My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1304 80TH ST SW EVERETT SCHOOL DISTRICT 2018-01-02 MF Import
>
Address Records
>
80TH ST SW
>
1304
>
EVERETT SCHOOL DISTRICT
>
1304 80TH ST SW EVERETT SCHOOL DISTRICT 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2019 7:26:51 AM
Creation date
12/12/2019 7:07:29 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1304
Tenant Name
EVERETT SCHOOL DISTRICT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subsurface Erploration and <br /> Everett Bits Facility Geotechnical Engineering Report <br /> Everett, Nashingmn Design Recommendations <br /> geotechnical engineer, placed in maximum 10-inch loose lifts with each lift being compacted to <br /> at least 95 percent of the modified Proctor maximum density using ASTM:D-1557 as the <br /> standard. <br /> The contractor should note that any proposed fill soils should be evaluated by AESI prior to <br /> their use in fills. This would require that we have a sample of the material 72 hours in <br /> advance to perform a Proctor test and determine its field compaction standard. Soils in which <br /> the amount of fine-grained material (smaller than the U.S. No. 200 sieve) is greater than <br /> approximately 5 percent (measured on the minus U.S. No. 4 sieve size) should be considered <br /> moisture-sensitive. Use of moisturc-sensitive soils in structural fills should be limited to <br /> favorable dry weather and near-optimum subgrade moisture conditions. <br /> The on-site till soils are suitable for use as structural fill provided they can be dried to near- <br /> optimum moisture ontent as they contained significant amounts of silt and are considered <br /> moisturc-sensitive. If the upper 2 feet of the existing fill materials can be moisture-conditioned <br /> and recompacted to a firm and unyielding condition, they can be used for pavement support. <br /> Construction equipment traversing the site when the soils are wet can cause considerable <br /> disturbance. if rill is placed during wet weather or if proper compaction cannot be obtained <br /> due to wet subgrade or soil conditions, a select material consisting of a clean, free-draining <br /> gravel and/or sand should be used. Free-draining fill consists of non-organic soil with the <br /> amount of fine-grained material limited to 5 percent by weight when measured on the minus <br /> U.S. No. 4 sieve fraction and at least 25 percent greater than the No. 4 sieve. <br /> 7.2 Construction Monitoring <br /> A representative from our firm should inspect the stripped subgrades and be present during <br /> placement of structural fill to observe the work and perform a representative number of in- <br /> place density tests. In this way, the adequacy of the earthwork may be evaluated as filling <br /> progresses and any problem areas may be corrected at that time. It is important to understand <br /> that taking random compaction tests on a part-time basis will not ensure uniformity or <br /> acceptable performance of a fill. As such, we are available to aid you in developing a suitable <br /> monitoring and testing frequency. <br /> 8.0 PAVEMENT DESIGN RECOMMENDATIONS <br /> We anticipate that asphalt paving will be used for the new drive and bus parking area. Asphalt <br /> pavement design is a compromise between initial cost and expected design life. In order to <br /> provide a 20-year design life with normal maintenance for areas that support passenger car <br /> driving and parking, we recommend a pavement section consisting of 3 inches of asphalt <br /> surfacing above 4 inches of crushed surfacing base course per Washington State Department of <br /> Transportation (WSDOT) Standard Specification 9-03,9(3) above a granular (till or structural <br /> November 28, 2005 ASSOCIATED EAR771.SCIENCES, INC. <br /> EG11d-KE036022-Pro/fm120036021UMP 11age 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.