My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1304 80TH ST SW EVERETT SCHOOL DISTRICT 2018-01-02 MF Import
>
Address Records
>
80TH ST SW
>
1304
>
EVERETT SCHOOL DISTRICT
>
1304 80TH ST SW EVERETT SCHOOL DISTRICT 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2019 7:26:51 AM
Creation date
12/12/2019 7:07:29 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1304
Tenant Name
EVERETT SCHOOL DISTRICT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
please refer to Section 44 of the Zoning Code). Contact the Planning D3partmenl for <br /> information regarding appeals processes: for the requirements listed in this document. <br /> AGENCIES WITH JURISDICTION <br /> The applicant/owner is responsible for obtaining all necessary permits and arprovals. The <br /> following list may not be complete. <br /> 1. Washington State Department of Ecology: National Pellulant Discharge Elimination <br /> System (NPDES) permit and stormwater construction permit. <br /> 2. Puget Sound Clean Air Agency: Air Quality Permit <br /> 3. Washington Stab Department of Labor and Industries: Construct;on Permits <br /> 4. Snohomish Health District <br /> OTHER REQUIREMENTS <br /> 1. A Public Works Permit is required for this project. Detailed drawings in accordance with City <br /> Design and Construction Standards shall be submitted to the Public Works Department, <br /> showing site parking layout, landscaping, utilities, storm drainage, temporary construction <br /> erosion control. Public Works Department approval of these drawings is required prior to <br /> any permits being issued. All imxovements shall be completed, approved and warranted <br /> before the Occupancy Permit is issued/final approval is granted. <br /> 2. Parking must be per City Zoning Code and City Design and Construction Standards for <br /> Development. <br /> 3. This project must comply with the current City o/ Everett Building Code and Sprinkler <br /> Ordinance. <br /> 4. Special charges for connection to the sewer and water systems in accordance with <br /> Ordinance 1998-94 and subsequent revision are applicable. These charges are based on <br /> projected water usage and can be substantial. Applicant is encouraged to obtain a copy of <br /> the Ordinance and determine estimated charges prior to building permit application. The <br /> actual charges shall be computed by the Public Works Department per the ordinance in <br /> effect at the time and according to the information on the approved plans at the time of <br /> building permit issuance. <br /> 5. In accordance with the City of Everett Traffic Mitigation Ordinance, a Traffic Mitigation fee of <br /> $41, 560.00 is required to be paid prior to the issuance of building permits. <br /> 6. Approval of construction plans will require demonstration that all pertinent standards and <br /> regulations are met. <br /> T City streets and alleys are to be kept clear of dirt and debris at all times during construction. <br /> Dust suppression and street cleaning must occur as directed by the Public Works Inspector. <br /> 8. As-builts of storm sewer, sanitary sewer, and water systems will be required to be submitted <br /> per City Design and Construction Standard-, and Specifications for Development. <br /> 9. Any broken or damaged sidewalk shall be repaired/replaced per the City Public Works <br /> Inspector. <br /> 10. Walkways must be provided from the building enirance to the public sidewalk. <br /> t�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.