Laserfiche WebLink
7 <br /> NOTICE OF COMPLETE APPLICATION <br /> and <br /> PLANNED ACTION DETERMINATION <br /> SEPA06.012 <br /> Transportation Facility <br /> April 17, 2006 <br /> DESCRIPTION OF PROPOSAL: The proposed action is to establish a bus parking and <br /> indintenance facility. <br /> PROPONENT: Everett School District No. 2 <br /> PO Box 2098 <br /> Everett,WA 98203 <br /> PROPONENT'S <br /> REPRESENTATIVE. Camie Anderson, <br /> Shockey/Brent <br /> 2716 Colby Ave <br /> Everett,WA 98201 <br /> LOCATION: 1304 80TH ST SW <br /> ZONING: M-M Business Park <br /> GENERAL PLAN: 5.3 Light Industry <br /> Lead Agency: City of Everett Planning Department <br /> Contact Person: John Jimerson Phone: (425)257-8731 <br /> The City of Everett Planning and Community Development Director has determined that: <br /> • The project is located within the boundaries of the Southwest Everett Subarea Plan. <br /> • The zoning designation of the property upon which the project is proposed is consistent with <br /> those designations analyzed in the Southwest EvereluPaine Field Subarea Plan and EIS, <br /> December 1996. <br /> • The proposed use is consistent with the uses and intensities allowed in the City's <br /> development regulations and is listed as a use analyzed in the final EIS, Tables 3.1-1 and <br /> 3.1-2. <br /> • The project is a use that implements the Subarea Plan and the prniect's significant <br /> environmental imp. cts have been adequately addressed in the SI Everett/Paine Field <br /> Subarea Plan EIS. <br /> • The project's significant adverse environmental impacts will be mitigated through the <br /> application of the mitigation decision document. These mitigation measures, along with <br /> other City requirements and conditions, constitute sufficient mitigation for the significant <br /> environmental impacts associated with the proposed project. <br /> • The proposed project must comply with all applicable local, state and federal regulations <br /> and development standards. <br /> • The proposed project is not an essential public fac;iity. <br /> The project proponent has agreed to comply with the SW Everett Subarea Plan Mitigation <br /> Decision Document. The project is hereby designated a Planned Action pursuant to RCW <br /> /l� <br />