My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013/04/24 Council Agenda Packet
>
Council Agenda Packets
>
2013
>
2013/04/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 11:58:20 AM
Creation date
11/20/2019 11:51:28 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/24/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 4 <br /> PROJECT TITLE: <br /> Call for Bids for the Briefing COUNCIL BILL# <br /> construction of the SRO 7 Proposed Action Originating Department PW/Utilities <br /> Outfall Replacement Line Consent Contact Person Richard Hefti <br /> Action Phone Number 425-257-7215 <br /> First Reading FOR AGENDA OF 4/24/2013 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President ,' <br /> Location Preceding Action Attachments Department(s)Approval <br /> End of Pacific Ave, east None None PW <br /> of I-5. <br /> Amount Budgeted $160,000 <br /> Expenditure Required $2,000 Account Number(s):UP 3506 <br /> Budget Remaining $158,000 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The SRO 7 Outfall Replacement Project consists of installing a new 48-inch diameter storm drain from the <br /> point at which the old storm drain collapsed to the Snohomish River. This distance amounts to about 110 <br /> feet. The existing storm drain dates back to 1910. The collapsed section blocks the flow causing the <br /> upstream line to surcharge and flood areas in the intersection of Pacific Avenue and Chestnut Street. This <br /> project will alleviate those flooding problems. <br /> The project is planned this July to coincide with low tides so the work will be above the Snohomish water <br /> level. <br /> The project is ready to advertise for construction bids. There are no supplemental bidder requirements <br /> associated with this project. <br /> RECOMMENDATION(Exact action requested of Council): <br /> Authorize the Call for Bids for the construction of the SRO 7 Outfall Replacement Line. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.