My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
125 SW EVERETT MALL WAY GERBER COLLISION AND GLASS 2018-01-01 MF Import
>
Address Records
>
SW EVERETT MALL WAY
>
125
>
GERBER COLLISION AND GLASS
>
125 SW EVERETT MALL WAY GERBER COLLISION AND GLASS 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2019 1:18:22 PM
Creation date
11/18/2019 1:08:52 PM
Metadata
Fields
Template:
Address Document
Street Name
SW EVERETT MALL WAY
Street Number
125
Tenant Name
GERBER COLLISION AND GLASS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />If they develop the landscape plan now Tor re-submittal then 1 can waive <br />the performance bond and approve the permit with conditions. Keep in <br />mind, ifthe landscaping is not installed by Ihe time they are looking <br />for c.o., we can do a temporary c.o. but it will requirc the performance <br />bond a[ that time. <br />If they submit a landscape plan now and all looks good for permit <br />issuance, once Ihe TI work and landscaping is done then the City can <br />issue a c.o. upon submission of a maintenance assurance device. The <br />maintenance assurance device is 10%of the cost of landscaping materials <br />and is held by Ihe City Clcrk's for two years, a cos[ breakdown should <br />be submitted by the sub-contrac[or. The Legal Dept. has fortns for both <br />the perfortnance bond and maintenance assurance device 1 can have <br />fonvarded when needed. <br />Niels'I'ygesen <br />Assistant Planner <br />Ciry of Gverett <br />Department of Planning and Community Developmen[ <br />T.425.257.7275 <br />From: Theresa Greene fmailto:te.architect(n�comcast.net] <br />Sent: �riday, July 01, 2011 12.25 PM <br />To: Niels Tygesen <br />Subject: RE: Gerber Collision & Glass 125 SW Everett Mall Way <br />lii Nicls, <br />I've added Ihese Site Plan changes Gom you and Michael Brink, and I see <br />online that the permit h�s been approvcd by [3uilding mid Public Works. <br />Do 1 need to bring copies of the revised Site Plan in or wait for a <br />formal response Ictter from the City? <br />The tenant is working on the performance bond and is planning on <br />bringing that in when the pennit is ready to be picked up. They were <br />�vondering if they can avoid the perfomiance bond requirem�nt if diey <br />develop the Landscape Plan now - for this re-submittal. Can you clarify <br />th�s? Also, wha[ is the maintenance assunnce device requirement? <br />Th�nks, <br />Theresa Greene, Architect, PLLC <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.