My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2206 TOWER ST Geotech Report 2018-01-02 MF Import
>
Address Records
>
TOWER ST
>
2206
>
Geotech Report
>
2206 TOWER ST Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 11:58:57 AM
Creation date
11/19/2019 11:52:17 AM
Metadata
Fields
Template:
Address Document
Street Name
TOWER ST
Street Number
2206
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXISTING GROUND SURFACE <br /> INON-STRUCTURAL HARDSCAPE OR I <br /> �-^ AREAS �PAVEMENT---{ <br /> � AREAS I <br /> � <br /> ys VARIES <br /> 90 � <br /> O 95 2 FEET <br /> I <br /> 90 95 VARIES <br /> (SEE NOTE 1) <br /> i t�� <br /> I <br /> _ �. <br /> VARIES <br /> � <br /> --PIPE� <br /> NOT TO SCALE <br /> LEGEND: <br /> RECOMMENDED COMPACTION AS A PERCENTAGE OF <br /> 95 MAXIMUM DRY DENSITY,�Y TEST METHOD ASTM D1557 <br /> (MODIFIED PROCTOR) <br /> 0 CONCRETE OR ASPHALT PAVEMENT <br /> � BASE COURSE <br /> � TRENCH BACKFILL Compaction C�iteNa <br /> for Trench Backfill <br /> � PIPE BEDDING <br /> Proposed Student Fitness And Health Center <br /> Everett Community College <br /> NOTES: <br /> 1.All backfill under building areas should be compacted to G EO E N G I N E E R5� Figure 4 <br /> at Ieasl 95 percent pc�ASTM 01557. <br /> :'2, <br />
The URL can be used to link to this page
Your browser does not support the video tag.