My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1304 80TH ST SW EVERETT SCHOOL DISTRICT 2018-01-02 MF Import
>
Address Records
>
80TH ST SW
>
1304
>
EVERETT SCHOOL DISTRICT
>
1304 80TH ST SW EVERETT SCHOOL DISTRICT 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2019 7:26:51 AM
Creation date
12/12/2019 7:07:29 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1304
Tenant Name
EVERETT SCHOOL DISTRICT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Everett School District— Bus Facility <br /> March 24, 2006 — Storm Drainage Report P E <br /> Page 5 <br /> III. OFFSITE ANALYSIS <br /> Level 1 Downstream Analysis <br /> Task 1. Study Area Definition and Maps <br /> For purposes of the following tasks 2, 3, 4 and 5, the study area shall extend <br /> downstream to a point on the drainage system where the proposed project site <br /> constitutes a minimum of 15% of the total tributary drainage area, but not less than 1/4 <br /> mile. <br /> The 5.2 acre Everett School District project site is comprised of two parcels and is <br /> located at 1220 8& Street SW and 1304 80`" Street SW (Tax Parcel #'s <br /> 00392200001802, and 00392200001902 respectively) In Everett, WA 98203. This site is <br /> furthermore situated within the SW Quarter of Section 11, Township 28 North, Range 4 <br /> East, W.M., In Snohomish County, Washington. <br /> Task 2. Resource Review <br /> A resource review was conducted to determine potential problems downstream of the <br /> project site. The following is a list of references used in gathering information for the <br /> downstream analysis. <br /> • Site Survey by Harmsen Associates, Inc., November 13, 2003 <br /> • Snohomish County SCOPI Data <br /> • Field Inspections completed by PACE, September 28, 2005 <br /> and November 11, 2005. <br /> Task 3. Field Inspection <br /> A Level 1 downstream analysis was conducted In the early afternoon on November 11, <br /> 2005. Weather was cloudy with drizzle and temperatures in the low 40's. Approximately <br /> 1/4 to +/x Inch of rain had fallen the previous 24 hours. <br /> The downstream analysis was performed to assess potential offsite drainage Impacts <br /> associated with development of the project site, and to propose appropriate midgations <br /> of those Impacts as necessary. Please see Figure 2 for a map of the downstream flow <br /> path. <br /> Task 4, Drainage System Description <br /> The existing on site stormwater runoff conveyance system currently discharges <br /> stormwater at the northeast corner of the project site. The discharged stormwater is <br /> released Into an existing wetland located on neighboring property just east of the <br /> project site. See Appendix G for further information regarding this wetland. Stormwater <br /> exits the wetland toward the north across 80`" Street SW through a 15"concrete culvert <br /> for approximately 160 feet. Stormwater flows Into a type 2 catch basin located in the <br /> parking lot of the Hot Shots golf range. This catch basin receives flow from the golf <br />
The URL can be used to link to this page
Your browser does not support the video tag.