Laserfiche WebLink
( �. <br /> Me Hale <br /> From: Tony Lee �o�aG-D5 � -F�,u -o�p <br /> Sent: Tuesday, January 22, 2008 10:55 AM <br /> To: 'James Minkley' <br /> ��; Meg Haley; Ted Budden <br /> SubJect: RE: Terra verde condos, sterliny >quare Ilc stainvays <br /> Mr. Minkley. Thank you for your response in this matter . We were originally <br /> contacted by the truss aupplier stating that the trusses that they designed were <br /> installed incorrectly, as well as the presence of site-built truases that they <br /> did not manufacture. I regret that we are not able to perform a reinspection <br /> until the following items have Ueen received and reviPwed: <br /> Certification ie required from the trusa manufacturer stating that the <br /> trusses as inetalled on eite are as designed. <br /> Any site-built truesea muet be apecifically designed and approved by an <br /> engineer licensed by the State of Washington. <br /> Alternatively, we can accept a letter from an engineer, licensed by the <br /> State of Waehingron which atates that the truasea as inetalled meet all required <br /> codea - both the trusaes manufacture3 on and off aite. <br /> I regret any further delays that ti�is may cause, however we can not approve the <br /> framing until we have written notification ae noted above. If I can be of <br /> further eervice, please don't heaitate to contact my by e-mail or phone. <br /> Sincerely, Tony I,��� <br /> Aseietant Buildinq o( fi��i.�l <br /> (425) 257-8812 <br /> --Original Meseaye — <br /> From: Jamea Minkley [mailto:J�mes-�jamesminkley.com] <br /> Sent : Fri�ay, January 18, 2008 3 : 23 PM <br /> To: Richard Berg; Meg Haley; Tony Lee <br /> Subject : Te7-ra verde condos, aterling equare llc stairways <br /> Importance: High <br /> Attached ie the letter from the architect as requested approving the site built <br /> trusses. Please reinspect aa needed as soon ae possible so we can complete the <br /> stairways . <br /> 1 <br />