Laserfiche WebLink
FINAL DECLN2ATI014 OP NON-SIGNIFICANCE <br />� % . / z ,a <br />�L-G � <br />�_ L l S -t� <br />�•�,--i � ' 9 <br />r-• � ,_ - <br />The proposed action is the issuance of grading and building permits to <br />allow the construction of a 28,000 square foot metal bua.lding. The following <br />factors were considered and the listed requirements were placed in response to <br />comments submitted during a review of an Environmental Checklist for this <br />proposal: <br />1. <br />� <br />3 <br />4. <br />The site is zoned PI-1, tleavy Manufacturing Zone and would allow <br />this use. The site currently has two existing buildingsroximately <br />are bein9 used for boat construction. The remaining app <br />two-thirds of tlie property is vacant. No standard street improvements <br />exist on Norton Avenue and no landscaping currentl5' exists on the <br />property. <br />Sealed and upen containers of carcinogenic and low flash-pcint volatile <br />hydrocaibons and resins are currently in open storage on the site. <br />Activities involved in the handling and storaqe of fuel, chemicals, oil <br />and other substances with the potential for spillage into adjacent <br />waters, shall have operational procedures to handle potential spills. <br />In addition, nhysical structures which would contain any potential <br />spills shall also be provided. (Ground seepage of chemicals). <br />A plan is required indicating how drainage is to be conveyed from the <br />site and how and where it ultimately drains. Provisions for oil <br />separation is also required. All activitics shall provide a means <br />of reducing the polluting potential of surface water run-off, generated <br />from inpervious surfaces sucli as streets, parking lots and storage <br />areas. <br />A detailed drawing shall be submitted to the Public Works Department <br />showin9 parking layout, landscaping, driveways, utilities, storm <br />drainage (includirg flow lines and grate eievaCions), and all required <br />improvemerits to the public right-of-way. Public Works Department <br />approval of these drawin9s is required Uefore any P�n"its are issued. <br />All improveanents shall be completed before the Occupancy Permit is <br />issued. Plans shall include the autliority (permi.ssion/agrcement) for, <br />and the existing and proposed improvements to off-site.access road <br />from Norton to Che site. Improvements to Norton Avenue must be made <br />in coniormance with Ordinance 555-78. <br />S. Participating in the program L-o fund the north end sanitary sawer <br />inCerceptor is required. <br />6. Durin9 construction, City streets are to Ue kept clear of dirt and <br />debris and all truck traffic to and fr.om the site within theroved bY <br />pP EVerett shall be on arterial streets unless oCherwise app <br />the Public Works Department. <br />7, A fire tiydrant is requized within 200 fcet of all Uuildings. <br />II. Parkin9 shall provide a minimum of one space for each three employees <br />or one for each A00 square feet of gross floor area, whicl�ever is 9reater. <br />A mi• .��^m of S't, of total pev:king area shall be landscaped. <br />y� <br />H �- <br />�� <br />�� <br />��. <br />r, <br />y F. <br />�3 � <br />�- <br />�: <br />� ;_. <br />r� r <br />O �' <br />.: <br />�, <br />� i:. <br />�'S � . <br />�� <br />