My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013/06/26 Council Agenda Packet
>
Council Agenda Packets
>
2013
>
2013/06/26 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2019 11:29:09 AM
Creation date
11/26/2019 11:24:13 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/26/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Change Order#2 with SRV Briefmg COUNCIL BILL# <br /> Construction for the Water Proposed Action Originating Department Public Works <br /> Main Improvement"K" and Consent Contact Person Al Rosenzweig <br /> Sewer Main Replacement Action Phone Number 425-257-7221 <br /> project. First Reading FOR AGENDA OF 6/26/2013 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> v <br /> Location Preceding Action Attachments Department(s)Approval <br /> South 2nd& 3rd from 3/12/2012Bid Change Order#2 Public Works <br /> 42nd to Ravenna 3/28/2012 Award <br /> 8/23/2012 Change Order 1 <br /> Amount Budgeted $2,600,000.00 Account Number(s): UP 3443 <br /> Expenditure Required $126,602.07 Exclusive of Washington State Sales Tax <br /> Budget Remaining $103,726.73 <br /> Additional Required $0.00 <br /> DETAILED SUMMARY STATEMENT: <br /> The City has a contract with SRV Construction for the Water Main Improvement"K"and Sewer Main <br /> Replacement project. Change Order#2 modifies (1)bid item and adds two (2)new bid items to the <br /> contract as follows: <br /> Modify: Schedule A-Bid Item 5 adds 550 hours of traffic control labor at the unit price of <br /> $49.00/hour,resulting in a$26,950.00 increase to the contract. <br /> Add: Schedule A-Bid Item 62 is added as"Revised HMA Patch Price" at the unit price of <br /> $64.29/ton for 1,204.12 tons,resulting in a$77,412.87 increase to the contract. <br /> Add: Schedule B -Bid Item 36 is added AS "Revised HMA Patch Price"at the unit price of <br /> $64.29/ton for 345.92 tons,resulting in a$22,239.20 increase to the contract. <br /> Change Order#2 also adds 37 calendar days to the contract time due to the many unforeseen conditions <br /> encountered during work on this project. <br /> Change Order#2 is also written to cover final agreements reached between the parties,to allow a final <br /> estimate and cost agreement to achieve project closure and final acceptance. <br /> RECOMMENDATION(Exact action requested of Council): <br /> Authorize the Mayor to sign Change Order#2 with SRV Construction for the Water Main <br /> Improvement"K"and Sewer Main Replacement project for a net increase of$126,602.07,not <br /> including Washington State Sales Tax to the total Contract price. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.