Laserfiche WebLink
Run Date: 7/1/2013 City of Everett-Public Works Department Cutoff Date: 6/7/2013 <br /> Time: 12:06 PM Contract Estimate Voucher <br /> Project: 289 For Work Order#3443 Contractor: SRV CONSTRUCTION,INC. <br /> • <br /> WATER MAIN IMPROVEMENT K Estimate#13 P 0 BOX 481 <br /> WO 3443 BID:$1,996,149.07 OAK HARBOR WA 98277 <br /> TOTAL BID:$2,496,273.27 <br /> Unit Plan Total Previous Present Total Previous Present <br /> Item# Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount <br /> 0053 Curb Ramp Type A,B,C or D EA 1,350.00 5.00 5.0000 5,0000 0.0000 6,750.00 6,750.00 • 0.00 <br /> 0054 Temp.Pavement Marking LS 1,650.00 1.00 1.0000 1.0000 0.0000 1,650.00 1,650,00 0.00 <br /> 0055 Permanent Pavement Marking LS 2,675.00 1.00 1.0000 1.0000 0.0000 2,675.00 2,675.00 0.00 <br /> 0056 Material on Hand DOLLA 1.00 118,846.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0057 Materials on Hand#2 DOLLA 1.00 31,934.72 0.0000 0.0000 0.0000 0.00 0.00 0.09 <br /> 0058 Materials on Hand#3 DOLLA 1.00 44,872.05 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0059 6"Ductile Iron Pipe LF 61.65 288.00. 288.0000 288.0000 0.0000 17,755,20 17,755.20 0.00 <br /> 0060 Material on Hand#4 DOLLA 1.00 5,491.00 0.0000 _0.0000 0.0000 0.00 0.00 0.00 <br /> 0061 Materials on Hand#5 DOLLA 1.00 68,493.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 r- <br /> 0062 Revised HMA Patch TN 64.29 1,204.12 1,204.1200 0.0000 1,204.1200 77,412.87 0.00 77,412.87 <br /> ml- <br /> Work Order Totals: 1,961,495.15 1,847,637.64 113,857.51 <br />