Laserfiche WebLink
PUBLIC WORK <br />w l 1` ' u Item <br />Umt <br />-Quantity <br />77 <br />Umt Pace <br />r <br />Amount <br />Pavin^ <br />AC Pavement Patching (Includes <br />removal of old pavement) <br />S.Y. <br />40.00 <br />4 Inch Crushed Rock <br />S.Y. <br />4.00 <br />6 Inch Crushed Rock <br />S.Y. <br />6.00 <br />2 Inch Class HMA <br />S.Y. <br />8.OD <br />3 Inch Class HMA <br />S.Y. <br />12.OD <br />4 Inch Class HMA <br />S.Y. <br />16.00 <br />Bank Run Gravel, 3" (screened In <br />place <br />C.Y. <br />7.50 <br />5/6" Crushed Rock, In Place <br />C.Y. <br />8.00 <br />Saw Cut AC Pavement <br />Ft. <br />2.00 <br />Other Driveway <br />S•F. <br />350 <br />4.00 <br />1400 <br />Other PCC <br />S . F . <br />620 <br />2.50 <br />1550 <br />Paving Total: $ 1950 <br />Curb & Gutter <br />Curb &Gutter L.F. 152 16.00 2432 <br />Other <br />Curb &Gutter Total: $ 2432 <br />cosT Esr EEE CMC-20M <br />