My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/11/27 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/11/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 10:31:25 AM
Creation date
12/3/2019 10:23:54 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> , I z <br /> i <br /> of the upcoming transition, the transition plan shall address how the <br /> Contractor intends to maintain/retain qualified personnel to meet its <br /> performance obligations under the Contract. <br /> D. Records. The transition plan shall provide for an oof orderly <br /> transferns pt of <br /> y thlll <br /> records, data, files or other information, regardless <br /> Contractor arising out of this Contract to the subsequent service provider or <br /> the City. No records, data, or information, regardless of source, shall be <br /> erased, discarded, removed from the premises or modified without the <br /> specific written approval of the City. Any information, spreadsheets, or data <br /> sets which may be required by this Contract, whether in hard copy, tape or 1 <br /> other electronic media, shall become the property <br /> of the City at the <br /> conclusion of the Contract. Any loss or damage to such records, materials or <br /> information, for any reason, shall be replaced /recreated by the City and the <br /> cost for such restoration shall be paid by the Contractor. This requirement <br /> shall not include materials proprietary to the Contractor except those items a <br /> necessary to satisfy reporting and other requirements of this Contract. 1 <br /> E. The transition plan shall address the Contractor's plan, if any, to "wind down" <br /> its operations in anticipation of the transfer of its operations to <br /> subsequent <br /> s14 <br /> event <br /> service provider or the City as the case may be; provided that, ! <br /> shall the Contractor be relieved from full compliance with the performance [ <br /> requirements of the Contract. The transition plan shall address the <br /> Contractor's plans, if any: to begin to reduce inventory;sand to <br /> oility leasee, <br /> assign or sublease existing equipment, vehicle, sere <br /> contracts, and subcontracts. <br /> F. Vehicles: To the extent the Contractor expects rservice provid <br /> er sfr er chicles, <br /> equipment and/or facilities to a subsequent <br /> the <br /> transition plan shall address the schedule(s) for such transfers and the <br /> transfer of all relevant records related thereto. Such records shall include but <br /> nuals, <br /> not be limited to leases,ocume documents, and any other documents or recordrating s related <br /> warranties, rfinancingingdoelated <br /> to the vehicles, equipment and/or facilities to be transferred. <br /> The City shall have thirty (30) days to accept or reject the transition plan. In the event <br /> that the City rejects the transition pllan,musthe beCity made all byathese the Contractorotracto tmeet the <br /> of the <br /> changes to the transition plan that <br /> requirements of this Subsection. The Contractor shall make the necessary changes to <br /> the transition plan within thirty (30) days. If the Contractor cannot or will not make the <br /> necessary changes, the City may make the changes, and the cost of the City in <br /> performing this work shall be the responsibility of the Contractor. <br /> Both parties shall operate in accordance with the approved transition plan for the <br /> remainder of the term of the Contract. Any approved changes to the transition plan <br /> shall be documented in writing signed by both parties. <br /> 26 of 34 <br /> 69 <br />
The URL can be used to link to this page
Your browser does not support the video tag.