My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-YD 2019-11-27
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-YD
>
3003 W CASINO RD BLDG 40-YD 2019-11-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 1:59:03 PM
Creation date
11/27/2019 1:51:47 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-YD
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Assumptions <br /> • No rainfall for 24 hours or more <br /> IN / <br /> • <br /> • No upstream detention(at least not draining into StormFilter) '' ��ytr,. .. <br /> • Structure is online . <br /> • Outlet pipe is clear of obstruction i �; <br /> • Construction bypass is plugged 40 <br /> 1 , )r t <br /> Maintenance _ <br /> Depending on the configuration of the particular system, r _ <br /> maintenance personnel will be required to enter the vault to 0i <br /> perform the maintenance. - �. <br /> Important: If vault entry is required,OSHA rules for confined i <br /> _ , es* <br /> space entry must be followed. <br /> Allihi. '- <br /> Filter cartridge replacement should occur during dry weather. i,..,.:,,, -... . . f`t ' <br /> I.,..4: ,. + III '�a+i <br /> It may be necessary to plug the filter inlet pipe if base flows is " <br /> occurring. . TM' t <br /> Replacement cartridges can be delivered to the site or customers _ • ( m <br /> facility. Information concerning how to obtain the replacement n • <br /> �` i 1 `. ilo , <br /> cartridges is available from CONTECH Construction Products. 1 �i . `",?„ " <br /> '".•l�s • <br /> Warning: In the case of a spill,the maintenance personnel ' R i p <br /> should abort maintenance activities until the proper . <br /> guidance is obtained. Notify the local hazard control <br /> agency and CONTECH Construction Products immediately. <br /> To conduct cartridge replacement and sediment removal <br /> maintenance: Important: Note that cartridges containing leaf media(CSF)do <br /> 1. If applicable, set up safety equipment to protect maintenance not require unscrewing from their connectors.Take care <br /> personnel and pedestrians from site hazards. not to damage the manifold connectors.This connector <br /> 2.Visually inspect the external condition of the unit and take should remain installed in the manifold and could be <br /> notes concerning defects/problems. capped during the maintenance activity to prevent <br /> sediments from entering the underdrain manifold. <br /> 3.Open the doors(access portals)to the vault and allow the <br /> system to vent. B. Remove the used cartridges(up to 250 lbs. each)from the <br /> 4.Without entering the vault,give the inside of the unit, vault. <br /> including components, a general condition inspection. Important: Care must be used to avoid damaging the <br /> 5.Make notes about the external and internal condition of cartridges during removal and installation.The cost of <br /> the vault. Give particular attention to recording the level of repairing components damaged during maintenance <br /> sediment build-up on the floor of the vault, in the forebay, will be the responsibility of the owner unless CONTECH <br /> and on top of the internal components. Construction Products performs the maintenance activities <br /> 6.Using appropriate equipment offload the replacement and damage is not related to discharges to the system. <br /> cartridges(up to 150 lbs. each)and set aside. <br /> C. Set the used cartridge aside or load onto the hauling <br /> 7.Remove used cartridges from the vault using one of the truck. <br /> following methods: <br /> D. Continue steps a through c until all cartridges have been <br /> Method 1: removed. <br /> A. This activity will require that maintenance personnel enter <br /> the vault to remove the cartridges from the under drain Method 2: <br /> manifold and place them under the vault opening for A. Enter the vault using appropriate confined space <br /> lifting(removal). Unscrew(counterclockwise rotations) protocols. <br /> each filter cartridge from the underdrain connector. <br /> Roll the loose cartridge,on edge,to a convenient spot B. Unscrew the cartridge cap. <br /> beneath the vault access. C. Remove the cartridge hood screws(3) hood and float. <br /> Using appropriate hoisting equipment,attach a cable D. At location under structure access,tip the cartridge on its <br /> from the boom, crane,or tripod to the loose cartridge. side. <br /> Contact CONTECH Construction Products for suggested <br /> attachment devices. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.