Laserfiche WebLink
18. Buildings or poAions of buildings or facilities exceeding 30 feet in height above the lowest <br /> level of fire department vehicle access shall be provided with approved fire apparatus <br /> access roads capable of accommodating fire department aerial apparatus. Ov arhead <br /> utilitv and power lines shall not be located within the aerial fire aaaaratus access <br /> roadwav. <br /> GENERAL INFORMATION <br /> �. Puget Sound Energy is the natural gas provider in this a�ea. To initiate new service orders, <br /> please contact Maril���i Davis Westlund at (425;356-7512 at least 90 days prior to the <br /> required in-service uate. <br /> Any relocation of existing gas facilities for this development will be at the developer's sole <br /> erpense, and requires 90 days minimum �otice. Please contact Elaine Babby at(206)224- <br /> 2018 to coordinate relocation requests. <br /> 2. The Snohomish County PUD currently has su�cient capacity to serve the proposed <br /> development. For further in(ormation about specific electrical service requirPments, please <br /> call Kurt Martin of lhe DistricPs Customer Engineering office at(425)258-8291. <br /> 3. Verizon Northwest has facilities near this location. However, any building entrances must <br /> be coordinated at least 60 days in advance. The cost of any relocation of Verizon facilities <br /> that is required to construct!he new apartments will be at the tolal expense of the <br /> developer. Any relocation vdill take 60 to 120 days. Please contact Mike Hupf, Enyineer al <br /> (425)356-4053 or Mike Bly, Engineer at (425)356-4034 if you have any questions <br /> regardin� this building entrance. <br /> 4. Verizon Northwest wiil provide service to lhe site. However, new telephone cable <br /> conslruclion will be required in conjunction with the site development. Verizon's <br /> engineering will begin when lhey are noliFied of your construction schedules and telephone <br /> requirements. <br /> II will be the developer's responsibility to provide a suitable combination of conduit and <br /> trenching and/or riser conduit to accommodate Verizon's network communicalions cable <br /> within the complex. Provided that an acceptable combinalion o(conduit andlor trenching is <br /> incorperated into ;he project to accommodate Verizon's enlrance cable, there will be no <br /> costs to the developer for Verizon's cable. <br /> i(a rearrangement of existing cables on premises or on the riyht-of-way is necessary, <br /> appropriate charges will be estimaled and Verizon's Guaranly of Payment form will be <br /> forwarded to you for your signature. Prior lo commencement of Verizon's engineering for <br /> such rearrangement, a deposit will be required. To insure timely telephone service, <br /> Verizon requests ninety (90) days lead time for engineering, procurement, and insiallation <br /> of cable and/or Verizon's equipment. <br /> Please conlacl A4ichael Hupf, engineer, at (425)356-4052 or Mike Bly, Engineer at <br /> (425)356-4034 should you require additional informalion. <br /> 5�FSidciqlVJINWORD�SEPA\09-001 ECC heaqh-fitness FinaLdoc <br /> i <br /> l� <br /> ��v <br />