My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013/06/05 Council Agenda Packet
>
Council Agenda Packets
>
2013
>
2013/06/05 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2019 10:37:08 AM
Creation date
11/26/2019 10:34:41 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/5/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET j. <br /> PROJECT TITLE: <br /> A call for bids for the East Briefing COUNCIL BILL# <br /> Everett Pedestrian Walkway Proposed Action Originating Department Public Works <br /> project, Phase II, Stage 3 Consent Contact Person 4�.,� Ryan Sass, P.E. <br /> Action Phone Number 425-257-8942 <br /> First Reading FOR AGENDA OF June 5, 2013 <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head \, ) <br /> CAA t(i)- <br /> Council <br /> President <br /> Location Preceding Action Attachments Department(s)Approval <br /> East Marine View Dr.— 11/13/02 Ord. 2656-02 Vicinity map <br /> 21st St. to Summit Ave. approved <br /> Amount Budgeted $ 651,191.00 est. <br /> Expenditure Required -0- Account Number(s): PW2696 <br /> Budget Remaining -0- <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The construction plans and specifications are complete and the project is ready to be advertised for <br /> construction bids. <br /> This project will construct the final segment of a pedestrian facility on East Marine View Drive. This <br /> segment will connect existing non-motorized facilities built as part of other pedestrian projects.. on the east <br /> side of the City. <br /> The funding sources for this project are: <br /> STPE—Federal Funds $ 205,129.00 <br /> Fund 119—Street Improvements 446,062.00 <br /> Total $ 651,191.00 <br /> RECOMMENDATION(Exact action requested of Council): <br /> Authorize a call for bids for the East Everett Pedestrian Walkway project, Phase II, Stage 3. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.