Laserfiche WebLink
2003 Washington State Nonresidential Ene Code Com liance Form <br /> Mechanical Summary MECH-S,;o <br /> 1004 WANmpinn Stare NmreudMW Eome,Cade Camp4eace Fond "'N.M W,2005 <br /> Project Info Project Address Now ere Facility for Everett senocl District Data 5/3/2006 <br /> 1104 Both Stem! 904 For Building Dept.Use <br /> Everett, MA 99303 <br /> Applicant Name-. Everett school District <br /> Applicant Address 3115 oats. Ave. Everett, VA 98201 <br /> Applicant Phone. e25-384-4190 <br /> Project Description Air Cooled, constant volume split systems providing cooling and gas <br /> Briefly describe mechanical healing. <br /> system type and features <br /> UJIld6udes flans Drawings must contain notes requireing compliance with commissioning requirements-Section 1410 <br /> I Q Simple System O Complex System O Systems Analysis <br /> Compliance Option <br /> (see Decision Flowchart(over)for quDliricalions.Use separate MECH•SUM for simple 6 complex systems.) <br /> Equipment Schedules The following Information Is required to be incorporated with the mechanical equipment schedules on the <br /> plans. For projects without plans,fill In the required information below. <br /> Cooling Equipment Schedule <br /> Equip Capacity' OSA CFM SEER <br /> ID Brand Name' Model No Blulh Total CFM or Ecuno7 urEER IPLV' Location <br /> Be. Schedules <br /> liciali ig Equipment Schedule <br /> Equip Capacity' OSA ctm <br /> ID Brand Name' Madel No ' Blurb Total CFM or EeonoT Input Stun Output Bluh Efficiency' <br /> See Schedule. <br /> Fan Equipment Schedule <br /> Equip <br /> ID Brand Namn' Model No CFM SP' HPIBHP Flow Control' Location of Service <br /> Be. 6chedule. <br /> 'If available. 'As tested according to Table 14.1A through 14-1G 'If required 'COP.HSPF,Combuslion Efficiency.or AFUE,as <br /> applicable. 'Flow control typesvariable air volume(VAV),constant volume(CV),or variable speed(VS) <br />