Laserfiche WebLink
! <br /> � 6. Removal and Disoosal of Contaminated Materials: Remove all mntaminated soil and place <br /> on a plastic liner, cover with plastic, anc+ remove orfsite within 24 hours. Properly dispose <br /> I of contaminated soil at an approved disposal facility. Collect absorbent and other-naterials <br /> into a labeled ��nWfner and properly dispose of at an approved disposal facility. <br /> � 7. Follow-Uo ReQortina: Fill out a Spill Report Form wir,hin 2 working days and submit it to <br /> Contractor's �SC lead. <br /> SPCC Proyram Manayement <br /> IAll Contractor ernployees will be tr;ined in these spill control and response praedures, including <br /> spill source and receptor recognition, spill prevention techniques, spill response measures, and <br /> Ispill reporting protocol. <br /> Should site conditions change, this SPCC will be updated as necessary. <br /> I <br /> ( <br /> I <br /> I <br /> I <br /> I <br /> I <br /> i <br /> I <br /> I <br /> f <br /> IStermwa[er Site Plan OQ : 0 <br /> - Everett Communi[y Collegc <br /> Fitness Center 10 <br /> � 1082��.1� <br /> � <br />