Laserfiche WebLink
Everett School District— Bus Facility <br /> March 24, 2006— Storm Drainage Report <br /> Page 3 <br /> A small amount of offsite area drains onto the project site. This area is located just off <br /> the west property line and is comprised of a 10 foot wide landscaped slope for the entire <br /> distance of the west property line (please see Proposed Areas Figure in Appendix A). <br /> Above and west of th. landscaped slope is asphalt pavement for parking for the <br /> neighboring property. Stormwater from this asphalt area is contained Ln the <br /> neighboring property and conveyed away from the subject project site. <br /> Snohomish County Soil Survey mapping for the area Indicates that soils onsite consist of <br /> "Alderwood Urban Land Complex"soils (2-8% slopes). Alderwood Gravelly Sandy loams <br /> are a Hydrologic Soil Group Type 'C' soil. The geotechnical engineering report (see <br /> Section VII) confirms that soils onsite generally consist of fill that is overlying glacially <br /> consolidated "till" soils. A small portion of the northeast site, near the existing wetland, <br /> contain thin layer of peat and lacustrine sand below the fill. <br /> Existing conditions used for calculations were assumed to be prior to site development in <br /> 1980 to closer mimic existing runoff rates from the project site (further described in <br /> Section V. under Runoff Control Analysis). See Appendix A for Existing Site Coverage <br /> areas map. The existing condition areas were compiled from the original storm drainage <br /> reports by Kegel & Associates, Inc. and Lovell-Sauerland & Associates, Inc. See <br /> Appendices D & E for Storm Reports. The project area analyzed for flow control <br /> Includes approximately 7 acres. <br /> The following table gives the existing condition land use covers and respective Curve <br /> Numbers for the existing drainage area for Type'C'soils. <br /> Table 1. Existing Area S readsheet Pre-1980 <br /> Total Existing <br /> On Site Off Site Drainage Area <br /> Tvpe Area Acres Area Acres Acres <br /> Pervious -Gravel <br /> CN = 89 1.31 0.89 2.20 <br /> Pervious -Pasture <br /> CN = 85 1.31 0.89 2.20 <br /> Pervious -Second Growth <br /> CN = 81 2.63 1 0 2.63 <br /> Sub-Total Draina a Area 5.25 1.78_ _. 7.03 <br /> Proposed Conditions <br /> The proposed bus facility for the Everett School District will develop approximately 5.2 <br /> acres of the proposed project site. The existing metal fabrication building located near <br /> the northwest corner of the property will be renovated to accommodate school bus <br /> drivers. All other existing structures on-site are planned to be demolished. <br />