Laserfiche WebLink
recom:nend that a pzrimeter feoting drain systen be instalied because of the pouibility of <br /> seasonally perched ground water conditions at the sit�. We recommend that all roof drains be <br /> connecced to tightlines to divert rainwater to the storm Jrain system. <br /> Drainage of the p:ivement base course and subUace will decrease the risk of pavement <br /> distress. Small holes can be pmvided in that portion of catch basins adjacent to the subbase or <br /> base layer, provided that;he expected water level within the catch bacin will a:ways be below the <br /> e]evation of the holes. Tha holes should be wvered with a saitable geoteztile fabric placed <br /> xgainst the ouuide of the catch bazin to prevent pipinA of the subbaze or base material into the <br /> catch basin. <br /> SEISMICIT! <br /> 11�e: Puget :Sound region is seismically acNve and lies within Seumic Risk Zone 3 az <br /> clacsified by the Uniform Building Code ¢CBO 1991). As defined in the L'niform Building <br /> �a3e, the project site i� classified at Soil Profile Typt S2. <br /> LIMITATIONS <br /> We have prepazed this report for use by Costco Wholrsale, the Mulvanny Partnership and <br /> the design team in design of a portion of this project. 1'he data and report should be provided <br /> ta prospective conVacturs for their bidding or estirc,atine putposes, but our report, conclusions <br /> and interpretations should nut be cnnstrued ac a wazranty of subsurface cc�nditions. <br /> If there are changes in the grades, location, configuration or type of construction for die <br /> building, the waclusions and recommendations presented may not be applicable. If design <br /> changes aze made, we request that we be given the opportunity to review our conclusions and <br /> recommendations and to provide a written modification or verificatien. When the design has <br /> been finalized, we should be retained to review the appropriate portions of the drawings and <br /> specifications: ro see that our recommendations have been interpreted and implemented as <br /> intended. <br /> The scope of our services does not include services relateA to constructiun safety <br /> precautions and our recommendations are not intended to direct the contractor's methods, <br /> techniques, sequences or procedures, except as specifically describzd in our report .`or <br /> consideration in design. <br /> There aze probable vaziations in subsurface conditions between the enplorations and also <br /> that may occur with time. A contingency for unanticipated conditions should be includad in the <br /> budget and schedule. Su�cient monitoring, testir,g and consultation by our firm should be <br /> provided during conswction to cor.firm that the conditions encountered are consistent with tho�e <br /> indicate� hy the explorar'ons, to provide re�ortvnendations for design changes if the conditions <br /> revealett during construction differ from those anticipated,and to r.valuate whether earthwork and <br /> foundation installation activities cumply with contract plant and specifications. <br /> G e o E n g i n a e r s IO File No.0975-017-R93/061993 <br />