My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9506 19TH AVE SE A T AND T ANTENNA 2018-01-02 MF Import
>
Address Records
>
19TH AVE SE
>
9506
>
A T AND T ANTENNA
>
9506 19TH AVE SE A T AND T ANTENNA 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2021 8:10:42 AM
Creation date
12/4/2019 9:37:32 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9506
Tenant Name
A T AND T ANTENNA
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTION REPORT <br />Date: Permit: �� / / 05 — eTT3 <br />Contractor. <br />Site Address: J (-' Y' ( ( 0 / (-' E /v <br />TYPE OF INSPECTION REQUESTED <br />ELECTRICAL <br />Temp Service <br />❑ Groundwork <br />Slab/Conduit <br />[]Rough In <br />❑ Service <br />U Grounding <br />❑ Ceiling Grid <br />❑ Electrical Final <br />SITE WORK <br />❑ Fooling drains <br />❑ Roof drains <br />MECHANICAL <br />❑ Groundwork/Slab <br />❑ Rough In <br />❑ Ceiling Grid <br />❑ OK to insulate <br />❑ Rooftop Units <br />❑ Mechanical Final <br />PLUMBING <br />❑ Groundwork/Slab <br />❑ Rough In <br />❑ Ceiling Grid <br />❑ OK to insulate <br />❑ Water Service <br />❑ Medical Gas <br />❑ Plumbing Final <br />GAS PIPE <br />❑ Rough InlService Hot Water Tank <br />❑ Refrigeration ❑ Rough In <br />❑ Gas Pipe Final <br />❑ WT Final <br />OTHER OR CONSULTATION: <br />❑APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br />❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br />❑ OK FOR C.O. ❑VIOLATION <br />❑ UNABLE TO PERFORM INSPECTION: <br />❑ CALL (425) 257.8881 FOR REINSPECTION • 24 hour notice required <br />BUILDING <br />❑ LIFER ground <br />❑ Footing <br />❑ Foundation <br />❑ Structural Slab <br />❑ Framing <br />❑ Insulation <br />❑ Drywall Nailing <br />❑ Shear Nailing <br />❑ Root Nailing <br />Ceiling Grid <br />❑ Building Final <br />Dater J — /' <br />Inspector: <br />EIR (41091 <br />/�A'n )�"ICl II IVMtA V�IIM(IIIIINS 1]i/UILIVMI <br />
The URL can be used to link to this page
Your browser does not support the video tag.