My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1304 80TH ST SW EVERETT SCHOOL DISTRICT 2018-01-02 MF Import
>
Address Records
>
80TH ST SW
>
1304
>
EVERETT SCHOOL DISTRICT
>
1304 80TH ST SW EVERETT SCHOOL DISTRICT 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2019 7:26:51 AM
Creation date
12/12/2019 7:07:29 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1304
Tenant Name
EVERETT SCHOOL DISTRICT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2003 Washington State Nonresidential Ene Code Com liance Form <br /> Mechanical Summary MECH-S,;o <br /> 1004 WANmpinn Stare NmreudMW Eome,Cade Camp4eace Fond "'N.M W,2005 <br /> Project Info Project Address Now ere Facility for Everett senocl District Data 5/3/2006 <br /> 1104 Both Stem! 904 For Building Dept.Use <br /> Everett, MA 99303 <br /> Applicant Name-. Everett school District <br /> Applicant Address 3115 oats. Ave. Everett, VA 98201 <br /> Applicant Phone. e25-384-4190 <br /> Project Description Air Cooled, constant volume split systems providing cooling and gas <br /> Briefly describe mechanical healing. <br /> system type and features <br /> UJIld6udes flans Drawings must contain notes requireing compliance with commissioning requirements-Section 1410 <br /> I Q Simple System O Complex System O Systems Analysis <br /> Compliance Option <br /> (see Decision Flowchart(over)for quDliricalions.Use separate MECH•SUM for simple 6 complex systems.) <br /> Equipment Schedules The following Information Is required to be incorporated with the mechanical equipment schedules on the <br /> plans. For projects without plans,fill In the required information below. <br /> Cooling Equipment Schedule <br /> Equip Capacity' OSA CFM SEER <br /> ID Brand Name' Model No Blulh Total CFM or Ecuno7 urEER IPLV' Location <br /> Be. Schedules <br /> liciali ig Equipment Schedule <br /> Equip Capacity' OSA ctm <br /> ID Brand Name' Madel No ' Blurb Total CFM or EeonoT Input Stun Output Bluh Efficiency' <br /> See Schedule. <br /> Fan Equipment Schedule <br /> Equip <br /> ID Brand Namn' Model No CFM SP' HPIBHP Flow Control' Location of Service <br /> Be. 6chedule. <br /> 'If available. 'As tested according to Table 14.1A through 14-1G 'If required 'COP.HSPF,Combuslion Efficiency.or AFUE,as <br /> applicable. 'Flow control typesvariable air volume(VAV),constant volume(CV),or variable speed(VS) <br />
The URL can be used to link to this page
Your browser does not support the video tag.