My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/11/20 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/11/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2019 9:43:00 AM
Creation date
11/26/2019 9:31:15 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/20/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br /> 2513-3 <br /> • Drawings/sketches will be created by Otak with review and redline edits by CCI(up to 7 sheets) <br /> • Existing design and/or as-built documents related to repairs from Station DD5-A-325+00 to <br /> DD5-A-343+00 (Reaches 1,2, and 3)will be provided by Otak. <br /> • OTAK/DD5 will provide updated periodic inspection reports, summary of observed <br /> deficiencies,as-built drawings from USACE dike repairs, and current photographs of Reaches <br /> 1, 2, and 3. <br /> • Design of a floodwall or design for complete replacement of the dike is not included in this <br /> scope. <br /> • The design criteria for top elevation of the dike under I-5 will be as high as practical given the <br /> space constraints from the elevation of the Interstate-5 bridge girders. The bottom elevation <br /> of the bridge girders generally ranges from 15.1' to 16.0' NAVD88, and therefore the top <br /> elevation of adequately compacted dike fill will be limited by the girder elevation. <br /> • No additional site visit and explorations are anticipated to be performed by CCI <br /> Cost Estimate and Timeline <br /> Our estimated cost to complete the scope of work outlined above is a Not-to-Exceed sum of$25,400. <br /> This amount would not be exceeded without your prior authorization. We would perform the work <br /> in coordination with Otak's schedule with The City of Everett with a completion schedule at <br /> approximately 36 weeks from receiving Notice-to-Proceed(NTP). <br /> We appreciate the opportunity to be of continued service. If you have any questions,please feel free <br /> to call Wade N. Osborne at(503)452-1100. <br /> Very truly yours, <br /> CORNFORTH CONSULTANTS,INC. <br /> Michael R. Meyer,P.E. <br /> President <br /> October 18,2019 t 6 Comforth Consultants,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.