My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Dept of Transportation 11/12/2019
>
Contracts
>
6 Years Then Destroy
>
2021
>
WA ST Dept of Transportation 11/12/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2019 9:49:12 AM
Creation date
12/12/2019 9:48:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Dept of Transportation
Approval Date
11/12/2019
Council Approval Date
10/30/2019
End Date
6/30/2021
Department
Administration
Department Project Manager
Bob Bolerjack
Subject / Project Title
Transportation Demand Management
Tracking Number
0002111
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Survey all CTR worksites <br /> as required in either the fall <br /> or spring survey period <br /> Coordinate with WSDOT; All sites have completed <br /> Survey administration follow up with employers; <br /> provide technical the required state survey <br /> assistance <br /> Review CTR aggregate <br /> report for accuracy <br /> Require all CTR worksites Completed program <br /> Program reports to submit employer <br /> biannual program reports reports <br /> Potential risks <br /> Extensive staff time is needed to assist employers with surveys (especially paper <br /> surveys) and ensure completion. This can lead to work slowdown in other areas of this <br /> plan. <br /> State-employee Guaranteed Ride Home program <br /> Brief description of <br /> Strategy activities and Deliverables <br /> outputs <br /> Administer program to provide <br /> guaranteed transportation in <br /> Administer program unplanned situations to all CTR- <br /> to provide guaranteed affected employees that choose <br /> transportation in All eligible employees transportation options to driving <br /> unplanned situations receive guaranteed alone <br /> to employees that ride home when <br /> choose transportation needed Administer GRH program for non- <br /> options to driving affected worksites —we have one <br /> alone (State Attorney General's Everett <br /> office) <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.