My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3200 20TH ST SPRINT ANTENNA 2019-11-15
>
Address Records
>
20TH ST
>
3200
>
SPRINT ANTENNA
>
3200 20TH ST SPRINT ANTENNA 2019-11-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2019 10:51:01 AM
Creation date
11/15/2019 10:50:33 AM
Metadata
Fields
Template:
Address Document
Street Name
20TH ST
Street Number
3200
Tenant Name
SPRINT ANTENNA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC ORKS PERMIT =ate Applied: 1/3/2018 <br /> City of Everett Public Works Department Public Works Permit#: PW1801 003 <br /> 3200 Cedar Street Associated Building Permit#: B1712-008 <br /> Everett,WA 98201 Planning Reference#: <br /> (425) 257-8810 Public Works Fee: $110.00 <br /> 10 APR 2018 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> STATE OF WASHINGTON DEPT OF TRANS STATE OF WASHINGTON DEPT OF TRANS <br /> PO BOX 330310 PO BOX 330310 <br /> SEATTLE, WA, 98133 SEATTLE, WA, 98133 <br /> PHONE: PHONE: <br /> TAX PARCEL ID#: 00563241100100 SITE ADDRESS: 3200 20TH ST <br /> DESCRIPTION: TRENCHING AND CONCRETE PAD FOR SITE EQUIPMENT <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 1/3/2018. Approved <br /> plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction for a <br /> consultation, to evaluate Erosion/Sedimentation control set-up, and with all other inspection requests. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector. <br /> Remove upon completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. Concrete slab formwork must be inspected by the Public Works Inspector prior to pouring concrete. <br /> 10. Trench work must be inspected by the Public Works Inspector prior to backfill. <br /> 11. It is the owner/applicant/contractor's responsibility to schedule all required inspections. <br /> Public Works Permit Fee Breakdown: <br /> Paving (Concrete slab) $45.00 a OD <br /> Misc. Minor Permits (Utility Trench) $25.00 <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 MAR 01 2018 <br /> CITY OF EVEREST <br /> Permit Services <br /> City of Everett Oficial Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> )cutiatvu %...4.41t6110_ harmless the City of Everett from any and all claims for damages,costs, <br /> //3/201: expenses,or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) te for and further agrees to remove same upon notice from the City and to <br /> replace public property <br /> damaged thereby. )> <br /> FINAL INSPECTION Date /`�" t `7—1 1--1 g <br /> Approved as Constructed (PW Inspector) ignature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DAT PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.