Laserfiche WebLink
Praject De�cription � <br />8riefly describe mechanical system <br />antl features. <br />❑ Indudes Poans <br />TWO NEW ROOFTOP DOWN-FLOW GAS PACKS WITH NEW MAINS AND <br />BRANCHES IN DROP CEILING. ADDED SUPPLY OUTLETS TO 2ND FLOOR. GAS <br />PIPING. UNIT HEATER. CEILING PADDLE FAN. <br />documentetion requiring compliance with commissioning requirements, Section 1416. <br />I Q Simple System Q Complez Syslem (� Systems Analysis <br />Compliance Option (See Decision Flowchart (over) for qualifiwlions. Use separete MECH•SUM tor simpie & wmplex syateme.) <br />Equipment Schedules I The following intormation is required lo be inwrporeled with the mechanicai equipment schedules on tha <br />plans. For projects without plans, fill in the required infortnation below. <br />'If available � As tested accordmg to Table 14-1, 14-2 or 14-3. � I( required. � COP, HSPF, Combustion Efficiency, orAFUE, as <br />applirable. ° Flow conVol rypes: variable air volume(VA�, constant volume (CV), or vanable speed (VS). <br />