGE � � <br /> COMPLY WITH THE NEC. CABINETS AS REQUIRED BY THE FIRE DEPARTMENT FIELD INSPECTORS. EXCEEDS 12'-0" IN HEIGHT, AND 6'-0" FOR GROUP "A" PLASTICS AND CERTAIN = <br /> 16. PROVIDE AND INSTALL SPECIFIED BASE FOR ALL AREAS TO RECEIVE FLOORING. OTHER HIGH-HAZARD COMMODITIES). HIGH-PILED STOCK SHALL BE APPROVED �' � <br /> 18. PROVIDE FIRE DAMPERS AT ALL SUPPLY AND RETURN AIR OUTLETS, INLETS OR 18. CONTRACTOR TO VERIFY LOCATION OF ALL THERMOSTATS WITH ARCHITECT PRIOR o <br /> DUCTS PENETRATING FIRE RATED ASSEMBLIES, ENCLOSURES, WALLS, FLOORS OR TO INSTALLATION. BY THE FIRE AUTHORITY PRIOR TO MATERIALS BEING STORED ON SITE. A z <br /> 17. CONTRACTOR SHALL PROVIDE PRE-FORMED RUBBER BASE CORNERS. DO NOT SEPARATE PLAN SUBMITTAL IS REQUIRED FOR HIGH-PILED STORAGE IN ¢ W <br /> CUT OR BEND STRAIGHT BASE TO MAKE CORNERS. SURFACES, AND AS REQUIRED BY THE FIRE DEPARTMENT. ACCORDANCE WITH STATE & LOCAL FIRE CODES. �' � Q <br /> 19. ALL EXITS SHALL HAVE EXIT SIGNS AND ALL BLIND CORRIDOR TURNS SHALL Z <br /> 18. MILLWORK LOWER CABINETS ARE NOT TO RECEIVE WALL BASE UNLESS INDICATED 19• CONTRACTOR SHALL PROVIDE EMERGENCY LIGHTING, STROBE LIGHTS, HAVE DIRECTIONAL EXIT SIGNS. � O <br /> ON FINISH PLANS. AUDIO-VISUAL ALARMS AND OCCUPANCY SENSORS TO MEET ALL APPLICABLE 16. A LETTER OF INTENDED USE MAY BE REQUIRED BY THE FIRE INSPECTOR. w <br /> CODES. 20. PREPARE ALL FLOOR SURFACES AS REQUIRED TO RECEIVE FINISHES AS NOTED 17. ALL REQUIRED FIRE DOORS SHALL BEAR A LABEL FROM A RECOGNIZED AGENCY o � <br /> 19. FLOOR FINISHES TO CONTINUE UNDERNEATH "OPEN FLOOR" AREAS OF MILLWORK, ON FINISH PLAN, ENLARGED FINISH PLANS & FINISH LEGEND. SHOWING THE SPECIFIC RATING. o <br /> INCLUDING SINK AREA AND AT ALL UNDER-COUNTER EQUIPMENT AREAS WHICH 20. CONTRACTOR SHALL PROVIDE LAMPS WITH TYPE IC RATED HOUSING WHERE w � 1 , I <br /> ARE OPEN TO THE FLOOR. FIXTURES �OME IN DIRECT CONTACT WITH INSULATION. 21. UNLESS OTHERWISE NOTED, ALL GYPSUM BOARD SURFACES, WALLS, AND CEILINGS a � LL! <br /> „ „ 18. EXIT SIGNS AND ILLUMINATION SHALL CONFORM TO ALL APPLICABLE BUILDING c� <br /> SHALL BE TAPED, SANDED SMOOTH TO A LEVEL 4 FINISH, SQ AS TO RECEIVE � <br /> �0, F L O dRS SHALL BE SLOPED TO FLOOR DRAINS. COORDINATE WITH PLUMBING AND �1. E X I 7 S I G N S S H A L L B E I N 7 E R N A L L Y O R E X T E R N A L L Y I L L U M I N A T E D A T A L L T I M E S AND FIRE CODES. � <br /> P A I N T O R W A L L C O V E R I N G M A T E R I A L. � o <br /> STRUCTURAL DRAWINGS. IN RATED FLOOR CONDITIONS, CONFIRM REMAINING FLOOR AND SHALL BE CONNECTED TO AN EMERGENCY POWER SYSTEM (BATTERIES, UNIT 19. EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY o � ('V <br /> THICKNESS STILL CONFORMS TO MINIMUM RATING REQUIREMENT, EQUIPMENT OR AN ON-SITE GENERATOR) THAT WILL AUTOMATICALLY ILLUMINATE 22, PROVIDE SOUND INSULATION AT PERIMETER WALLS OF RESTROOMS, LOBBY, OR ANY SPECIAL KNOWLEDGE OR EFFORT. w � Q� <br /> THE EXIT SIGNS FOR A DURATION OF NOT LESS THAN 90 MINUETS. STAIRS, AND ACROSS CEILING OF RESTROOMS TO CREATE AN ACOUSTIC c� � � � <br /> 21. CONTRACTOR TO RUN CALCIUM CHLORIDE TEST ON ALL EXISTING OR NEW ENVELOPE, U.O.N. w <br /> 20. PROVIDE OR MODIFY AS NEEDED SPRINKLER ALARM AND SMOKE DETECTION <br /> CONCRETE SLABS PRIOR TO INSTALLING ANY FLOORING AND COMPARE RESULTS SYSTEM PER APPLICABLE CODES INCLUDING IF NECESSARY FOR HORNS, STROBE � W o Z <br /> WITH FLOORING MANUFACTURE'S RECOMMENDED MAXIMUM CONTENT FOR 23. PATCH AND FILL VARIOUS OPENINGS AT EXISTING GYPSUM BOARD PARTITIONS ,,., O <br /> AND SOFFITS FOLLOWING REMOVAL OR INSTALLATION OF ANY SURFACE MOUNTED LIGHTS, CONTROL PANEL CONNECTIONS, SMOKE DETECTORS, AUDIO VISUAL � C � <br /> WARRANTIES AND ADHESIVE PRODUCTS. OR RECESSED FURNISHINGS, RECEPTACLES, UTILITY PIPING, SHELF STANDARDS & ALARMS. SUBMIT SHOP DRAWINGS TO THE FIRE MARSHAL FOR APPROVAL. W G Q � <br /> 22. PRIOR TO NEW FLOORING INSTALLATION REMOVE EXISTING FLOOR FINISHES. PATCH ALL OTHER SIMILAR ELEMENTS INDICATED TO BE REMOVED DURING THE Q � � � <br /> AND REPAIR SUB-FLOOR AS REQUIRED. PREPARE FLOORS AND TRANSITIONS AS DEMOLITION PHASE OR INSTALLED DURING THE CONSTRUCTION PHASE: TAPE AND � � � z <br /> REQUIRED FOR SMOOTH AND LEVEL FINISH PER APPLICABLE BUILDING CODES. SEAL ALL SEAMS WITH JOINT COMPOUND: APPLY NEW FINISH TO MATCH EXISTING J � � _ <br /> FINISH AT ADJACENT GYPSUM BOARD SURFACES AND FEATHER NEW FINISH WITH = � O <br /> E X I S T I N G F I N I S H T O P R O V I D E C O N S I S T E N T & C O N T I N U O U S F I N I S H. �' ^ <br /> 23. ALL FLOORING TRANSITIONS AMONG ALL THE DIFFERING FLOORING MATERIALM � <br /> S P E C I F I C A T I O N T Y P E S A R E T O B E A F L U S H T R A N S I T I O N. o W L L I � <br /> � � <br /> 24. FEATHER SUB-FLOOR UP FOR A) TILE FLOORING TO CARPET AND B) VINYL w Q • <br /> FLOORING TO CARPET, fOR FLUSH INSTALLATION. � O <br /> � � � <br /> U ^ i � <br /> 25. INSTALL METAL TRANSITION STRIPS WHERE TILE MEETS ALL OTHER FLOORING P O W E R & S I G N AL N OT E S D O O R N QT E S � LL W <br /> TYPES. PROVIDE LOW PROFILE TRANSITION STRIP WHERE ALL OTHER DIFFERENT � z <br /> F L O O R T Y P E S M E E T, V E R I F Y C O L O R. � � � <br /> � � W <br /> 26. CONTRACTOR TO HEAT/CHEMICAL SEAM VINYL FLOORING AS PER � � \ <br /> MANUFACTURER'S SPECIFICATIONS AND SEAL ALL VINYL FLOORS PER 1. COORDINATE TELEPHONE/DATA INSTALLATION WITH APPROPRIATE 1. VERIFY THAT ALL DOORS AND DOOR HARDWARE MEET THE REQUIREMENTS OF ALL � / <br /> MANUFACTURER'S MAINTENANCE SPECIFICATIONS. SUB-CONTRACTOR. GOVERNING CODES & STANDARDS. NOTIFY THE ARCHITECT IMMEDIATELY IN CASE J � W W <br /> OF DISCREPANCY. � � <br /> 27. FLOOR COVERING INSTALLER TO FOLLOW MANUFACTURER'S SPECIFIED CARPET 2. ALL EXISTING ELECTRICAL DEVICES ARE TO REMAIN, UNLESS NOTED OTHERWISE. W � <br /> INSTALLATION INSTRUCTIONS. USING ADHESIVES AND INSTALLATION METHODS 2. FIELD MEASURE, AS REQUIRED, ALL DOORS PRIOR TO FABRICATION. � � <br /> REQUIRED INSTRUCTIONS TO MAINTAIN PRODUCT'S WARRANTY. CONTACT CARPET 3. ALL OUTLETS TO BE INSTALLED AT LOCATIONS SHOWN BY DIMENSIONS ON THE <br /> SALES REPRESENTATIVE WITH QUESTIONS PRIOR TO PROCEEDING. POWER & SIGNAL PLAN. DIMENSION ALL OUTLETS FROM THE CENTERLINE OF THE 3. PROVIDE A SIGN ON OR NEAR THE MAIN EXIT DOOR READING: � � r 1 <br /> OUTLET BOX. NON-DIMENSIONED OUTLETS ARE TO LOCATED AT THE NEAREST "THIS DOOR TO REMAIN UNLOCKED WHEN BUIL.DING IS OCCUPIED". � �•� <br /> 28. FLOOR COVERING INSTALLER TO FOLLOW MANUFACTURER'S SPECIFIED CONTOURED WALL STUD. z � O <br /> 4. VERIFY THAT EXISTING DOORS COMPLY WITH ACCESSIBILITY REQUIREMENTS. w <br /> RUBBER BASE INSTALLATION INSTRUCTIONS USING ADHESIVES AND INSTALLATION � <br /> METHODS REQUIRED TO MAINTAIN PRODUCT'S WARRANTY. 4. WHEN OUTLETS ARE GROUPED TOGETHER (2 OR MORE), THEY ARE TO BE SPACED w � <br /> NO MORE THAN 2" APART. 5. RATED DOORS SHALL COMPLY WITH REQUIREMENTS OF ALL GOVERNING CODES & � ^ <br /> STANDARDS AND SHALL BEAR A LABEL FROM A RECOGNIZED AGENCY SHOWING a �•L <br /> 29. FLOOR COVERING INSTALLER REQUIRED TO PROVIDE MINIMA� SEAMS/JOINTS AT 5. ALL ELECTRICAL OUTLETS OF 30 AMPERES OR LESS SHALL BE MOUNTtD BETWEEN THE SPECIFIC RATINGS. � <br /> ALL LOCATIONS FOR FLOOR AND WALL BASE MATERIAL INSTALLATION. PROVIDE +15" TO BOTTOM RECEPTACLE AND +48" TO TOP OF RECEPTACLE FROM FINISH m <br /> LOW VOC, BUT HEAVY DUTY ADHESIVES TO ENDURE HEAVY FOOT TRAFFIC, CARTS � <br /> FLOOR. SEE NOTE 6, BELOW, FOR GENERAL MOUNTING HEIGHT 6. ALL HARDWARE TO BE LEVER-TYPE PER GOVERNING CODES & ACCESSIBILITY � <br /> AND TO MAINTAIN PRODUCT'S WARRANTY. STANDARDS. � <br /> 30. PRIOR TO PAINTING, WALLS MUST BE PATCHED AND REPAIRED, CLEAN AND DRY 6. ALL NEW WALL MOUNTED 15, 20, AND 30 AMP OUTLETS/RECEPTACLES TO BE w <br /> CENTERED AT +18" A.F.F., U.O.N. 7. DOOR HANDLES, PULLS OR KNOBS SHALL BE INSTALLED AT 40" ABOVE FINISIT Y <br /> AND PROPERLY MEMBERED AND ALIGNED S0, AS TO LEAVE NO EVIDENCE OF � � <br /> PATCHING OR REPAIRS. ALL SCREW AND NAIL HEADS MUST BE SET AND FLOOR. ALL OTHER OPERABLE PARTS OF DOOR HARDWARE (SUCH AS DEADBOLTS, � <br /> SPACKLED. ALL JOINTS MUST BE TAPED AND COVERED WITH JOINT COMPOUND. 7. ALL TELEPHONE AND DATA CABLE TO BE TEFLON COATED PLENUM RATED CABLE, KEYHOLES... ETC.) ARE TO BE CENTERED BETWEEN 34" AND 44" ABOVE FINISIT Y <br /> SUPPORTED INDEPENDENTLY FROM SUSPENDED CEILING SYSTEM. CABLING TO BE FLOOR. IF EXISTING BUILDING STANDARD EXISTS MATCH BUILDING STANDARD AND w <br /> JOINTS THAT ARE FILLED TO BE SANDED SMOOTH AND DUST REMOVED PRIOR TO � � <br /> RECEIVING NEW PAINT FINISN APPLICATION. SUPPLIED BY TENANT; ALL PULLS AND TERMINATIONS BY GENERAL CONTRACTOR. CONFIRM COMPLIANCE WITH ACCESSIBILITY REQUIREMENTS. o � <br /> w <br /> 31. PRIOR TO PAINTING OVER WALL COVERING, SECURELY GLUE DOWN ANY LIFTING OR 8. LOCATIONS OF FURNITURE POWER FEEDS SHALL ACCOMMODATE CIRCUITS AND 8. SPECIAL LOCKING DEVICES SHALL BE OF AN APPROVED TYPE. z � <br /> BUCKLING AND HIDE ALL SEAMING OR BUMPS. <br /> WIRE PER ELECTRICAL DRAWINGS. TENANT SHALL BE RESPONSIBLE FOR Q <br /> PROVIDING FURNITURE POWER FEED, GENERAL CONTRACTOR SHALL INSTALL THE 9• PROVIDE WEATHER SEALS ON ALL EXTERIOR DOORS PER ANSI STANDARDS. o <br /> 32. WALLS TO HAVE AT LEAST ONE COAT OF COLORED PRIMER AND TWO COATS OF POWER FEED. <br /> SPECIFIED PAINT FINISH TYPE. PAINT TO BE A LOW VOC UNLESS U.O.N. HIGH 10. CONTRACTOR IS RESPONSIBLE TO COORDINATE & VERIFY ALL DOOR FRAME � <br /> TRAFFIC/WEAR ABILITY WITH GOOD SCRUB AND CLEANING ABILITY. VERIFY ALL 9. WHERE DEDICATED ELECTRICAL OUTLETS ARE NOTED WITHIN THE FURNITURE THROAT THICKNESS' FOR EACH LOCATION. � <br /> WITH TENANT OR OWNER PRIOR TO PURCHASING PAINT. PANEL SYSTEM, THE PANEL SYSTEM SHALL ACCOMMODATE THIS REQUIREMENT. m <br /> 11. ALL DOOR FRAMES TO BE FACTORY FINISHED. <br /> 10. �LOOR OUTLETS ARE ACCEPTABLE NEXT TO SLIDING PANELS WALLS AND OTHER ~ � <br /> 33. PAINT ALL SPEAKER COVERS AND HVAC GRILLS IN GYPSUM BOARD WALLS AND / � <br /> CEILINGS TO MATCH ADJACENT PAINT COLOR AS SPECIFIED. SPECIAL CONVENIENT LOCATIONS. 12. ALL DOOR STOPS TO HAVE 2x6 BACKING IN THE WALL BEHIND. � � o <br /> � o <br /> 34. PRIOR TO INSTALLING WALL TILES AND WALL BASE TILE, WALLS MUST BE 11. WHERE ELECTRICAL WORK IS SPECIFIED IN CONJUNCTION WITH CABINET WORK, 13. MAXIMUM UNDERCUT OF ALL DOORS NOT IN A RATED CORRIDOR SHALL NOT = <br /> PATCHED AND REPAIRED, CLEAN AND DRY AND BE PROPERLY MEMBERED AND LAMPS AND FIXTURES ARE TO BE PROVIDED BY THE GENERAL CONTRACTOR. EXCEED 1/2" ABOVE FINISH FLOOR SURFACE. o Z <br /> ALIGNED, S0, AS TO LEAVE NO EVIDENCE OF PATCHING OR REPAIRS. ALL SCREW Q J <br /> AND NAIL HEADS MUST BE SET AND SPACKLED. ALL JOINTS MUST BE TAPED AND 12. CUT-OUTS FOR SWITCHES, OUTLETS, ETC. AS REQUIRED BY THE CABINET 14. CONTRACTOR SHALL REFINISH ANY BLEMISHED DOOR OR REPLACE SAID DOOR IF Q <br /> COVERED WITH JOINT COMPOUND. JOINTS THAT ARE FILLED ARE TO BE SANDED CONTRACTOR ARE TO BE COORDINATED WITH THE ELECTRICAL CONTRACTOR, NOT ABLE TO REFINISH TO "AS NEW" CONDITION. � � <br /> SMOOTH AND BUMP FREE WITH DUST REMOVED PRIOR TO RECEIVING MORTAR U.N.O. ALL RECEPTACLES WHERE MILLWORK OCCURS SHALL BE LOCATED PER � W � <br /> ELEVATIONS OF THE MILLWORK ITEM IN QUESTION. 15. ALL DOORS TO BE OPERABLE FROM THE INSIDE WITHOUT A KEY OR ANY SPECIAL <br /> BED/BOND COAT AND WALL TILES. Q �, <br /> KNOWLEDGE OR EFFORT. � z > <br /> 13. ALL WALL COVER PLATES SHALL BE WHITE, UNLESS BUILDING STANDARD IS w W ``' <br /> 35. ALL WALL TILES ARE TO HAVE A MORTAR BED/BOND COAT THICKNESS TO � � � <br /> DIFFERENT, MATCH BUILDING STANDARD. 16. ALL DOORS WITH ELECTRONIC SECURITY DOOR LOCKS MUST BE OPENABLE FOR Q Y � <br /> ACCOMMODATE THE VARYING THICKNESSES OF ALL MATERIAL TYPES OF TILE EXITING PURPOSES UNDER ALL CONDITIONS. INCLUDING A POWER OUTAGE. � � � � <br /> SPECIFIED FOR WALL INSTALLATION WITH A FLUSH FRONT FACE. ,L Q <br /> 14. ALL SEPARATE CIRCUIT RECEPTACLES TO BE ORANGE COLOR WITH BUILDING o � i- <br /> 36. ALL TRANSLUCENT GLASS TILE SPECIFIED ARE TO RECEIVE UNIFORM COVERAGE STANDARD COLOR COVER PLATE. 17. IF BUILDING STANDARDS ARE INCONSISTENT FOR DOORS, RELITES, HARDWARE, _ � w ' <br /> BY BACK BUTTERING TILES AND TROWEL RIDGES FLATTENED PRIOR TO SETTING DOOR AND RELITE FRAMES OR OTHER STANDARD DETAILS, THEN CONTRACTOR c� � <br /> TRANSLUCENT GLASS TILES. 15. POWER/SIGNAL AND REFLECTED CEILING PLANS ARE FOR THE GENERAL MUST VERIFY WITH DESIGNER AND OWNER PRIOR TO CONSTRUCTION. � o <br /> INFORMATION OF THE CONTRACTOR. EXACT LOCATIONS SHOULD BE VERIFIED. �- '- <br /> 0 <br /> 37. FLOORS OF TOILETS, BATHING AND SHOWER ROOMS SHALL HAVE A SMOOTH, � � <br /> 6' 16. TENANT TO PROVIDE AND INSTALL THE TELEPHONE AND DATA COMMUNICATION o U' <br /> 3 HARD, NONABSORBENT SURFACE. THE INTERSECTION OF SUCH FLOORS WITH cn <br /> � WALLS SHALL HAVE A SMOOTH, HARD, NONABSORBENT VERTICAL BASE AS CABLING. CONTRACTOR TO COORDINATE SCHEDULING AND OTHER REQUIREMENTS Q - <br /> o SPECIFIED IN FINISH PLANS OR RESTROOM ELEVATIONS. BASE SHALL EXTEND WITH TENANT. � � <br /> � UPWARD ONTO THE WALLS NOT LESS THAN 4 INCHES. � W o <br /> n� 17. ALL/ANY CORE DRILL LOCATIONS SHALL BE VERIFIED WITH DESIGNER PRIOR TO � � `V <br /> �`� 38. WALLS AND PARTITIONS WITHIN 2 FEET OF SERVICE SINKS, URINALS AND WATER REQUIRED TO MAINTAIDN F�OOR FIIRE RATING.BE PLUGGED AND CAPPED AS G LAZ I N G N O T E S °- � o <br /> % CLOSETS SHALL HAVE A SMOOTH, HARD, NONABSORBENT SURFACE TO A HEIGHT <br /> � OF NOT LESS THAN 4 FEET ABOVE THE FLOOR. _ <br /> / 18. ALL TELEPHONE AND COMPUTER WIRES SHALL BE PULLED BY TENANT '- <br /> � CONTRACTOR U.O.N. ELECTRICAL CONTRACTOR SHALL PROVIDE PULL WIRES AND ``' <br /> o � � <br /> � BOXES AT EACH LOCATION. 1. EACH LIGHT SHALL BEAR THE MANUFACTURER'S LABEL DESIGNATING THE TYPE � <br /> � 19. CONTRACTOR SHALL OBTAIN APPROVAL FROM ARCHITECT FOR ALL THERMOSTAT AND THICKNESS OF THE GLASS. zo PA/PM: V.SOMPPI <br /> � <br /> � LOCATIONS. 2. GLASS SHALL BE FIRMLY SUPPORTED ON ALL FOUR EDGES. � DRAWN BY: N.ROESER <br /> � <br /> � � <br /> �, <br /> � <br /> 3. FIELD MEASURE ALL OPENINGS PRIOR TO FABRICATION. W JOB NO.: SEA16-6215-00 <br /> / � <br /> o � <br /> � 4. ALL GLAZING WITHIN A 24" ARC OF EITHER EDGE OF A DOOR AND WITHIN 60" OF o <br /> '� . THE FLOOR SHALL BE TEMPERED. (SAFETY GLASS) Q SHEET <br /> � <br /> N � <br /> % 5. ALL GLASS SHALL COMPLY WITH THE REQUIREMENTS OF STATE AND LOCAL � <br /> `� CODES AND THE U.S. PRODUCT SAFETY COMMISSIONS: SAFETY STANDARDS FOR � o <br /> � ARCHITECTURAL GLAZING MATERIALS. Q N <br /> � <br /> cn � ■ Q <br /> / 6. WHERE JOINTS ARE REQUIRED IN MULTIPLE LITE SITUATIONS, SILICON IS TO BE � � <br /> � PROVIDED U.O.N. _ �; <br /> � � <br /> - . _r ..,:,.� , <br />