My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/11/27 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/11/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 10:31:25 AM
Creation date
12/3/2019 10:23:54 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 'e <br /> Contractor shall pay liquidated damages to the City for failure <br /> r 2 which patient care <br /> standards and response time standards described inhere <br /> performance standards for the two fp trbeie classified as an alleged performanceonal levels. Every call that does not dfailu e. ( <br /> to the performance standards shall <br /> Each alleged performance failure shall be investigated by the Contractor and evaluated <br /> The Cityshall determine whether there were appropriate or acceptable <br /> by the City. contributed <br /> extenuating circumstances thacaused idated damages to thCty for all performance <br /> � <br /> failure. The Contractor shallpay q <br /> failures that are determined to be the fault of the Contractor and not the result ofan <br /> no c <br /> extenuating circumstance. All payments for liquidated damages shall be pay <br /> "City of Everett". <br /> s <br /> 11.4.1 For each Normal Operationsassessed liquidated damages at auest that drat 4of9 <br /> minutes,the Contractor shall bei <br /> fifty dollars ($50) per minute or fraction thereof for each minute late up to <br /> five minutes. For any response greater than herequest and minus late, the <br /> total Contractor fiv <br /> shall be deemed to have failed to respond to <br /> hundred dollars ($500) in liquidated damages will be assessed for a failed <br /> response. <br /> 11.4.2 For each Normal Operations "Code"liquidatedeest that exceeds damages at 59 of <br /> minutes,the Contractor shall be assessed fifty dollars($50) per minute or fraction thereof for each minute late up to � <br /> er than 5 minutes late, the <br /> ract <br /> five minutes. For any response respond t tot a request and a total tof f er <br /> shall be deemed to.have failed <br /> hundred dollars ($500) in liquidated damages will be assessed for a failed <br /> response. - <br /> 11.4.3 For each Modified Operations "Non-Code"liquidated 19:59 minutes the Contractor shall be assessedquid ted damages at a <br /> rate of fifty dollars ($50) per minute or fraction thereof for each minute up <br /> to five minutes. For any respa have failed to respond to the greater than 5 minutes e he and a <br /> e,the <br /> Contractor shall'be deemed t <br /> total of five hundred dollars ($500) in liquidated damages will be assessed <br /> for a failed response. <br /> 9 <br /> 11,4.4 For each Modified Operation "Code" requestttht t exc damagesdst sa 4:5ra of <br /> minutes,the Contractor shall be assessed liquidated <br /> fifty dollars ($50) per minute or fraction thereof for each minute up to five <br /> minutes. For any response greater than 5 minutes late,the Contractor <br /> shall be deemed to have failed to responddma tothe <br /> be assessed for a failed <br /> request and a total of five <br /> hundred dollars ($500) in liquidated damages <br /> response. <br /> 11.4.5 Liquidated Damages for Dropping Below 125%of Peak Coverage: <br /> For any day that the Contractor fails to have adequate vehicle inventory to <br /> 16 of 34 . <br /> 59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.