My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2206 TOWER ST EVCC HEALTH AND FITNESS CENTER 2018-01-01 MF Import
>
Address Records
>
TOWER ST
>
2206
>
EVCC HEALTH AND FITNESS CENTER
>
2206 TOWER ST EVCC HEALTH AND FITNESS CENTER 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2019 1:33:34 PM
Creation date
11/19/2019 12:06:41 PM
Metadata
Fields
Template:
Address Document
Street Name
TOWER ST
Street Number
2206
Tenant Name
EVCC HEALTH AND FITNESS CENTER
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I5.3 Conveyance System Analysis and Design <br /> I The project mnveyance system consists of an 8-inch and 12-inch diameter closed drainage pipe <br /> system that rnnnec[s to a city 18-inch storm sewer pipe in Tower Street. See Appendix A, <br /> Exhibit 2. <br /> I The Rational Method was used to check peak flow capacity and size mnveyana: pipes. <br /> � PrecipiWtion intensity vaiues were taken from the City of Everett Starmwaler/danagement <br /> Manual, Figure 1-5.1 (see Appendix A, Exhibit 8). The maximum values were used for <br /> � conservancy. All dra�nage basins were calc.ulated based on a minimum time of concentration of <br /> 6.3 minutes. The individual pipe runs were calculated by Manning's Equation (basin calculations <br /> and printouts are included below). See Appendix A, Exhibit 5 for Conveyance Basin Map and <br /> � Exhibit 6 for Pipe Conveyance Map. <br /> The pipe system was checked for minimum velaity for the 25-year stortn. All system <br /> components have a design velocity of at least 2 fps for the design stortn. Pipe capaciry was <br /> � analyzed for capacity for the 25-year storm. No backwater analysis was perfomied because all <br /> pipes v lthin the system function below 50 percent depth for the 100-year storm. <br /> 1 <br /> I <br /> � <br /> 1 <br /> � <br /> I <br /> I <br /> I <br /> I Stormwater Site Plan QQ : O <br /> Everett Community College <br /> Fltness Center 6 <br /> ( 208221.10 <br /> iC <br />
The URL can be used to link to this page
Your browser does not support the video tag.