Laserfiche WebLink
MURRAYSMITH: <br /> 5.1 Attend one pre-bid conference <br /> 5.2 Respond to bid-phase RFIs <br /> 5.3 Prepare one addendum communications <br /> 5,4 Maintain a written record of bid-phasedocument <br /> Tinting bid documents, bid <br /> Assumptions: bid evaluation,addenda distribution,plan holder administration, <br /> The City of Everett will take the led in tasks associated withp S otherwise <br /> - unles <br /> distribution,bid advertisement, enc fees. <br /> tabultion,etc. performed up to the extent of the fee estimate, <br /> bidding will be p authorized use of contingency- <br /> Supportrve in advanceices dthgrough <br /> a contract amendment or city <br /> approved in through <br /> Deliverables:- MSW°rd) <br /> Bidder communications log( to distribute to plan holders(PDF) <br /> - Addenda as required for the City <br /> TASK 6—CONSTRUCTION PHASE SUPPORT estimated at 26 891 <br /> construction. Support will be limitedto <br /> Engineering during o <br /> CG ENGINEERING CG the construction contractor,permitting <br /> This tank representa ndnsultation by <br /> ort and periodic collaboration with the City, <br /> incidental nd o all at the direction of the City. <br /> agencies and others, eeting(not to exceed 8) <br /> 6.1 Attend weekly construction m <br /> 6.2 RFI.responses(not to exceed 20) <br /> 6.3 Submittal reviews(not exceed 1) ceed 4) <br /> 6.4 Site visit.(not <br /> s: and managing the construction contract and communicating <br /> AssumptionS submittal <br /> _ The City <br /> will take the lead in administering respect to involvement in project meetings,with the construct1on contractor-Engineering with Engineering <br /> City will provide direction to Cet ng request based on information provide to CG Eng <br /> reviews,issuing clarifications, 's <br /> scan be prepared at the Citymonths. <br /> - Record drawing to three <br /> by the contractor. ort Services will be up <br /> - The duration of the construction supe the City. <br /> Deliverables: Submittals, <br /> clarifications,and changes as requested by <br /> - Responses to RFPs, nested by the City <br /> - Records drawings,if req <br /> MURRAYSMITH: not to exceed 8) at City's request) <br /> 6.1 Attend weekly construction meeting(not <br /> — <br /> ventiru o —at improvements, e not to exceed 4) <br /> 6.2 Submittal <br /> (one additional isttae virit during clarifications) <br /> submittals related to to four design <br /> 6.3 Submittal reviews( to four RFI's and up <br /> 6.4 Clarifications and Changes(up <br /> Assumptions: <br /> ort services will be up to three(3) months. <br /> - The City will provide daily on-site inspection <br /> of the construction supp ave oversight of cohtactor s work and will take the leadin <br /> - The durationPage 4of5 <br /> Exhibit A—Scope of Work • <br /> __.__.___-- <br /> 33 <br />