<br /> EVERETT TEMPORARY EROSION AND SEDIMENT CONTROL NOTES: oQ ,
<br /> � �
<br /> m �
<br /> 1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD � i-`�-
<br /> OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES). � M �,
<br /> 2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT,AND UPGRADING OF M �
<br /> �: �
<br /> THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND N � •
<br /> APPROVED AND VEGETATION/LANDSCAPING IS ESTABLISHED. � �
<br /> N Z .
<br /> � W
<br /> . BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR TO a
<br /> CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE � � ,
<br /> PERMITTED. THE FLAGGWG SHALL BE MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE DURATION OF CONSTRUCTION. � Q
<br /> 4. THE ESC F A C I L I T I E S S H O W N O N T H I S P L A N M U S T B E CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING � N o
<br /> ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT SEDIME N T A N D S E D I M E N T L A D E N W A T E R D O N O T E N T E R T H E D R A I N A G E '— `� �
<br /> SYS7EM, ROADWAYS, OR VIOLATE APPLICABLE WATER QUALITY STANDARDS.
<br /> SEAL
<br /> 5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED S1TE CONDITIONS. DURING THE
<br /> CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO �
<br /> ENSURE THAT SEDIMENT AND SEDIMENT-LADEN WATER DO NOT LEAVE THE SITE.
<br /> 6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAWED BY THE APPLICANT/CONTRACTOR TO ENSURE THEIR � -
<br /> CONTINUED FUNCTIONING, ESPECIALLY AFTER STORM EVENTS. � ����4�
<br /> 7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN THE 48 �,h''' t��'.����
<br /> HOURS FOLLOWING A MAJOR STORM EVENT. '�'3 �„�' -� �
<br /> � �� � � ,
<br /> 8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A TRAPPED CATCH BASIN. ALL
<br /> CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH � y � ,
<br /> SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM. � � ��� � ��r� .
<br /> 9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE WSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE �;� ��1����� ;�s'�
<br /> DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN ���'1"��� '��
<br /> FOR THE DURATION OF THE PROJECT.
<br /> D ate:2018.05.30 15:53:37-07'00'
<br /> 10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND SEDIMENT TRACKED OFF THE SITE.
<br /> 11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE WATER BODIES IF THE PROPOSED Y
<br /> BMPS FAIL.
<br /> 12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR NO MORE THAN 2 DAYS FROM OCTOBER •
<br /> 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1 THROUGH SEPTEMBER 30. '
<br /> EVERETT STORM DRAINAGE NOTES:
<br /> 1. NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED, OR PUT INTO USE UNTIL IT HAS BEEN INSPECTED, TESTED,
<br /> AND ACCEPTED BY THE CITY OF EVERETT.
<br /> 2. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT DESIGN AND CONSTRUCTION STANDARDS AND y
<br /> SPECIFICATIONS AND THE WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION �
<br /> (CURRENT EDITION).
<br /> 3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE RECORDS AND ARE SHOWN FOR �
<br /> CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF LOCATIONS AND TO AVOID DAMAGE TO ANY
<br /> ADDITIONAL UTILITIES SHOWN. IF CONFLICTS WITH EXISTING UTILITIES ARISE DURING CONSTRUCTION, THE CONTRACTOR SHALL
<br /> NOTIFY THE PUBLIC WORKS INSPECTOR AND ANY CHANGES REQUIRED SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO � '
<br /> COMMENCEMENT OF RELATED CONSTRUCTION ON THE PROJECT.
<br /> 4. ALL STORM SYSTEMS WITHIN THE PUBLIC RIGHT-OF-WAY OR IN EASEMENTS MUST BE STAKED BY SURVEY FOR LINE AND GRADE �
<br /> PRIOR TO STARTWG CONSTRUCTION. � k4
<br /> 5. ALL CATCH BASIN GRATES MUST BE STENCILED OR STAMPED "DUMP NO WASTE, DRAINS TO STREAM, LAKE, RNER, PUGET SOUND, r , :z' ��
<br /> OR WETLAND." CHOOSE APPROPRIATE FEATURE FOR THE PROJECT. v -
<br /> � .
<br /> �..L.
<br /> � .
<br /> U
<br /> � � �
<br /> �
<br /> I�-- �.
<br /> EVERETT SEWER NOTES: �" � s
<br /> W ._�. r
<br /> A. ALL WORK AND MATERIALS SHALL CONFORM TO THE CITY OF EVERETT STANDARDS AND WSDOT/APWA STANDARD � �„� �
<br /> SPECIFICATIONS. I ' ' o
<br /> B. NO PART OF THE SANITARY SEWER SYSTEM SHALL BE COVERED, CONCEALED OR PUT INTO USE UNTIL IT HAS BEEN TESTED, W � � .
<br /> INSPECTED, AND APPROVED BY THE CITY INSPECTOR. > Q Q
<br /> C. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE RECORDS AND ARE SHOWN FOR W m �
<br /> CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF LOCATIONS AND TO AVOID DAMAGE TO ANY U O �
<br /> A D D I T I O N A L U T I L I T I E S N O T S H O W N. IF CONFLICTS WITH EXISTING UTILITIES ARISE DURING CONSTRUCTION, THE CONTRACTOR � U
<br /> SHALL NOTIFY THE PUBLIC WORKS INSPECTOR AND ANY CHANGES REQUIRED SHALL BE APPROVED BY THE CITY ENGINEER PRIOR W W
<br /> TO COMMENCEMENT OF RELATED CONSTRUCTION ON THE PROJECT. O W � W
<br /> D. ALL SEWER MAIN EXTENSIONS WITHIN THE PUB LI C R I G H T-O F-W A Y OR IN EASEMENTS MUST BE STAKED BY SURVEY FOR LINE AND n- Z � W "
<br /> GRADE PRIOR TO STARTING CONSTRUCTION. �
<br /> REVISIONS ,
<br /> EVERETT WATER NOTES: �
<br /> A. NO CONNECTION TO THE EXISTING MAINS WILL BE ALLOWED EXCEPT BY MEANS OF AN APPROVED BACKFLOW PREVENTION DEVICE
<br /> PRIOR TO SATISFACTORY FLUSHWG, TESTING, DISINFECTION, AND RECEIPT OF SATISFACTORY BACTERIOLOGICAL TEST RESULTS.
<br /> DATE �'
<br /> B. CONNECTIONS TO AND TAPS ON EXISTING MAINS WILL BE MADE BY THE PUBLIC WORKS DEPARTMENT AT THE DEVELOPER'S
<br /> EXPENSE. THE PUBLIC WORKS DEPARTMENT SHALL BE GIVEN AT LEAST 5 BUSINESS DAYS NOTICE FOR EACH CONNECTION. THE 05.29.2�18
<br /> PUBLIC WORKS DEPARTMENT SHALL THEREAFTER DETERMWE THE DATE AND TIME AT WHICH THE CONNECTION SHALL BE MADE. ecRnNo. �
<br /> C. ALL WORK AND MATERIALS MUST CONFORM TO CITY OF EVERETT STANDARDS.
<br /> D. A PRE-CONSTRUCTION MEETING SHALL BE HELD WITH THE CITY PRIOR TO THE START OF CONSTRUCTION. THE CITY OF EVERETT 14249 � .
<br /> PUBLIC WORKS CONSTRUCTION DIVISION MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO COMMENCEMENT OF CONSTRUCTION. or�nwNav:RJB DESIGNEDBY:SPI.JFR
<br /> E. THE DEVELOPER OR THE DEVELOPER'S AUTHORIZED AGENT SHALL NOTIFY THE PUBLIC WORKS DEPARTMENT OF A PERSON WHO REVIEWEDBY:.JFR
<br /> CAN BE CONTACTED REGARDING PROBLEMS DURING CONSTRUCTION ON A 24 HOUR BASIS.
<br /> F. MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL AND 18 INCHES VERTICAL SEPARATION BETWEEN POTABLE AND NON-POTABLE SHEETTITLE
<br /> GENERAL NOTES
<br /> m CONVEYANCE SYSTEMS. .
<br /> � G. ALL CITY OF EVERETT VALVES SHALL BE OPERATED BY PUBLIC WORKS DEPARTMENT PERSONNEL ONLY. ALL VALVES, NEW AND
<br /> o EXISTING, SHALL BE ACCESSIBLE AT ALL TIMES.
<br /> 0
<br /> 0
<br /> U
<br /> rn
<br /> �:
<br /> N '
<br /> � '4.
<br /> w .
<br /> �
<br /> Q
<br /> z
<br /> w •
<br /> J
<br /> LL � BC RA � �= �
<br /> �
<br /> Q -
<br /> �
<br /> � N �`��� �* � ; 0 COPYRIGHT 2017-BCRA;INC.ALL RIGHTS RESERVED �("'� �
<br /> �
<br /> � � �� �;x�; �---
<br /> 0
<br /> kk � ,7�, �1 ' •
<br /> 00 ��� �,� SHEET („(„' ' '
<br /> N �,:~��� � � 3 �..� LL., e
<br /> x4 �
<br /> N �� ��� ��; �
<br /> � � �
<br /> W �-y
<br /> O � '�� 1
<br /> J
<br /> Q Know what's below. � � � � �:
<br /> C1II before you dig. � �
<br /> � GIVIL PERMIT SET �
<br /> �
<br /> IF SHEET MEASURES LESS THAN 24`�C36°IT IS A REDUCED PRINT.REDUCE SCALE ACCORDIN�LY �