Laserfiche WebLink
KLAP ENBACH <br /> A R c H I T E C T 8 <br /> Suite 620 <br /> 1402 Third Avenue <br /> Seattle,WA 98101 <br /> Tel.206.624-7515 <br /> Fax 206-624-7516 <br /> August 15,2006 <br /> Mr.Jim Jimerson,Senior Planner <br /> Planning and Community Development <br /> City of Everett <br /> 2930 Wetmore Avenue, Suite 8-A <br /> Everett,Washington 98201 <br /> PROJECT: NEW BUS FACILITY <br /> JOB ADDRESS 1304-BOTH AVENUES-r -51") <br /> PLAN REVIEW NUMBER: 80605.010 <br /> Dear Mr.Jimerson: <br /> Thank you for your review. I will outline our response to your letter dated May 9, 2006. We are also <br /> providing with this response new copies of sheets as listed below. Those sheets that were revised are <br /> Identified with a*Permit Revision"dated 8!10106 on the lower right side. <br /> Original Item 1: Construction staging areas must be located outside environmentally sensitive areas and <br /> their buffers unless determined by the Planning Director to be Infeasible. Revise construction plans to <br /> clearly Identify location(s)of equipment and material staging areas. <br /> • See revised A0.01 with construction staging area identified on drawing. <br /> Original Item 2: Place(listed)notes on the construction plans: <br /> • Notes have been added. See revised C1.0. <br /> Original Item 5: Correct the location of the split rail fence(as shown on 1-1.1). <br /> See revised Ll.I. <br /> Just to confirm, all Items listed under No. 3 of your letter have been worked out with Briana Pavey with <br /> Shockey Brent, Inc. The information requested in Item 4 was submitted previously. Item 6 will be <br /> Implemented at the appropriate time. <br /> Yours very truly, <br /> KLAPPENB HVAIA <br /> Dale A. Klappen <br /> ESD18.15.06 <br /> New Bus Facility.Bldg. Off. -#2 <br />