My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/11/27 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/11/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 10:31:25 AM
Creation date
12/3/2019 10:23:54 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
z <br /> 1 <br /> t <br /> exemption request. The Contractor shall submit the final report or request further <br /> review of denied exemptions within 5 business days of receipt of the EFD response. <br /> Failure by the Contractor to meet submission dates will result in automatic waiver of <br /> exemption requests. <br /> 3.7 Quality Improvement Program R. <br /> The Contractor shall take all steps necessary to eliminate causes of poor response time <br /> performance and upon request shall provide the City with a summary of such corrective 1 <br /> i <br /> actions. In addition to the Quality Improvement reviews described in Patient Care <br /> Performance (Section 2.3 above),the reporting in Response Time Performance <br /> (Section 3 above)and its program for Quality-Improvement for Dispatch <br /> 1 <br /> Communications (Section 5.3 below), the Contractor shall develop and maintain a 1 <br /> 1 <br /> Quality Improvement Program that includes, at a minimum: R <br /> t <br /> 3.7.1 Review of incident reports with EFD and other governmental agencies to I <br /> evaluate Contractor's performance; <br /> 3.7.2 Establishment of a Quality Improvement peer review committee designed <br /> to review documentation and performance of pre-hospital care personnel; I, <br /> 3.7.3 Observation and evaluation of EMTs in the field, including patient <br /> assessment, diagnosis, protocol selection and compliance, and procedural 1 <br /> competency. <br /> I <br /> 3.8 Inquiries and Complaints <br /> The Contractor shall provide prompt written responses and follow-up to inquiries <br /> and complaints. Such responses shall ob a torlect to shall, on alimitations <br /> monthly basis, subm t <br /> sed by <br /> patient confidentiality restrictions. <br /> to EFD a list of all complaints received and their respective dispositions. Copies <br /> uest. Any <br /> of such complaints received <br /> ed wby City shall bebe made fle to the orwarded toy upon the Contractor for action and <br /> complaint received by thety <br /> the Contractor shall forward the disposition of the complaint to the City within <br /> fifteen business days of receipt. , <br /> 4.0 Factors of Production <br /> All equipment, supplies,facilities, locally assigned personnel, and other <br /> production factors utilized by the Contractor City or not,r the <br /> Contract resulting from this solicitation, hether furnished by the <br /> shall be devoted to the services under the Contract. <br /> 4.1 Initial Coverage Plan <br /> During the first three (3) months of operations, the Contractor shall adhere to the <br /> initial coverage plans submitted in its proposal or a modificationontractor's of f that plan an <br /> plan <br /> which is approved by the City. Thereafter, <br /> in of coverage may be altered by the Contractor to produce the required response <br /> 6 of 34 <br /> 49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.