Laserfiche WebLink
113 AXVI <br /> • <br /> 118 AIV <br /> • <br /> • <br /> 123 WQN2 <br /> • <br /> 126 AIPOND <br /> V <br /> V <br /> 129 POND <br /> (***) RUNOFF ALSO COMPUTED AT THIS LOCATION <br /> 1***************************************** **********************************,t**** <br /> * * * * <br /> * FLOOD HYDROGRAPH PACKAGE (HEC-1) * * U.S. ARMY CORPS OF ENGINEERS * <br /> * FEBRUARY 1981 * * THE HYDROLOGIC ENGINEERING CENTER * <br /> * REVIS:4 01 JUN 88 * * 609 SECOND STREET <br /> * * * DAVIS, CALIFORNIA 95616 * <br /> * RUN DATE 01/15/1992 TIME 20:05:29 * * (916) 551-1748 <br /> * * * * <br /> ***************************************** *************************************** <br /> BOEING EVERETT SITE - JAPANESE GULCH BASIN 1/14/92 <br /> HYDROLOGIC CALCULATIONS FOR WATER QUALITY SWALE DESIGN <br /> 10-YEAR, 24-HOUR EVENT <br /> 6 IO OUTPUT CONTROL VARIABLES <br /> IPRNT 4 PRINT CONTROL <br /> IPLOT 0 PLOT CONTROL <br /> QSCAL 0. HYDROGRAPH PLAT SCALE <br /> IT HYDROGRAPH TIME DATA <br /> MAIN 5 MINUTES IN COMPUTATION INTERVAL <br /> IRATE 14JAN92 STARTING DATE <br /> ITIME 0000 STARTING TIME <br /> NQ 300 NUMBER OF HYDROGRAPH ORDINATES <br /> IODATE 15JAN92 ENDING DATE <br /> NDTIME 0055 ENDING TIME <br /> ICENT 19 CENTURY MARK <br /> COMPUTATION INTERVAL .08 HOURS <br /> TOTAL TIME BASE 24.92 HOURS <br /> ENGLISH UNITS <br /> DRAINAGE AREA SQUARE MILES <br />