Laserfiche WebLink
ARCHITECTS, P.S.C. <br />ARCHITECTURE <br />PLANNING <br />INTERIORS <br />919 I1�TH AVE N.E. <br />SUITE 101 <br />BELLEVUE, WA 98005 <br />�25.�55.320J <br />�I5.155,9)51 (FAX) <br />www.fconxoha0�crom.cor <br />January� ,2003 <br />� <br />Tony Lee <br />Plans Examiner � <br />CITY OF EVERETT � <br />PUBLIC WORKS �� <br />ENGINEERING / PUBLIC SERVICES DEPARTM � <br />3200 Cedaz Street c �qN <br />Everett, WA 98201 ��j' pF '� 0�3 <br />'��� FyFp,, <br />RE: Child Evangelism Fellow: hipo Sa <br />1832 Walnut Street ���s's •� <br />Plan Review Number: B0301-018 <br />Dear Tony, <br />I have reviewed your January 27, 2003 plan re:�iew !etter and offer the following <br />responses: <br />1. The westem exterior wall has been revised to provide one-hour construction per <br />UBC Table 7-B, Item Number 18-1.1. The exterior wall construction is identified <br />as Wall Type 5 in the Wall Legend / Schedule on sheet A2 and in Section A-A on <br />sheet A4. <br />2. A parapet has been added to the westem exterior wall as shown on the West <br />Elevation on sheet A3 and Section A-A on sheet A4. <br />3. The R 30 batt insulation between the roof joists has been replaced with R 30 rigid <br />insulation on the roof, as indicated in Section A-A on sheet A4, thercby <br />eliminating the ventilation requirements. <br />4. The window into O�ce 2 will have safety glazing as indicuted in Floor Plan Key <br />Note 4 on sheet A2. <br />5. Fire blocking is located in the wall at the intersection with the suspended ceiling as <br />indicated in Section A-A on sheet A4. <br />6. Floor Plan Key Note 11 on sheet A2 identifies the toilet flush control location. <br />Enclosed herewith are 2 copies of the sheets including the above noted revisions. <br />If you should have any questions, or require additional information, please call me at <br />425.455.3203 or e-mail me at johnh(u»sconzoh^.Ilstrom.com. <br />Sinccrely, <br />I � �� <br />J hn G. Hallstrom, AIA <br />�ncipal <br />conzo HallsWm Architects, PSC <br />