Laserfiche WebLink
PUBLIC OORKS PERMIT <br />City of Everett Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425) 257-8810 <br />OWNER NAME AND ADDRESS: <br />EOUILON ENTERPRISES LLC <br />PO BOX 4453 <br />• <br />Date <br />10/612014 <br />Public Works Permit #. <br />PW 1410-008 <br />Buildinq Permit#. <br />B1405-007 <br />Planninq Reference # <br />Public Works Fee S <br />$ 19,800 00 <br />Other S <br />APPLICANT NAME AND ADDRESS: <br />CARYL PINNER <br />BARGHAUSEN CONSULTING <br />HOUSTON TX 77210 KENT WA 98032 <br />PHONE: PHONE: 4252516222 <br />TAX PARCEL ID # 00467300200200 SITE ADDRESS: 2631 WALNUT ST <br />DESCRIPTION OF PROPOSED WORK: <br />TRAFFIC MITIGATION FOR NEW STORE & GAS-JACKSONS STORE <br />INCLUDES GAS CANOPY <br />PERMIT CONDITIONS <br />1 All calls for inspection shall be made 24 hours in advance <br />2 All work shall be performed in accordance with the permit and current City of Everett Design and Construction <br />Standards <br />and Specifications <br />3 Call Location Underground Service 48 hrs before you dig TOLL FREE NUMBER 811 <br />4 Per SEPA14-008 <br />T <br />m <br />c1. <br />r <br />ti <br />Rrt o <br />_z <br />LTI <br />r c•i •--'• r� r• m r• r l .�. r• !« r• w r- i" in <br />L <br />:10 <br />Approved for Construction Date <br />FINAL INSPECTION Date <br />Approved as Constructed <br />ACKNOWLEDGEMENT OF CONDITIONS <br />the undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement <br />or other right-of-way use hereto applied for and further agrees <br />to remove same upon lotice from tare City and to replace <br />public prioperty damag d thereby. <br />of <br />Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 18D DAYS OF DATE qE MIT IS ISSUED AND THEREAFTER IS TO DE DILIGENTLY <br />PURSUED TO COMPLETION. THIS PERMIT MAYBE CANCELLED BY THE CITY UPON ANY,�TOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />