Laserfiche WebLink
i <br /> IIf imp.�rtnnt changcs arc madc aflcr lhc datc of this r°port, Gcolingincers should bc givcn the opportunity <br /> to revicw our interprctations and rccommcndations nnd provide written madifica�ions or confirmation, as <br /> approprinlc. <br /> SUBSURFACE CONDITIONS CAN CHANGE <br /> 1'his gculcchnical or geologic rcpon is bascd on conditions Ihat cxisted at Ihe time Ihc swdy was <br /> perfartncd. The findings and conclusions of this rcport rnay be affectc�f by the passagc of time, by <br /> m�nm�dc evcros such as canswction on or edjaccnt to the sitc, or by newrel evcnts such as Ooods, <br /> carthquakcs, slopc instnbiliry or groundwatcr Iluctualions. Always wntnct Gcofinginccrs lxforc applying <br /> a rc�ttt to dctcrniine if it rcmeins epplirablc. <br /> MOST GEOTECHNICAL AND GEOLOGIC FINDINGS ARE PROFESSIONAL OPINIONS <br /> Our inlcrprclations of subsurfacc conditions arc based on ficld ohscrvations Gom widcly spaccd sampling <br /> � localinns at thc sitc. Sitc cxploration idcntifics subsurfacc conditions only at thosc points whcrc <br /> I subsurfacc tesis orc conducicd or samplcs am taken. Gwlinginecrs rcviewcd ficld end Inboratory data <br /> and Ihcn applicd our profcssional judgmcm lo rcndcr an opinion about subsurface conditions throughout <br /> lhe site. Actual subsurface conditions may differ, sometimes significantly, irom those indicated in this <br /> rcport. Our rcport, conclusions and intcrprctations should not bc construcd as a warranty of thc <br /> subsurlacc condilions. <br /> GEOTECHNICAL ENGINEERING REPORT RECOMMENDATIONS ARE NOT FINAL <br /> Do not over-rely un die preliminary conslruction recommendations included in this report. 7'hcse <br /> rceommcndations are not �inal, bccausc ihcy wcrc devcloped principally from Gcol:nginecrs' profcssional <br /> judgmenl and opinion. (icolinginecrs' r�v:ommendations can bc linalized only by obscrving ectual <br /> suhsurfacc conditions rcvcalcd during conswction. Gcolinginccrs cannot assumc responsibiliry or <br /> liabiliry fix this rcpon's rccommcndations if wc do not perfi�rm construction obscrvation. <br /> Sufticicnl moniloring, tcsting and consultation by(icolinginccrs should bc provided durinti construction <br /> i to rnnlirni that the conditinns cncoumcrcd are consistent with those indicated by the explorations, io <br /> providc rccommcndalions litt dcsign changcs should the condilions revcalcd during ihc work difTer from <br /> Ihosc anticipatcd, and Io cvaluatc whcthcr or not carthwork activilics are complcted in acwrdance wilh <br /> our rccommcndations. Rclaining Gcol:nginccrs tix construction obscrvalian for this projccl is Ihc mosl <br /> ctYcc�ivc mcihod of managing thc risks nssociatcd with unanticipatcd conditions. <br /> A GEOTECHNICAL ENGINEERING OR GEOLOGIC REPORT COULD BE SUBJECT TO <br /> I MISINTERPRETATION <br /> Misintcrprclation of this rcpon hy othcr dcsign Icam mcmhcrs can rcsult in costly problems. You could <br /> �i lowcr Ihai nsk by h�ving (icolinginecrs confcr with appropriatc mcmbcrs of the design tenm allcr <br /> submitling Ihc rcporl. Also rclain Gculinginccrs to rcvicw pertincm clemcnts of thc dcsign team's plans <br /> �n� spcci�ica�inns. Conlmctors can also misintcrprct n �colcchnicnl cn@inccring or gcologic re�rt. <br /> I Kcducc Ihat risk hy having(icol:nginccrs participatc in prc-hid and prcconstruction confcrcnccs, and by <br /> proeiding consWclion obscrvation. <br /> i DO NOT REDRAW TH� cXPLORATION LOGS <br /> (ieolechnical engin:crs and geologisis prepare �inal bonng and tcsting logs hased upon their <br /> Iimcrprct.uiun of IicIJ lo�!s and lahoretory dala. To prcvcnt crrors or omissions, thc logs includcd in a <br /> I F�lrNn 1uvt.11ly-�i7 PageR-1 �iEOENGINEEIIS� <br /> A/ac:: 'INIV <br /> �- <br />