My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1200 W MARINE VIEW DR CRAFTSMAN BOATYARD 2018-01-01 MF Import
>
Address Records
>
W MARINE VIEW DR
>
1200
>
CRAFTSMAN BOATYARD
>
1200 W MARINE VIEW DR CRAFTSMAN BOATYARD 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2019 3:12:58 PM
Creation date
11/22/2019 3:04:49 PM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1200
Tenant Name
CRAFTSMAN BOATYARD
Notes
PORT INFRASTRUCTURE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pagc 1 of 2 <br />Kirk Brooks (�W� C� G� •- <br />From: Larry Crawford [LCrawford@portofeverett.com] <br />Sent: Thursday, July 27, 2006 8:52 AM <br />To: Tom Thetford; Kirk Brooks <br />Cc: Eric Russell; Mark Sadler <br />Subject: RE: NMR Sewer System <br />TomlKirk- <br />The Port would like to move this discussion along as we (inalize the North Marina Redevelopment Phase 1 infrastructure <br />plans. As you are probably aware, lhe initiai redevelopment phase is a gravity sewer system. Subsequent development <br />wes� of Phase 1 will require a pump station. The Port underslands that the future pump station will be required to meet <br />City standards—backup generator, elc.—in order (or the City to assume ownership and maintenance of the overall <br />system. <br />It has been the Port's understanding, since our inilial master planning eHorts, that the sewer system serving the bulk o( <br />the site would be a public system—not unlike the tuture public water system. <br />The Crafisman District, the northern developmenl area, will reiy on a small 2" sewer pump system. The Port recognizes <br />that this system will not meet City slandards and will require the Port to retain ownership and mainlenance. <br />Please advise if a meeting �vould be helpful. <br />Thanks, Larry <br />From: Kirk Brooks [mailto:KBrooks@ci.everett.wa.us] <br />Sent: Wednesday, ]uly O5, 2006 11:25 AM <br />To: Larry Crewford <br />Cc: Tom Thetford; Mark Sadler <br />Subject: RE: NMR Sewer Sys[em <br />Larry, <br />We will be having an inlernal discussion on this tornorro�v. Tom or I will get back lo you after thal. Appreciate your input. <br />Thanks, I<irk <br />From: Larry Crawford [mailto:LCrawford@portofeverett.com] <br />Sent: Monday, ]uly 03, 2006 9:41 AM <br />To: Kirk Brooks <br />Cc: Eric Russell; Poli Luis <br />Subject: NMR Sewer System <br />Kirk- <br />Following up lo our discussion at last week's monthly coordination meeting, I have looked inte !he issue of the PorCs <br />understandinglexpeclation regarding the ultimate ownership and maintenance 8 operation of �e North Marina <br />Redevelopment site sewer system. For ihe reasons I mentioned at the meeting, the Port is u.,ier lhe opinion that the <br />system should be the City's. Of speci(ic relevance, is the fact that there wili ultimately be some 660 residential condo <br />units ihat will expecl sa(e and unint�rrupted water and sewer service. <br />� <br />7/31 /�OOG <br />
The URL can be used to link to this page
Your browser does not support the video tag.