My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3708-19
>
Ordinances
>
Ordinance 3708-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:18:55 AM
Creation date
11/20/2019 9:18:49 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3708-19
Date
11/13/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT <br /> WASHINGTON <br /> ORDINANCE NO. 3708-19 <br /> An ORDINANCE amending Ordinance No. 3578-17 entitled "Wall Street Building Window Replacement <br /> Project" (now called the Everett Municipal Building), Fund 342, Program 025,to accumulate the <br /> construction costs for the project in the amount of$535,000. <br /> WHEREAS, <br /> A. The City Council has recognized the need to replace glazing units on the north and west sides of <br /> the Wall Street Building (now called the Everett Municipal Building) located at 2930 Wetmore <br /> Avenue. <br /> B. Ordinance No. 3578-17 was established as Fund 342, Program 025 entitled "Wall Street Building <br /> Window Replacement Project" (now called the Everett Municipal Building) to accumulate the <br /> construction costs for the project in the amount of$155,000. <br /> C. Ordinance No. 3578-17 accumulated the construction costs for Phase 1 of the project <br /> D. The City Council has recognized the need to replace the glazing units on the south side of the Wall <br /> Street Building (now called the Everett Municipal Building). <br /> E. Ordinance No. 3633-18 was established amending Ordinance No. 3578-17 entitled "Wall Street <br /> Building Window Replacement Project" (now call the Everett Municipal building), Fund 342, <br /> Program 025,to accumulate the construction costs for the project in the amount of$305,000. <br /> F. Ordinance No. 3633-18 accumulated the construction costs for Phase 2 of the project. <br /> G. The City Council has recognized the need to replace the glazing units on the east side of the Wall <br /> Street Building (now called the Everett Municipal Building). <br /> H. Additional funding is required to replace the glazing units on the east side of the Wall Street <br /> Building (now called the Everett Municipal Building). <br /> I. The amending Ordinance will accumulate costs for Phase 3,the final phase of the project. <br /> NOW,THEREFORE,THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1. Section 1 of Ordinance No. 3633-18 which reads as follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.