Laserfiche WebLink
PUBLIC ORKS PERMIT =ate Applied: 1/3/2018 <br /> City of Everett Public Works Department Public Works Permit#: PW1801 003 <br /> 3200 Cedar Street Associated Building Permit#: B1712-008 <br /> Everett,WA 98201 Planning Reference#: <br /> (425) 257-8810 Public Works Fee: $110.00 <br /> 10 APR 2018 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> STATE OF WASHINGTON DEPT OF TRANS STATE OF WASHINGTON DEPT OF TRANS <br /> PO BOX 330310 PO BOX 330310 <br /> SEATTLE, WA, 98133 SEATTLE, WA, 98133 <br /> PHONE: PHONE: <br /> TAX PARCEL ID#: 00563241100100 SITE ADDRESS: 3200 20TH ST <br /> DESCRIPTION: TRENCHING AND CONCRETE PAD FOR SITE EQUIPMENT <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 1/3/2018. Approved <br /> plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction for a <br /> consultation, to evaluate Erosion/Sedimentation control set-up, and with all other inspection requests. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector. <br /> Remove upon completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. Concrete slab formwork must be inspected by the Public Works Inspector prior to pouring concrete. <br /> 10. Trench work must be inspected by the Public Works Inspector prior to backfill. <br /> 11. It is the owner/applicant/contractor's responsibility to schedule all required inspections. <br /> Public Works Permit Fee Breakdown: <br /> Paving (Concrete slab) $45.00 a OD <br /> Misc. Minor Permits (Utility Trench) $25.00 <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 MAR 01 2018 <br /> CITY OF EVEREST <br /> Permit Services <br /> City of Everett Oficial Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> )cutiatvu %...4.41t6110_ harmless the City of Everett from any and all claims for damages,costs, <br /> //3/201: expenses,or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) te for and further agrees to remove same upon notice from the City and to <br /> replace public property <br /> damaged thereby. )> <br /> FINAL INSPECTION Date /`�" t `7—1 1--1 g <br /> Approved as Constructed (PW Inspector) ignature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DAT PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />