My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10200 19TH AVE SE COSTCO BAKERY 2019-11-15
>
Address Records
>
19TH AVE SE
>
10200
>
COSTCO BAKERY
>
10200 19TH AVE SE COSTCO BAKERY 2019-11-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2019 9:57:19 AM
Creation date
11/15/2019 9:56:45 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10200
Tenant Name
COSTCO BAKERY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/15/2019 City of Everett Page <br /> 9:14:29AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. X1810-004 Site Address 10200 19TH AVE SE <br /> Applied 10/31/2018 Applicant Lot <br /> Approved 12/26/2018 Owner COSTCO WHOLESALE CORP Block <br /> Issued 1/2/2019 Contractor INTERSTATE CONST GROUP INC Tract <br /> Parent Permit No. B1811-006 Description COMMERCIAL KITCHEN WITH BAKERY EQUIPMENT UPGR <br /> Notes ADDING(3)HOBART OVENS/(1)HOBART PROOF BOX(3)EXHAUST FANS(4)TRANSFER <br /> FANS(1)PIT WASHER-OTHER MECH=(3)GAS OVEN,(1)PROOFER <br /> PLUMBING SUBJECT TO FIELD INSPECTION <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 1/10/2019 1/10/2019 GAS 01-ROUGH IN DXW CORRECTION eTRAKiT Inspection 1/9/2019 10:39 AM Kevin Ezell <br /> Request <br /> Contact Name:Kevin Ezell <br /> Site Address: 10200 19TH AVE SE <br /> Phone:2064598615 <br /> e-Mail: <br /> kezell@interstateconstructiongroup.com <br /> (1/10/2019 12:00 PM DXW) <br /> Cap gas pipe ASAP <br /> left gas pipe affidavit for gas pipe test. <br /> 1/10/2019 - 1/10/2019 PLUMB DXW APPROVAL eTRAKiT Inspection 1/9/2019 10:37 AM Kevin Ezell <br /> 02-GROUND Request Can we please have a mid morning <br /> inspection for the U/G and gas rough? <br /> Thank you,Kevin <br /> Contact Name:Kevin Ezell <br /> Site Address: 10200 19TH AVE SE <br /> Phone:2064598615 <br /> e-Mail: <br /> kezell@interstateconstructiongroup.com <br /> 1/10/2019 1/10/2019 PLUMB DXW APPROVAL as noted 1/9/2019 11:14 AM <br /> 03-ROUGH IN Can we please have a mid morning <br /> inspection?Thanks,Kevin <br /> Contact Name:Kevin Ezell <br /> Site Address: 10200 19TH AVE SE <br /> Phone:2064598615 <br /> e-Mail: <br /> kezell@interstateconstructiongroup.com <br /> (1/10/2019 11:47 AM DXW) <br /> complete 2"vent in wall. <br /> picture of vent ok. <br /> RPBA req.for water line to each oven, <br /> proof oven,dishwasher. <br /> airgap req.for rack washer over concrete <br /> pit. <br /> 1/23/2019 1/23/2019 MECH 04-ROUGH DXW NOT READY complete ovens 1/22/2019 10:44 AM Kevin Ezell <br /> IN Can we please get a morning inspection? <br /> Thank you,Kevin 206-459-8615 <br /> Contact Name:Kevin Ezell <br /> Site Address:10200 19TH AVE SE <br /> Phone:2064598615 <br /> e-Mail: <br /> kezell@interstateconstructiongroup.com <br /> 1/24/2019 1/24/2019 GAS 03-FINAL SDP APPROVAL received affidavit for <br /> gas test <br /> INSP12 TEM S <br />
The URL can be used to link to this page
Your browser does not support the video tag.