Laserfiche WebLink
Drainage Report—Revision 1 <br /> Boeing Everett—Rail Spur Parking Lot September 26,2013 <br /> Road. Runoff from the south subbasin will enter an existing catch basin south of the proposed <br /> pavement before conveyance to a StormFilter Catch Basin in the southern portion of the new <br /> pavement area. From the StormFilter Catch Basin, this runoff will tie into an existing catch basin <br /> west of the proposed pavement area and discharge in Japanese Gulch. See the Stormwater Plans <br /> in APPENDIX D for detailed drawings of the stormwater system. <br /> 6. SPECIAL REPORTS AND STUDIES <br /> No special reports or studies were done as part of this project. <br /> 7. BASIN AND COMMUNITY PLANNING AREAS <br /> No basin or community planning areas are associated with the development of the site that would <br /> require additional requirements beyond those stipulated in the Stormwater Manual. <br /> 8. OTHER PERMITS <br /> A Washington State Department of Ecology Construction Stormwater Permit will be required for <br /> the project and has been prepared and will be submitted by others under separate cover.No other <br /> permits beyond the Clearing and Grading Permit will be required by the City of Everett. <br /> 9. EROSION AND SEDIMENT CONTROL PLAN <br /> The ESC Plan was prepared in accordance with the Stormwater Manual. ESC measures were <br /> designed for the project and are shown on the TESC plan in APPENDIX C. <br /> 9.1 ESC Requirement#1: Stabilization and Sediment Trapping <br /> All exposed soils shall be stabilized from erosion, protected with sediment trapping measures, <br /> and when possible, be located away from storm drain inlets, waterways, and drainage channels. <br /> From October 1 to April 30, no soils shall remain unstabilized for more than 2 days. From May 1 <br /> to September 30, no soils shall remain unstabilized for more than 7 days. Prior to leaving the site, <br /> stormwater runoff shall pass through an appropriate sediment removal BMP. Stabilization and <br /> sediment trapping BMPs applicable to this project include: <br /> • BMP E1.20: Clean Plastic Covering <br /> • BMP E2.20: Dust Control <br /> • BMP E3.10: Filter Fence <br /> • BMP E3.15: Straw Bale Barrier <br /> 9.2 ESC Requirement#2: Delineate Clearing and Easement Limits <br /> In the field, clearing limits and easements, setbacks, sensitive/critical areas and their buffers, <br /> trees, and drainage courses will be marked. The BMPs relevant to marking the clearing limits <br /> that will be applied for this project may include: <br /> • BMP C103: High Visibility Plastic Fence <br /> DCG, Inc. Page 8 of 11 <br />