Laserfiche WebLink
• <br /> • <br /> • <br /> 113 • <br /> AXVI <br /> 118 AIV <br /> 123 WQN2.................................... <br /> • <br /> 126 INPOND <br /> V <br /> V <br /> 129 POND <br /> (***) RUNOFF ALSO COMPUTED AT THIS LOCATION <br /> 1***************************************** *************************************** <br /> * * * * <br /> * FLOOD BYDROGRAPH PACKAGE (HEC-1) * * Q.S. ARMY CORPS OF ENGINEERS * <br /> * FEBRUARY 1981 * * THE HYDROLOGIC ENGINEERING CENTER * <br /> * REVISED 01 JUN 88 * * 609 SECOND STREET <br /> * t * DAVIS, CALIFORNIA 95616 <br /> * RUN DATE 01/15/1992 TIME 20:08:40 * * (916) 551-1748 * <br /> * * * * <br /> **A************************************** *************************************** <br /> BOEING EVERETT SITE - JAPANESE GULCH BASIN 1/14/92 <br /> HYDROLOGIC CALCULATIONS FOR WATER QUALITY SWALE DESIGN <br /> 25-YEAR, 24-HOUR EVENT <br /> 6 10 OUTPUT CONTROL VARIABLES <br /> IPRNT 4 PRINT CONTROL <br /> IPIAT0 PLOT CONTROL <br /> QSCAL 0. KYMOGRAPH PIAT SCALE <br /> IT HYDR©GRAPH TIME DATA <br /> MIN 5 MINUTES IN (AMPUTATION INTERVAL <br /> IDATE 14JAN92 STARTING DATE <br /> ITIME 0000 STARTING TIME <br /> NQ 300 NUMBER OF HYDROGRAPH ORDINATES <br /> NDDATE 15JAN92 ENDING DATE <br /> NDTIME 0055 :WRING TIME <br /> ICENT 19 CENTURY . <br /> COMPUTATION INTERVAL .08 HOURS <br /> TOTAL TIME BASF 24.92 HOURS <br /> ENGLISH UNITS <br /> DRAINAGE AREA, SQUARE MILES <br />