'i <br /> -- -, <br /> � I <br /> � , <br /> I <br /> TIOi� OF NON-SIGNIFICANCC I <br /> FINAL DECLARA � <br /> �OR <br /> AERONAUT►CAL h1ACHINISTS, INC. <br /> SCPr1 //80-95 <br /> Description of Proposal <br /> The proposed action is the issuar�ce of building p�:rmits to allow the construction of a two- <br /> story of[ice building (37,420 sq. ft.). ! <br /> The foliowing factors werc considered and the listed conditions placed in response to �. <br /> comments submitted by various City departrnent.s after their review oi an Environmental <br /> Checklist for this proposal. <br /> l. A detailed drawing shall be suhmitted to the Public Works Department <br /> showing parbing layout, landscaping, driveways, utilities, storm drainage, <br /> and aU rcquired impro�•ancnts to thc public right-of-way. Public \Vc 'I<s <br /> Department approval of these drawings is required before any permits are <br /> issued. All improvements shall be completed before the Occupancy Permit <br /> is issued. <br /> As-builts, easernent. and a one year Warrar�tee C�ond in ttie amount of 10% of <br /> the cost of construction of the public water sy'sterr� are required within 10 <br /> worki�g days o: obtaining public w.3ter connertion. <br /> 2. Cit�� streets are to oe kept dcar of dirt and debris during construction. <br /> 3. During constri�ction, all truck tr:.ffic to and from the site within the City of. <br /> Everett shall bP a� arterial streets unless otherwise approved by ihe Public <br /> Works Depar[ment. <br /> 4. The approximate se��'er connection fee based on the preliminary information <br /> provided is $23,350.08 as of 1-19-81. The actual cost siiall be computed by <br /> the Duilding Department per the ordinance in effect at the time and <br /> according to thr information provided on the appro��ed plans on the date of <br /> permit iss�iance. <br /> 5. On-site detentio�� is required. Drainage calculations to be submitted on City <br /> Drainage Plan submission form. Resecding of exposed carth Is required <br /> witliin 30 days oi completion of earth work. <br /> 6. A preconstruction conference on Civil [ngineering poriion ot project is <br /> required prior to approval ot Public Worl<s Permit. The applicant shall <br /> arrangi� meeting involvin� applicant, job superintendent, contractor, all <br /> subcontractors, 1'ire �1arshal, Planning Dcpartment Coordinator, C�uilding <br /> ' Department Coordinator, Public Works Coordinator, Public 1Vorks Inspec?or, <br /> and City 7raftic Fngincer. <br /> 7. This site is in the �lukilteo \Vater District service arca. Construction plans I <br /> shall bc revicwed and approvcd by that agency prior to submittal. <br /> �� <br /> K � r , ! <br /> L G -__.� <br /> 1=. I,U .�— <br /> � �� <br />