My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
605 40TH PL 2019-11-15
>
Address Records
>
40TH PL
>
605
>
605 40TH PL 2019-11-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2019 1:14:00 PM
Creation date
11/15/2019 1:13:50 PM
Metadata
Fields
Template:
Address Document
Street Name
40TH PL
Street Number
605
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTION REPORT <br /> ,,,„„„1„:. - - Date Permit: /V1:7—Q fL <br /> Tv:-" Contractor: <br /> q (l ' <br /> .> Owner: <br /> Site Address: 605 -'1dam FL <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑SI duit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> Rough I ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> juice ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑ .. ding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ■�.' ❑Drywall Nailing ❑Plumbing Final <br /> `a -'—ctrical inal El Shear Nailing GAS PIPE <br /> IT A •' ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PE' o, <br /> 111 OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION–24 hour notice required <br /> Inspector: ZJDate: L <br /> EIR(10/06) _ DATABAR,INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.